Incontri di INFNET January 19, 1999 Impatto del Run II di CDF Stefano Belforte - INFN Pisa1 Reqs from CDF Run II on INFN computing infrastructures Usual.

Slides:



Advertisements
Similar presentations
Status GridKa & ALICE T2 in Germany Kilian Schwarz GSI Darmstadt.
Advertisements

4/2/2002HEP Globus Testing Request - Jae Yu x Participating in Globus Test-bed Activity for DØGrid UTA HEP group is playing a leading role in establishing.
Upgrading your computer 3 rd May Why upgrade? Current computer will not run some new wanted software or support desired hardware Current computer.
INTERNET INFORMATION ACCESS How to avoid and eliminate common problems confronting usage of modern resources to access the Internet.
Cloud Computing PRESENTED BY- Rajat Dixit (rd2392)
10 May 2002Report & Plans on computers1 Status Report for CDF Italy computing fcdfsgi2 disks Budget report CAF: now, next year GRID etc. CDF – Italy meeting.
Save the World! What’s appropriate for global networking?
1 Data Storage MICE DAQ Workshop 10 th February 2006 Malcolm Ellis & Paul Kyberd.
SM3121 Software Technology Mark Green School of Creative Media.
Computer Networks IGCSE ICT Section 4.
Barracuda Networks Confidential1 Barracuda Backup Service Integrated Local & Offsite Data Backup.
IP Based Video Conferencing By Tom Petersen May
Large scale data flow in local and GRID environment V.Kolosov, I.Korolko, S.Makarychev ITEP Moscow.
Types of Operating System
Hall D Online Data Acquisition CEBAF provides us with a tremendous scientific opportunity for understanding one of the fundamental forces of nature. 75.
Adam Leidigh Brandon Pyle Bernardo Ruiz Daniel Nakamura Arianna Campos.
14th April 1999Hepix Oxford Particle Physics Site Report Pete Gronbech Systems Manager.
Doc.: IEEE /124r0 Submission January 2003 Byoung-Jo “J” KimSlide 1 RRM Requirements for Public WLAN Service Provider Byoung-Jo “J” Kim AT&T Labs-Research.
Command School On Task In Touch Online Software for Schools Developed by Schools.
Chapter 7: Using Windows Servers to Share Information.
The D0 Monte Carlo Challenge Gregory E. Graham University of Maryland (for the D0 Collaboration) February 8, 2000 CHEP 2000.
Computing services for the Traveling Physicist Alberto Pace CERN – Information Technology Division.
SLIR Computer Lab: Orientation and Training December 16, 1998.
Networks and Hackers Copyright © Texas Education Agency, All rights reserved. 1.
Online Systems Status Review of requirements System configuration Current acquisitions Next steps... Upgrade Meeting 4-Sep-1997 Stu Fuess.
Global NetWatch Copyright © 2003 Global NetWatch, Inc. Factors Affecting Web Performance Getting Maximum Performance Out Of Your Web Server.
Local Area Networks (LAN) are small networks, with a short distance for the cables to run, typically a room, a floor, or a building. - LANs are limited.
Alexandre A. P. Suaide VI DOSAR workshop, São Paulo, 2005 STAR grid activities and São Paulo experience.
Royal Latin School. Spec Coverage: a) Explain the advantages of networking stand-alone computers into a local area network e) Describe the differences.
+ discussion in Software WG: Monte Carlo production on the Grid + discussion in TDAQ WG: Dedicated server for online services + experts meeting (Thusday.
D0 SAM – status and needs Plagarized from: D0 Experiment SAM Project Fermilab Computing Division.
3rd June 2004 CDF Grid SAM:Metadata and Middleware Components Mòrag Burgon-Lyon University of Glasgow.
Jean-Yves Nief CC-IN2P3, Lyon HEPiX-HEPNT, Fermilab October 22nd – 25th, 2002.
1 Computer and Network Bottlenecks Author: Rodger Burgess 27th October 2008 © Copyright reserved.
Jan. 17, 2002DØRAM Proposal DØRACE Meeting, Jae Yu 1 Proposal for a DØ Remote Analysis Model (DØRAM) IntroductionIntroduction Remote Analysis Station ArchitectureRemote.
12 Maggio 1998Computing for CDF run II Sefano Belforte - INFN Pisa 1 Computing for CDF run II (2000 and beyond) (a work in progress !) SUMMARY Software.
