G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/2004 1 There will be two presentations: T. Nakada (Spokesman): Stato LHCb A.Smith (Resource Coordinator): M&O.

Slides:



Advertisements
Similar presentations
VELO Module PRR preparation meeting28-feb-2006 LiverpoolMassimiliano Ferro-Luzzi 1 Introduction VELO overview Overall planning A bit of (recent) history.
Advertisements

26 June 2001VELO-Overview VELO Overview T. Bowcock University of Liverpool.
ALICE © | RRB | 17 April 2013 | Catherine Decosse 24 th meeting of the ALICE Resources Review Board CERN-RRB
Fermilab E906 Schedule Paul E. Reimer 20 June 2008.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
WP1.2 – Photon Detectors Stephan Eisenhardt University of Edinburgh  Budget  Milestones  Progress Report  Partners: International Collaborating Groups.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
HPD Performance in the RICH Detectors of the LHCb Young Min Kim University of Edinburgh IoP HEPP Conference – April
Status of the MaPMT o Status quo o Ongoing work o Issues – mechanics – electronics – schedule o Conclusions LHCb meeting Milano Franz Muheim.
G. Martellotti1CSN1 14 / 10 / 2002 LHCb Category A M&O status for 2002 and estimate for 2003 Report on Common Fund and CORE expenses for RRB Ott.
Draft Budget for M&O 2007 A. Petrilli, RRB-23, October 24, 2006 CERN-RRB Cf. CERN-RRB
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Comment on the LHCb upgrade cooling plan Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
1 US Cost & Schedule Summary W. R. Edwards US Project Manager CD-2/3a Review January 8, 2008 BNL.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
MICE CMPB Alain Blondel 1 Highlights on MICE.
G. Carboni - Muon Meeting – Draft Agenda Muon Meeting 6 April 2004 Introduction (15 min) Total 15 min MWPC prodution Material supplies,
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
Most Common Fund spending now goes on infrastructure. In the course of next year, essentially all the remaining funds will be spent on finishing the sub-detectors.
News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.
MUON Project Overview Action Items from September meeting New Action Items Update to the List of Worries Update of plans for the next 6 months.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
A. Baldini PSI July 05 Overview of the experiment MEG is being built (Beam line, Magnet, LXe, DC, TC, Elect., Software) Delays in some items: O(months)
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Production and installation plan Construction sharing Production plan Installation sequence Material procurement P. