Global Systems Management Surface Visibility Presented by USPS at July 10 Packages Subgroup Meeting.

Slides:



Advertisements
Similar presentations
STEP 1 ARRIVAL OF MERCHANDISE AND DOCUMENTATION The merchandise arrives at the broker's terminal on the U.S. side of the border. The commercial invoice.
Advertisements

® Service Performance Measurement using Intelligent Mail & Seamless Acceptance.
1 Wednesday, Sept. 17, 2008 It’s Time for Intelligent Mail ® : Overview and Value of Intelligent Mail ®
® Business Mail Acceptance May 20, ®  Business Mail SOX Compliance  Business Mail Entry Vision Business Mail Acceptance.
Service Performance Measurement using Intelligent Mail & Seamless Acceptance.
Seamless Acceptance Pritha Mehra, USPS Manager, Marketing Technology & Channel Management.
Understanding & Using the USPS DSMS System The Benefits, Requirements Added Value of the Drop Ship Management System.
1 4-State Barcode Implementation 6060 PRIMACY PKWY STE 201 MEMPHIS TN John Doe 6449 AMBERVIEW CV MEMPHIS TN #BWNGKVN #
Reduce Postage Costs and Improve Delivery, Combined Mailing Solutions PCC Mailers Forum 2014 September 10 th, 2014 Deborah Damore Fairrington Transportation.
Business Mail Acceptance Update Mailer’s Technical Advisory Committee (MTAC) November 19, 2009 Pritha Mehra Frank Neri Bob Galaher.
Full Service and The Future of Mail Acceptance Anthony Loera Supervisor, Business Mail Entry 1.
Visibility Strategy September, Visibility Today CONFIRM provides piece level mail processing data that can be used for tracking for letters and.
Business Customer Gateway 1 PCC Mailer’s Education Seminar Reno Nevada May 20, 2010 Business Customer Gateway Michael Hemphill CSG Direct, Inc.
2007 National PCC POWERING UP YOUR BUSINESS with Intelligent Mail®
CSA Simplification March 1, CSA Simplification  CSA to eDoc Association will be modified in June  No changes to CSA file downloaded from FAST.
MTAC Workgroup 114 Establish Service Standards and Measurement First-Class Mail Measurement July 24, 2007 FCM Subgroup Meeting.
Overview of Scanning Presented by Tom Day Senior VP, Intelligent Mail & Address Quality Friday, February 20, 2009 Webinar #14.
1 MTAC Workgroup 117 October 22, 2007 Washington DC.
1 Pritha Mehra Vice President, Mail Entry and Payment Technologies Mail Entry and Payment Initiatives.
FAST for Periodicals MTAC Workgroup 95 Washington, D.C. November 8, 2007.
Network Rationalization Mail Moves, Labeling Lists and Mail Direction File Industry Webinar July 1, 2013 To listen to a recording of this presentation.
Improving the Drop Shipment Process MTAC Workgroup #87 Washington, D.C. January 30, 2008.
Status of NDC Activations MTAC Briefing August 12, 2009.
November 01, 2005 MTAC 93 Design & Concept Testing Workgroup Status.
® MTAC Workgroup 114 Establish Service Standards and Measurement USPS Service Measurement Capability July 31, 2007.
MTAC Workgroup 93 Streamlining Verification Debbie Cooper Bob Galaher May 18, 2005 Washington DC.
Corporate Automation Plan PHASE 2 February 4, 2004Washington D.C.
EInduction Overview 1 eDropship Post-Induction Process October 6, 2010 MTAC Workgroup 138.
® Mail Technical Advisory Committee Workgroup 142 Industry Sponsor - Wendy Smith Industry Co-chair – Tom Underkoffler USPS Co-chair – Robert Raines.
Acceptance and Induction: The Mailing Industry’s Digital Revolution IDEAlliance Print Distribution April 22, 2007 Debbie Cooper.
1 Presentation Topics Agenda  January Release  BMA Channel Strategy –eDropship –Expanded Start-the-Clock  MTAC Workgroups.
Corporate Flats Strategy MTAC November 7, Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.
Moving the Mail. NETWORK FACILITES NDC NETWORK RE-EGGINEERING HOW YOUR MAIL MOVES IMPROVING THE PARNTERSHIP.
