Trim Fwd Spar End Brackets July 6, 2009 7H2-2, Horizontal Stab Rear Spar 7H1-2, Stab Full Rib Corner of Forward.

Slides:



Advertisements
Similar presentations
How To Make Curtains & Drapes
Advertisements

The following photo essay shows a 2011 Hyundai Equus Sedan being transformed from a running passenger car into a specialized platform used for photographing.
TWO (2) Installation principles 1. Cabinets need to be installed straight, plumb, and level. 2. The area you are working in is rarely straight, plumb,
Magellan – Venus1:48 scale Score all fold lines and cut out the parts. The actual Magellan spacecraft was virtually all white – some model parts are blacked.
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
MAINTENANCE OF THE SERVICE RIFLE OVERVIEW Cleaning gear Maintenance Function check User serviceability inspection.
RIGHT HAND CARTRIDGE UNIT AS CAN BE SEEN FROM THE PHOTOGRAPH,THE UNIT IS OFFERED UP TO THE END OF THE BED AND MARKED THROUGH AT LEAST THREE POINTS FOR.
Tool Identification and Use. Where do you buy tools? Dealers Snap-On Mac Retail Stores Canadian Tire Wal-Mart.
Full Ribs to Rear Spar Parts Layout July 6, H2-2, Horizontal Stab Rear Spar with upper and lower doublers.
This is the 8’ metal bending brake we used. Since I forgot to take pictures, the pictures I use in this presentation to describe what I’m doing are from.
Spiral Stairs Assembly Instruction By Laser Dollhouse Designs
The Little Nikki Assembly Instruction By Laser Dollhouse Designs.
E8, , Wing Damage.
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
Dinky Toys by Nobleco Pullmore Transporter Restoration Toy number 982.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
IPAD BEAN BAG STAND. INSTRUCTIONS TO SEW YOUR VERY OWN HANDY IPAD BEAN BAG STAND. This simple iPad Bean Bag Stand is sewn using your favourite medium.
Aberdeen Grammar School
Chapter 4: Sheet Metal Forming Shafizan Bt. Shariffuddin School of Manufacturing Engineering UniMAP 2. WORKING TOOLS AND MACHINERY.
RS6 Hood Vent Templates and fab Instructions. You will need- Painters tape. 1” and 2”+ Aircraft paint stripper Tape measure mm T square Good pencil Drill.
Mark a line at the center of the canvas for its entire length. Place frame on a table or saw horses, bottom up.
University of Puerto Rico at Mayagüez Department of Mechanical Engineering Introduction to NX 6.0 Tutorial 3 Modified by (2011): Dr. Vijay K. Goyal and.
Rut ‘n’ Strut Game Calls How I turn a Pot Call. Select wood that you want to use to turn Pot Calls out of, Rip it 4” wide and then Crosscut into 4” X.
1. b. Rip Saw 2. d. Used for cutting with the grain.
What makes the Manufactured Goods What makes the Manufactured Goods.
VARCO PRUDEN’S Self Curbing Day Lighting Solution PrisMAX SL for SSR & HWR Roof’s.
Agriscience Toolbox Plan of Procedure 1. Table Saw (equipment) Rip the bottom of the toolbox to a width of 10 inches.
Tools that 6 th Graders Use Introduction to AgriScience 6 th grade Instructor – Mrs. Shomo.
Left side Right side Note pad Roll block. The Plan.
This is a fold-down clothes bar that will hold up to 12 plastic clothes hangers or even more wire hangers. As I don’t have a trailer wall to put it on,
One Point Perspective Design and Technology. One Point Perspective Task 3 Here are some high quality examples of what we are aiming to produce by the.
First Project: A Sign Principles of Manufacturing 1 Copyright © Texas Education Agency, All rights reserved.
How To De-Wing A Weedhopper By: Mike Schweim. Remove wing ribs, starting from the wingtips;
The 2 reinforcement plates are made from a piece of 2” dia stainless tube. Read on for how this is done. 14.
Shear Problem Defined There are no bolts on the inboard side of the coil structure to account for shear forces. Bottom Line: friction alone will not prevent.
Step one: Page Border and title block. Border will be ¼” from the edge of the paper. Drawing will be done in landscape format. Title block will be 1”
1 Remove seat from vehicle and remove seat trim cover.
What type of Flake are you? Visit snowflakes.barkleyus.com to make a flake online!
Fly Baby Monoplane Center Wing Ribs & Fin and Stab Ribs Printing Notes: Squares are on 1” centers Check with ruler prior to use Print to “ARCHITECTURE.
Installing a VOR Antenna on Zenith’s “Flying Rudder” by Bill Bartlett Cutout hole using the antenna gasket as a template. Dill two holes to accommodate.
TAKE NOTE ON THE ORDER OF PROCEDURE FOR CONSTRUCTION OF THE LAMINATE COUNTERTOP. Countertop Procedures.
Design and technology st aidan’s high A pictorial sketch of a wall lamp is shown. The shade is in the form of a cut cone. Draw, from the given.
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
Easy Reach 7.0 Honda Element Packing List QtyDescriptionPacked 115ft 10ga Red Wire 16ft 10ga Black Wire 140amp Breaker 23/8 Yellow Ring Terminals 25/16.
Replacing the Main Monitor 1.Open Lower Main Door, and turn off machine power 2.Open the upper main door 3.Disconnect the video and power plugs from the.
Use original rear consol support/seat belt mountUse supplied console support bracket (front.) Unit Can possibly pop pocket off lower door. IF NOT,
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Courtesy Eric Witherspoon, Sonex plans #815 Photo 1: What it is. Photo 2: How it works. Sonex Wing Stand Answer to photos 3 and 4: Want leading.
Hexagonal Prisms Developments.  A development is a flat template of a 3D shape that when folded up in the correct way makes the actual shape of the 3D.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Assembly of steering.
AEROFIX STRUCTURAL SERVICES
Basic Aircraft Structure
Drawing Alcoves using One Point Perspective
The Reading Tug – Schuylkill By: Barry Hensel
Easy Reach 7.0 Honda Element 2003
Easy Reach 7.0 Honda Element 2003
2.2 Gallon TourTank Installation
Genuine N1. Conversion Installation manual LC
Flag Installation on Roll-up Signs
Flag Installation on Roll-up Signs
SHEET F20-06 t-deck T11-01 vert-tail W22-01L wingtip F20-03R
Activity 4.2.8d Satellite Flight Path Construction Guide
Break down Lance rack Cut one of each of these for each rack
Use this one when drilling from front
767 Spar Assy.
The elevation and plan of an angled bearing block are shown.
Presentation transcript:

Trim Fwd Spar End Brackets July 6, H2-2, Horizontal Stab Rear Spar 7H1-2, Stab Full Rib Corner of Forward Spar End Bracket, marked for trimming. Note that the view here is with forward side to edge of table, bottom is to top, looking inboard.

Trim Fwd Spar End Brackets July 6, Forward Spar End Bracket (removed), with mark for trimming (see inset) Rough cut was made with snips, and steel file used to clean up and round off edges.

Trim Fwd Spar End Brackets July 6, Edge of bracket now conforms to bottom- edge curve of full rib where it meets the bracket. Forward spar end bracket reassembled to forward spar This same procedure was performed on the other forward spar end bracket, at the other end of the spar. 7H1-2, Stab Full Rib 7H2-2, Horizontal Stab Rear Spar

Summary of Work to This Point July 6, 2009 Rudder: - Assembled, in storage - Forward spar drilled for ribs and rivets - Lower doubler drilled for rivets - Upper doubler drilled for rivets - Front horizontal stab attach brackets made - Locate and drill two rear ribs for attachment to spar - Locate and drill nose rib for attachment to spar - Make end rib attach brackets - Locate and drill end rib attach brackets - Locate and drill horizontal stab front mounts - Finish drilling holes in end brackets for forward stab - Locate and drill upper and lower doublers to rear spar - Locate and drill rear ribs to rear spar Tail:- Trim forward spar end brackets to match curve of full rib at meeting point Tail: - Confirm that forward tips of full ribs and nose rib are co-planar - Locate and drill forward spar end brackets for attachment to full spar Done Done Here Next Up