ICRA Panel System Installation Instructions

Slides:



Advertisements
Similar presentations
Framing.
Advertisements

Sectional Assembly and Installation
The following photo essay shows a 2011 Hyundai Equus Sedan being transformed from a running passenger car into a specialized platform used for photographing.
Interior Wall and Ceiling Finish
GATHER THE FOLLOWING SUPPLIES:
Cabinet and Countertop Installation
Equipment for Assembly Fluke Multimeter 115 True RMS Glue Ring Jig Flathead screwdriver 60 Watt desk lamp HIOS Cl 4000 Electric screw driver Anti-static.
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
TWO (2) Installation principles 1. Cabinets need to be installed straight, plumb, and level. 2. The area you are working in is rarely straight, plumb,
Installing a double Dreamscreen. Check measurement Left.
CONSTRUCTION OF A “LITTLE FREE LIBRARY” Gary Mehlum, pressed into service by wife and UHLS employee Mary Fellows (“When you marry a librarian, you marry.
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
Typical Walk-in Closet with elfa® décor
Stable Rise –Pull and Swivel Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Spiral Stairs Assembly Instruction By Laser Dollhouse Designs
The Little Nikki Assembly Instruction By Laser Dollhouse Designs.
Hydraulic Digger Step-by-step assembly instructions (c) 2013 Mechanical Kits Ltd.1.
Lone Star Region National Model Railroad Association “The Shack” Scratch Build -Mike Jobe.
Pneumatic Arm Assembly Instructions
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
Colorado Space Grant Consortium Foam Core Class #05 Foam Core Class #05.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Tiffany Victorian assembly instructions By Laser Dollhouse Designs.
CONSTRUCTING A FIVE CABIN LATRINE
Assembling a Computer Safety Precautions CPU Installation
Showing Demonstrations on the TV How to connect the camera to our TV set.
Lone Star Region National Model Railroad Association “The Shack” Scratch Build -Mike Jobe SESSION 2.
Construction Framing Mr. Brock. Lumber 2x4s are not actually 2” by 4”
Basic Screen Printing Procedures for T-Shirts GOP_5-2 Screen Printing.
Walls of Structure Decreasing the Amount of Heat Exchange.
Residential Construction Window Installation Guide *Source: (1) Carpentry & Building Construction Feirer & Feirer (2) Sill to Sash; A Professionals Guide.
PAVSYS PAVSYS ™ PAVSYS PAVSYS MODULAR ENGINEERED SUSTAINABLE HABITATS.
Residential Construction Unit 4- Window and Doors Mr. Todzia.
Wood Construction CTC-375.
Shop Built Magnetic LED Light Bob Clark Aug, 11, 2011.
Arbor Project Copyright © Texas Education Agency, All rights reserved.
Installing a single Dreamscreen Set unit in place and attach with 2 ½ “ screw. Do not tighten the screw yet, tighten just enough to keep from falling.
Bridge Project. Materials – 8 pieces of wood, glue, cutters, masking tape and a ruler.
Build a Simple Electric Motor Uses a stator made of windings, an armature with two coils, and a commutator.
The Little Ann Assembly Instruction By Laser Dollhouse Designs.
Everything about drywall (lather)
Windows & Doors Chapter 8. Windows Provide natural light, air circulation, and a view for the home and members living in the home Also serve as a point.
 AKA Carpenters Square  Used for measuring right angles  Most common use is for stairs and rafters.
Garden Box Design Plans. Garden Box Materials List QTY (Lumber)* 2”x4”x120”(10’) - Cut one of these boards into two 41” pieces and two 17” pieces.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Completed Front and Rear Standard 10 ½” 1 ½” 3 ¼” 4 ½” 1” ¾” 1 ½” 6” ¾” Channel Length: 5 ¼”, ¾” from end.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
VIEW SERIES with Sliding Door
Installation Walkthrough Image Guide
STEP 1: ASSEMBLE ANGLE PLATES
Deconstructing a Hubsan and Rebuilding
Construction Framing Mr. Brock.
VIEW SERIES Track Assembly & Installation
STEP 1: ASSEMBLE ANGLE PLATES
DESIGNING & HANGING A PROFESSIONAL ART EXHIBITION
Step-by-step assembly instructions
Step-by-step assembly instructions
DESIGNING & HANGING A PROFESSIONAL ART EXHIBITION
Simple Way to Install Auto Lock Door in Car
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Hydraulic Arm Assembly Instructions
The Abriana Assembly Instruction By Laser Dollhouse Designs
Step-by-step assembly instructions
The Garage Assembly Instruction By Laser Dollhouse Designs
Wall and Ceiling Construction
Removal of salon doors on 1968 Roamer Sedan.
Step-by-step assembly instructions
Step-by-step assembly instructions
Presentation transcript:

