Public Land Survey System (PLSS). The Public Land Survey System (PLSS) was developed by the Continental Congress to replace the common practice of describing.

Slides:



Advertisements
Similar presentations
Surveys of the Public Lands
Advertisements

Legal Descriptions and Site Plan Requirements
 An appraiser has to have a basic, working knowledge of the legal descriptions, especially for the area where they work  If an appraisal requires.
Legal Land Descriptions
Engr 234 – Civil Drafting Legal Descriptions
Wrapping Up Agriculture. Aim: How do land survey systems help us organize space? Do Now: Imagine you are riding in an airplane (window seat) travelling.
Florida Real Estate Principles, Practices & Law 38th Edition
Plot Plans & Legal Descriptions. Site or Plot Plans  A plot or site is an area of land generally one lot or construction site in size  The term plot.
© 2009 by South-Western, Cengage Learning SAMIRLANDER Chapter 10.
LEGAL DESCRIPTIONS OF LAND
GLO Surveying 02/04/2015. U.S. Rectangular System Structure Meridians & Baselines: 35 principal meridians and 32 baselines Meridian – line runs straight.
Understanding Land Measurement and Legal Descriptions.
Forging new generations of engineers. Legal Description.
EDT 51-Floor Plan Design1 CHAPTER 12 Legal Descriptions and Site Plan Requirements Sacramento City College EDT 51 Kenneth Fitzpatrick, P.E.
Principles of Real Estate
Legal Descriptions Civil Engineering and Architecture
Land Measurement Metes and Bounds and Public Land Survey.
Section, Township, Range By: Cytetn Industries, Inc.By: Cytetn Industries, Inc.
Property Legal Descriptions. u Method of establishing legal description and location of properties u 3 basic systems –metes & bounds –rectangular system.
CASE Legal Land Descriptions. FRIDAY, 9/21/12 Objectives: All property is legally defined and recorded based on a standardized regulatory system.
Legal Descriptions. Legal descriptions A working knowledge and understanding of legal descriptions is a essential for an appraisal If an appraisal requires.
The Agricultural Landscape
ESRM 304: Environmental and Resource Assessment © Phil Hurvitz, 2009 KEEP THIS TEXT BOX this slide includes some ESRI fonts. when you save this presentation,
Learning About Latitude and Longitude
Chapter 14 Legal Descriptions and Site Plan Requirements.
Section 1: Finding Locations on EarthFinding Locations on Earth
Public Land Survey System (PLSS)
Services. Warm up Write down 5 places you have gone in the last week that would be considered part of the service/tertiary sector?
Lines of Latitude and Longitude
Compass Use & Land Measuring
Lesson Understanding Land Measurement and Legal Descriptions.
Chapter 12 Legal Descriptions and Site Plan Requirements.
Legal land descriptions are an important part of transfer of property, Taxes, and determination of acreages. Most states still only recognize plane surveys,
Legal Descriptions LEARNING OBJECTIVES: Explain the importance of an accurate legal description. Discuss the three methods of describing real estate. Apply.
Latitude and Longitude: Finding Locations on Planet Earth. With thanks and credit to Step.com.
MnGeo Parcels and Land Records Committee Statewide PLSS Data Set Bart Richardson IT Portfolio Manager,
COURSE 900 Day 2 - Property Descriptions Welcome to the International Right of Way Association’s R3.PPT
Latitude and Longitude Angular measurements used to locate positions on the earth’s surface Reference line- Line which serves as a starting point for.
Latitude and Longitude. Latitude- the distance in degrees north or south of the equator The latitude of the equator is 0° (degrees)  What is latitude?
UNIT #2 The 20 th Century Notes Public Land Survey System.
Understanding Land Measurement and Legal Descriptions.
Models of the Earth Section 1 Preview Key Ideas Latitude Longitude Comparing Latitude and Longitude Great Circles Finding Direction Section 1: Finding.
Ch. 2 Real Estate Law – Legal Descriptions
Latitude and Longitude
Real Estate Principles and Practices Chapter 3 Land Descriptions © 2010 by South-Western, Cengage Learning.
Oh Where Oh Where Has My Little Dog Gone LATITUDE AND LONGITUDE.
Introduction to Agriculture, Food, and Natural Resources 1.
Unit: 5 Mapping Earth Why Mapping?. Mapping Earth Whether you think about it or not. Your life (especially this day in age) is effected directly by having.
Map Reading Natural Resource Management. 2 Key Terms #6 acre base line metes (Noun definition 2) meridian survey (an area of land) section township.
Chapter 3 Objectives Distinguish between latitude and longitude.
Legal Descriptions Civil Engineering and Architecture
Florida Real Estate Principles, Practices & Law 39th Edition
Agriculture reflects culture and makes an imprint on the landscape
Legal Description Methods of Legally Describing Land
Legal land description
Agriculture reflects culture and makes an imprint on the landscape
Unit 2 Map Skills VISUAL VOCABULARY
Legal Descriptions "The small landholders are the most precious part of a state." -Thomas Jefferson Civil Engineering and Architecture © 2010 Project Lead.
Understanding Land Measurement and Legal Descriptions
Unit 1 Map Skills Visual Vocabulary.
Understanding Location
Understanding Location
Legal Descriptions Civil Engineering and Architecture
Agriculture and the Cultural Landscape
Agriculture and the Cultural Landscape
Legal Descriptions "The small landholders are the most precious part of a state." -Thomas Jefferson Civil Engineering and Architecture © 2010 Project Lead.
Metes and Bounds and Public Land Survey
Chapter 1: Geography of the United States
Agriculture and the Cultural Landscape
Understanding Land Measurement and Legal Descriptions
Presentation transcript:

Public Land Survey System (PLSS)

The Public Land Survey System (PLSS) was developed by the Continental Congress to replace the common practice of describing land by metes and bounds. The PLSS is also called the Rectangular System of Land Description.

The metes and bounds system was developed in Europe over a period of many years. It uses natural land marks and low precision measuring to define boundaries. A typical metes and bounds description could read: “From the point on the north bank of Muddy Creek one mile above the junction of Muddy and Indian Creeks, north for 400 yards, then northwest to the large standing rock, west to the large oak tree, south to Muddy Creek, then down the center of the creek to the starting point.”

Problems with the metes and bounds system * Irregular shapes for properties make for much more complex descriptions. * Over time, these descriptions become problematic as trees die or streams move by erosion. * It wasn’t useful for the large, newly surveyed tracts of land being opened in the west, which were being sold sight unseen to investors.

Do we still use the metes and bounds system? Yes It is used for irregular shaped parcels of land. Instead of visual description of landmarks, angles and distances are used.

Public Land Surveying System (PLSS) The beginning of the current day PLSS occurred with the passage of the Land Ordnance Act of 1785.

Land Ordnance Act of 1785 Purpose: To facilitate disposal (either via sale or simple giveaways) of lands west of the Appalachian Mountains that the U.S. government had acquired from the British after the end of the Revolutionary War.

1. U.S. soldiers had been promised land in return for their service during the Revolutionary War, 2. The government needed the money from the land sales (there was no tax system in place at that time), 3. Settlers were needed in the western lands to defend the nation's frontier from ongoing Indian attacks. Disposing of this land was a very high priority for the young U.S. Government, for several reasons:

The first use of the PLSS was Ohio. This system was changed before the PLSS was applied to the great plains and other areas.

PLSS Use

PLSS Terminology

Initial Point The first step in the PLSS, rectangular system, was the establishment of the initial point within the territory. Star sights where the most common method used.

Initial points and Base lines In U.S.

The initial points for Oklahoma were established using star sights to establish the desired latitude and longitude. Indian Meridian: Latitude , Longitude Cimarron meridian: Latitude , Longitude

Base line The next step was to establish a baseline. The baseline passes through the initial point. It could not be a straight line because all points along the line are an equal distance from the north pole. In some surveys the base line was adjusted for curvature every 9 miles. The base line was established to the east and to the west from the initial point, border to border across the territory being surveyed.

Prime Meridian Meridians are geographic lines that pass through both poles and divide the earth into sections. Many initial points were picked so they were on a principle meridian. These are also call the prime meridian.

Standard Parallels Standard parallels are East- West lines that are parallel to the base line. They are numbered north and south of the base line. Standard parallels are 24 miles apart.

Guide Meridians Guide meridians are established at 24 mile intervals along the base line and standard parallels. Guide meridians are not parallel to the principle meridian because they are 90 o to the base line, or standard parallel and the base line is curved. Guide meridians are not continuous. There is an offset at each standard parallel (24 miles).

Guide Meridians--cont. Guide meridians can not be perpendicular to the base line and parallel to each other because the base line is curved.

Township A pair of standard parallels and a pair of guide meridians forms a quadrangle. Each quadrangle is divided into 16 townships. Townships are identified by tier and row.

Section Each township is divided into 36 sections. The sections are numbered in a serpentine route starting at the upper right corner of the township.

Fractions of Section Fractions of 1/2 and 1/4 are used to describe parts of a section. Irregular lots caused by drainage ways, or other reasons, are numbered.

Determine the descriptions for each of the labeled areas. A: SE1/4, S23, T4S, R6W, IM B:

SE1/4, SW1/4, NW1/4, S23, T4S, R6W, IM C: SE1/4, NW01/4, NW1/4 & SW1/4, NW1/4 NE1/4, S23, T46, R6 W, IM D: S8, T46, R6 W, IM Sometimes it helps to draw the lines on the section.

DETERMINE THE DESCRIPTION FOR EACH AREA. A: N1/2, NW1/4, S21, T7S, R6E, IM B: SW1/4, NE1/4, S21, T7S, R6E, IM C: SE1/4, SW1/4 & SW14, SE1/4, S21, T7S, R6E, IM D: SW1/4, NW1/4, SW1/4, S21, T7S, R6E, IM

ADDITIONAL INFORMATION