Using Virtual Servers for the CERN Windows infrastructure Emmanuel Ormancey, Alberto Pace CERN, Information Technology Department.
CDF Offline Production Farms Stephen Wolbers for the CDF Production Farms Group May 30, 2001.
CITRIX INTERNET VIRTUALIZATION AND VIRTUAL MOBILE - Abhishek Singh Twitter uk.linkedin.com/pub/abhishek-singh/7/275/562/
Introduction to WebFX. Summary of Last Lectures n Introduction to computers n Computer hardware and software –computer microcomputer minicomputer mainframe.
3 Apr 2002Stefano Belforte – INFN Trieste Necessita’ CDF al Tier11 CDF needs at Tier 1 Many details in slides for (your) future reference Will move faster.
2-3 April 2001HEPSYSMAN Oxford Particle Physics Site Report Pete Gronbech Systems Manager.
Febryary 10, 1999Stefano Belforte - INFN Trieste1 CDF Run II Computing Workshop. A user’s perspective Stefano Belforte INFN - Trieste.
Sep 02 IPP Canada Remote Computing Plans Pekka K. Sinervo Department of Physics University of Toronto 4 Sep IPP Overview 2 Local Computing 3 Network.
Outline: Tasks and Goals The analysis (physics) Resources Needed (Tier1) A. Sidoti INFN Pisa.
HEPiX FNAL ‘02 25 th Oct 2002 Alan Silverman HEPiX Large Cluster SIG Report Alan Silverman 25 th October 2002 HEPiX 2002, FNAL.
9: Troubleshooting Your Network
2-Dec Offline Report Matthias Schröder Topics: Scientific Linux Fatmen Monte Carlo Production.
CDMS Computing Project Don Holmgren Other FNAL project members (all PPD): Project Manager: Dan Bauer Electronics: Mike Crisler Analysis: Erik Ramberg Engineering:
NTOF DAQ status D. Macina (EN-STI-EET) Acknowledgements: EN-STI-ECE section: A. Masi, A. Almeida Paiva, M. Donze, M. Fantuzzi, A. Giraud, F. Marazita,
May Donatella Lucchesi 1 CDF Status of Computing Donatella Lucchesi INFN and University of Padova.
Outline: Status: Report after one month of Plans for the future (Preparing Summer -Fall 2003) (CNAF): Update A. Sidoti, INFN Pisa and.
THE PARTS OF A COMPUTER WHAT ARE THE PARTS OF A COMPUTER THAT MAKE A COMPUTER A COMPUTER?
SVT workshop October 27, 1998Stefano Belforte - INFN Pisa1 SVT Vertical Slice Test Goals Schedule Hardware to be tested Software  pre-existing  developed.
Feb. 13, 2002DØRAM Proposal DØCPB Meeting, Jae Yu 1 Proposal for a DØ Remote Analysis Model (DØRAM) IntroductionIntroduction Partial Workshop ResultsPartial.
A UK Computing Facility John Gordon RAL October ‘99HEPiX Fall ‘99 Data Size Event Rate 10 9 events/year Storage Requirements (real & simulated data)
D0 Farms 1 D0 Run II Farms M. Diesburg, B.Alcorn, J.Bakken, R. Brock,T.Dawson, D.Fagan, J.Fromm, K.Genser, L.Giacchetti, D.Holmgren, T.Jones, T.Levshina,
Office 365 is cloud- based productivity, hosted by Microsoft. Business-class Gain large, 50GB mailboxes that can send messages up to 25MB in size,
Belle II Computing Fabrizio Bianchi INFN and University of Torino Meeting Belle2 Italia 17/12/2014.
Websms Offers Professional Messaging Solutions via Web, , Gateway or Directly Out of Excel (Online) on the Microsoft Office 365 Platform OFFICE 365.
CDF SAM Deployment Status Doug Benjamin Duke University (for the CDF Data Handling Group)
CDF ICRB Meeting January 24, 2002 Italy Analysis Plans Stefano Belforte - INFN Trieste1 Strategy and present hardware Combine scattered Italian institutions.
Overview of the Belle II computing
SmartHOTEL Planner Add-In for Outlook: Office 365 Integration Enhances Room Planning, Booking, and Guest Management for Small Hotels and B&Bs OFFICE 365.
LHC experiments Requirements and Concepts ALICE
The Status of Beijing site, and CMS local DBS
Kevin Burkett Harvard University June 12, 2001
It’s About Time – ScheduleMe Outlook Add-In for Office 365 Enables Users to Schedule Meetings Easily with People Outside of Your Organization Partner Logo.
File Manager for Microsoft Office 365, SharePoint, and OneDrive: Extensible Via Custom Connectors in Enterprise Deployments, Ideal for End Users OFFICE.
Presentation transcript:

Incontri di INFNET January 19, 1999 Impatto del Run II di CDF Stefano Belforte - INFN Pisa1 Reqs from CDF Run II on INFN computing infrastructures Usual things:  system management (-DEC +Sun&SGI ++Linux )  ROOT  printers, news, mail, web… standard stuff (AFS maybe)  gnu software  maybe KAI compiler for C++ New stuff:  network

Incontri di INFNET January 19, 1999 Impatto del Run II di CDF Stefano Belforte - INFN Pisa2 Network usage for Italian CDF group Usual caveat: strategy for analysis outside Fermilab not defined yet (workshop February 12 at Fnal). Will use my guess (as usual). Everything may still change (as usual). Data Copy Remote Analysis Remote Monitoring Remote Shift Collaboration at distance  as addition to “old” codec-based videoconf (that we keep!)

Incontri di INFNET January 19, 1999 Impatto del Run II di CDF Stefano Belforte - INFN Pisa3 CDF Data Size in Run II Data logging: 75 Hz for 2 years (2 inverse fb) Raw event size: 250 KB Add analysis data and data overlap: 520 KB Reduced Physics Analysis Data set (PAD) = 60 KB/event  hope to get  30KB with ROOT compression Overall data set for Run II: ~1 PB = 1000 TB Overall PAD size: ~200 TB FNAL data storage (all data are at FNAL, at least!)  30 TB disk (PADs + robot cache)  1PB Emass tape robot (~100GB/tape) 200 physicists doing analysis at FNAL, about 20 at Pisa, but simple scaling don’t work (can’t have 3 TB disk TB robot in Pisa, data can not be parted among physicists).

Incontri di INFNET January 19, 1999 Impatto del Run II di CDF Stefano Belforte - INFN Pisa4 Network needs for Analysis 3 SCENARIOs (extremes and middle way):  copy all PADs in Italy, need almost no net to US  leave all PADs & “ntuple” in US, use Xterm from Italy  copy some PADs here, keep most ntuples here (copy/create) Difficult to estimate requirements. Better the other way around. Given 4 Mbit/sec dedicated to CDF, what can we do ?  4Mb/sec = 200GByte/week = 2 tapes/week, can’t beat DHL !  1 tape a day = 100GByte/day = 10 Mbit/sec  PADs don’t travel on the net  4Mb/sec / 10 users = 1GByte/5hr/person for copying ntuples  one analysis = 1/10th data  PAD=20TB, Ntuple=20GB ? refreshing Ntuple takes 4 days min ! More data, more users..  Converging argument: 10GB ntuple/physicist = minimum !  Can’t make Ntuple offsite and copy locally on the net

Incontri di INFNET January 19, 1999 Impatto del Run II di CDF Stefano Belforte - INFN Pisa5 Network solutions for Analysis Working remotely (i.e. use FNAL CPU) is not so bad:  4Mb/sec / 64 users = 64kb/sec/person = run PAW at FNAL from Xterm in Italy, more then needed.  still need internet to copy docs, printouts etc.. Note: presently WWW to Fnal downloads at ~20 kbit/sec and is just fine. Will mostly run at FNAL and ship DHL large ntuples and small or often needed PADs (20TB = 200tapes, already handled in Run I that many Exabyte). Copy short ntuples (  100Mbit) on the net (keep transfers < 1hour) This requires little more then present bandwidth, e.g. ~2 Mbit/sec for CDF probably OK. BUT: need to run analysis jobs at FNAL, desperately needs better interactive response: now 300msec per key (ping from TS, BO, PI), unacceptable ! Interactive must be priviliged. Low throughput is OK, but response time must be shorter.

Incontri di INFNET January 19, 1999 Impatto del Run II di CDF Stefano Belforte - INFN Pisa6 Remote monitoring Offline ~ok: need guaranteed interactive work, probably OK even if heavy graphics is slow. Transfer large data sets via tapes. Online: a new front.  1. Silicon Vertex Tracker: crucial part of Level 2 trigger, a lot of online monitor, care, debugging: experts in Italy (only!)  2. Internal Silicon Layers: our largest contribution to new detector, want to keep ownership after installation, needs on-line assistance from Pisa as well.  3. SVXII, MUON, CALORIMETER TOF… many more crucial detectors with large/predominant competence in Italy  4. Remote Control Room: do shifts in Italy, save on travel  4 is about saving money, 1, 2 and 3 about getting proper credit and physics rewards from present large efforts: keep ownership of our detectors !  NEED: few X-terminals that work as extensions of FNAL LAN