ICRA Panel System Installation Instructions

Determine Starting Point 1. Layout corners, angles, obstacles so that the panel sizes will fit together nicely and not create a gap at any point of the installation. NOTE: If the first panel comes off the wall, place the track at 24” from the wall.

Install 3” Blue Tape to protect the Facility 2 & 3. Establish the starting point on one of the walls. Run 3” Blue Tape from ceiling to floor as the center point of the ICRA wall.

Double sided foam tape to ceiling grid or Hard Lid. 4. Install the Ceiling Frame Double sided foam tape to ceiling grid or Hard Lid. Clip track to center beam of ceiling grid.

5. Determine the location of the Floor Angle Metal Strip. Drop the “String Line” from the Ceiling Track as a level to establish the placement of the Floor Angle Metal Strip.

Starting next to the wall, insert the first ICRA Panel by sliding it into the Ceiling Track & placing it against the Floor Angle then sliding it over to meet the wall. 7.

Installation Tips: Place a 12” strip of White tape on the metal strip on the back of the panel slider. Once the panel is set to the desired height, press the tape onto the coroplast. It will stick and hold the panel slider in place. Manometer: Hold back tape, then release when meter is level.

Insert 2nd slider on the bottom of the panel. Assembly of Additional Slider to reach 13’ wall height Insert 2nd slider on the bottom of the panel. Remember that the top slider will be the final fit: Measure and identify desired placement of the bottom slider.

Assembly of Additional Slider to reach 13’ wall height Place ONE screw on back side on each side of slide to maintain desired position.

Re-assemble the top slide if it was removed earlier. Assembly of Additional Slider to reach 13’ wall height Re-assemble the top slide if it was removed earlier. The Preferred method of securing the top slide is with tape on the back supporting rail. (Ref. Slide #7)

Sealing the Seams 12. Once a large section of the wall is installed, run 3” White tape along the top and bottom of the panel wall sealing it to the Blue tape on the ceiling and floor to make a complete air tight seal.

Door Installation ** For best results: Mount the door in between 2 ICRA Panels for stability and strength. NOTE: The Door and Frame are held square by 3 screws and 1/8” spacers placed through the wood frame into the door. KEEP THESE SCREWS INTACT during the installation to insure square-ness of the installation.

Measure the exterior dimension of the WOODEN Door Frame (37-1/4”) Door Installation NOTE: There is a 1” frame on the door panel . Add 1” from the last ICRA Panel installed before making the cut on the Floor Angle. 11. Measure the exterior dimension of the WOODEN Door Frame (37-1/4”)

Door Installation 16. Insert the door in the same fashion as an ICRA Panel. 20. Measure, cut and install the coroplast on the top of the door.

21. Remove the 3 screws and 1/8” spacers from the door and frame.

Door Installation 23. Double check for proper function and level. 24. Run 3” Tape over the threshold of the door covering all of the exposed metal.

25. Resume installing the next ICRA Panel.

26. Wipe the entire wall down with a Disinfectant Spray or wipe. Disinfecting the ICRA Wall 26. Wipe the entire wall down with a Disinfectant Spray or wipe.

PROPER Panel System Storage

IMPROPER Panel Storage