MTAC Meeting February 23, 2005 Integrated Mail Management.
Intelligent Mail February Vision Provide end-to-end visibility and a seamless process for mail acceptance and delivery, using standardized intelligent.
EInduction Overview 1 eDropship Induction Process September 8, 2010 MTAC Workgroup 138.
EInduction Overview 1 eDropship Post-Induction Process November 15, 2010 MTAC Workgroup 138.
1 PACKAGE VISIBILITY PROJECT Jim Cochrane & Gary Reblin Mailer’s Technical Advisory Committee.
USPS Product Information MTAC Jim Cochrane Vice President, Product Information February 17, 2011.
Mail Acceptance and Induction Seamless Mailing with Intelligent Mail Barcodes Debbie A. Cooper Quebecor World Logistics.
® Customer Supplier Agreements Presented by Pritha Mehra Vice President, Business Mail Entry Friday, October 17, 2008.
® Intelligent Mail® and Start-the-Clock (101) Presented by Pritha Mehra, Vice President, Business Mail Entry Friday, October 10, 2008.
MTAC Workgroup 102 Advance Notification, Streamlined Acceptance & Visibility for First-Class Mail May 16, 2007.
MTAC Workgroup # 87 Update Improving the Drop Shipment Process Washington, D.C. May 18, 2006.
® Mail Technical Advisory Committee Workgroup 142 Industry Sponsor - Wendy Smith Industry Co-chair – Tom Underkoffler USPS Co-chair – Robert Raines.
MTAC Workgroup 93 Streamlining Verification Debbie Cooper Bob Galaher Feb 22, 2006 Washington DC.
GLA FOCUS GROUP August 20, MAILING INDUSTRY ECOSYSTEM 2 Mail Owners E-Commerce Logistics Printers & Mailers Software Vendors Equipment Manufacturers.
Improving the Drop Shipment Process MTAC Workgroup 87 Update Washington, D.C. August 2, 2007.
® Intelligent Mail Measurement Readiness. Letters - Automation Data Capture PointTechnologyTimelineBarrier Start the Clock: Induction Acceptance scans.
2007 National PCC POWERING UP YOUR BUSINESS with Intelligent Mail ®
MTAC Workgroup #87 - Update Improving the Drop Shipment Process August 3, 2006.
MTAC Work Group #82 Parcel Delivery Performance Measurement Effectiveness.
Advance Notification Streamlined Acceptance and Visibility for First-Class Mail MTAC Workgroup 102.
1 Service Performance Measurement System & Intelligent Mail® Barcodes MTAC – January 31, 2008.
MTAC Workgroup 102 Update Advance Notification, Streamlined Acceptance & Visibility for First-Class Mail January 2008.
® Intelligent Mail Measurement Readiness June 13, 2007 Full WG Meeting.
1 Intelligent Mail ® Barcode Implementation Federal Register Notice ©USPS2007.
MTAC Workgroup 114 Establish Service Standards and Measurement Standard Mail Measurement July 30, 2007 Std Subgroup Meeting.
EInduction Overview 1 eDropship Post-Induction Process TBD MTAC Workgroup 138.
1 MTAC Workgroup 117 October 12, 2007 Washington DC.
Streamlining Verification MTAC Workgroup Mission Statement: –Collectively determine how the USPS and the Industry can leverage existing, or guide.
® Webinar #10 Commercial First-Class Mail and Standard Mail Measurement Presented by Tom Day Senior Vice President, Intelligent Mail and Address Quality.
1 Intelligent Mail Barcodes Mail Preparation MTAC November 8, 2007.
1 Start-the-Clock for Non Full-Service Mailings MTAC 139 November 17, 2010 Rose FlanaganChris Simone Data-Mail IncUSPS.
Improving the Drop Shipment Process Update MTAC Workgroup #87 Washington DC – August 18.
1 MTAC Work Group 138 eDropship November 18th, 2010.
Colleges & Universities Delivery Partners Program
Capital metro Area focus group
Southern Area Isaac Cronkhite Mailing Industry Focus Group Meeting
Seamless Acceptance Pritha Mehra, USPS Manager, Marketing Technology & Channel Management.
Presentation transcript:

Global Systems Management Surface Visibility Presented by USPS at July 10 Packages Subgroup Meeting

Global Systems Management 2 Surface Visibility Overview  Surface Visibility Components:  Uniquely Identifying Assets (sacks, trays, mail transport equipment, trailers)  Tracking Assets at key handoff points (arrival, departure, interim points)  Quality Checks (preventing mis-loads and mis- routings in real time)  Electronic Forms (automate data collection)  Decision Support (improved dock management and advance notifications)

Global Systems Management 3 Tracking Assets Trailer Arrive Trailer Unload Ready to Process To Operations… Inbound Facility Scanning Outbound Facility Scanning Trailer Depart Container Load Placard Assign Container Build Container Close Container Stage (Optional)

Global Systems Management 4 Quality Checks  Quality checks are built into the scanning process  As scans are collected, the destinations are verified − Handling unit to container − Container to trailer  The employee is notified of potential mis-loads  Reduces missent mail

Global Systems Management 5 Electronic Forms  Electronic Forms will automate many of the manual procedures on the dock – Many values pre-populated – % loaded is calculated based on container scans – Arrival and departure times based on scans – Security seal is scanned; not keyed in  Electronic Forms eliminate redundant data entry – saving time and reducing errors

Global Systems Management 6 Decision Support  Visibility information enhances operational decision making  Facilities have real-time view of container status on the dock  Destination facilities receive advanced notification of inbound trailer status: –Containers by Type –Handling unit counts by mail class and type –Actual departure times, estimated time of arrival Red Circle = Containers in Process Yellow Triangles = Closed Containers Blue Plus Signs = Staged Containers Green Squares = Loaded Containers

Global Systems Management 7 Service Improvements  Dock employees have visibility as containers are being built inside the plant to help ensure that all available containers are loaded prior to trucks departing.  Ability to track trailers that are late departing or arriving.  Visibility as mail moves between origin and destination plants including interim facilities such as HASPs.  Visibility of inbound volume enables scheduling adjustments by destinating plant.

Global Systems Management 8 Mail Induction Scheduled appointments provide Advanced Notification of drop shipment mail volumes which facilitates the check-in, induction and processing of bulk mailings. Standing Appointment Advanced Notification Appointment Check-In MAIL.DAT WebServices

Global Systems Management 9 Mailer Volume  Drop Shipment appointments from the Facility Access & Shipment Tracking (FAST) system are displayed on the Surface Visibility scanning device.  Surface Visibility device is used to scan ‘Start- the-Clock’ events for FAST.

Global Systems Management 10 Mailer Bar Codes Unique container, handling unit and piece bar codes will enable Surface Visibility to track business mailings.  Customer SV bar code specification is on RIBBS Website: ribbs.usps.gov  Send samples for verification process to:  Enhanced Distribution Label uniquely identifies trays, tubs, and sacks  Customer EDL Specification is on RIBBS Website: ribbs.usps.gov  Web ATLAS ready in Spring 2007  4-State bar code uniquely identifies letters, flats and bundles  Will be used to provide piece level visibility to mailers Containers: Handling Units: Pieces and Bundles:

Global Systems Management 11 Mailer Visibility Placard Arrival Scan Placard Departure Scan Surface Visibility will track pallets through induction, cross dock operations and inter-plant transportation. Start-the-Clock CROSS DOCK WORKING Placard Arrival Scan ENTRY FACILITY DESTINATING FACILITY Processing Operations

Global Systems Management Falls Church Main Post Office Future – Mailer Visibility Surface Visibility is being enhanced to track the nesting of bundles and parcels into containers during processing. Bundle to Container Nest 10/31/05 TO: AFSM 100 #3 From: APPS #2 Signed: _____ In-house Processing Parcel to Container Nest

Global Systems Management 13 Future – Mailer Visibility Surface Visibility will scan the 4-State barcode on pieces to nest them to a flat tub via the Enhanced Distribution Label (EDL).

Global Systems Management 14 Surface Visibility Deployment Status The deployment of Surface Visibility Phase 1 is complete.  Surface Visibility Sites Activated  133 P&DCs  17 STCs  21 BMCs  Phase 1a in pilot in NY Metro Area  Phase II pending funding approval in Summer 07