Incontri di INFNET January 19, 1999 Impatto del Run II di CDF Stefano Belforte - INFN Pisa7 Remote cooperation Not only X-Term. Need to replace physical contact Want to be able to collaborate (sit here next to me and help me with your program) with a collegue at Fnal. Avoid moving the full group back and forth. Keep presence on-site tied to work at home.  one-to-one videoconference (not what we used so far)  PC-style  very little demand from video  whiteboard and/or window sharing a must also useful for remote shifts need support from local system managers, central guidelines on equipment/software etc. then… like before:  need X-terminal that works as extension of FNAL LAN

Incontri di INFNET January 19, 1999 Impatto del Run II di CDF Stefano Belforte - INFN Pisa8 Extending FNAL LAN Needed for online monitoring and debugging and remote control room Do not need full 1Mb/sec Ethernet, need more tests but probably 64 Kbit/sec is good enough (128Kb/sec is fine) Do not need it at all times (problem in FNAL, phone call to expert in PISA, get the line for a few hours) It has to be a guaranteed connection, something to rely on, if it fails a few times, the collaboration will request expert on site Can “you” do it ? Can I have a dedicated slice of the net kept aside for just my terminal ? Do we have to buy ISDN by the minute as for videoconference ? Need agreement on direction to move.

Incontri di INFNET January 19, 1999 Impatto del Run II di CDF Stefano Belforte - INFN Pisa9 Is PTT ISDN the way ? ISDN works  physicists in Batavia work at home happily with FNAL calling back on commercial ISDN, 64k upgraded to 128k automatically when usage > 48Kb/sec (seldom unless heavy web graphics). The lab also provides the networking equipment at home. ISDN exists  just on Italian Telecom Phone Book, can have it everywhere ISDN is end-to-end  gurantees bandwidth all the way from one room in Italy to CDF control room LAN, no matter what. ISDN is (relatively) cheap  64kb/sec = 55 Klit/hr (27 Euro)  5hr of remote work cost like 1 day in Fermilab + save the flight money and time (and jet-lag)

Incontri di INFNET January 19, 1999 Impatto del Run II di CDF Stefano Belforte - INFN Pisa10 ISDN implications Need work, money, and infrastructure Work: find best configuration  ISDN card on PC + call to US ? Easy  Router + Call-Back from US ? Cheaper. More workplaces...  Is one line/site enough ? 1 in Trieste, 3 in Pisa ? 10 in Italy ? Get more “air time” for the same cost. Time sharing... Money: 20 users * 1hr/day average = 1MLit/day ~ 400MLit/year  probably OK if taken as saving on travel  still a significant cost. What is the INFNET cost ?  needed connection time could easily be 2 or 3 times more  needed connection number could be less if can share one line. Infrastructure: dedicated room(s) and PC(s) (unix WS?). Maybe router. Equipment at Fermilab as well ? A few tens of Mlit plus some effort and a lot of manpower.

Incontri di INFNET January 19, 1999 Impatto del Run II di CDF Stefano Belforte - INFN Pisa11 The “normal” way Can we get ISDN-like quality at lower cost using QoS on INFNET ? When ? How ? Who ? Simpler (for the user !), even if same cost as PPT ISDN. Do we have to pay for it, like with Telecom ?  That’s allright: easier to avoid waste and to control usage Not just bandwidth for CDF, nor for INFN site, need end-to-end service: bandwidth for user ! Must be available ~immediately upon request to be usefull to keep expert in Italy for needs in CDF Control Room Our “schedule”  Already would help (also across Italy !!)  Very helpful after summer 1999 (SVT installation)  Definitely needed starting in 2000  usage and need will grow with time (and data)

Incontri di INFNET January 19, 1999 Impatto del Run II di CDF Stefano Belforte - INFN Pisa12 Conclusions CDF RunII means Unix, mostly on PC, then Sun and/or SGI, DEC may be dropped on the way. Mostly no special software needed but ROOT will use more m-bone-like one-to-one videoconferencing Network to FNAL must be improved  better interactive response  higher bandwidth for data transfer (few Mbit/sec)  good bandwidth on demand (QOS) for LAN-like connection: - remote monitoring - remote shifts - remote collaboration  10KBytes/sec ~ 64 kbit up to 128 kb/s  commercial ISDN on PPT an option  cutting it out of internet better, but soon (2000 is next year).  Start ISDN then go on private line as usage increases in 2001 and later ? RunII lasts till 2005 at least...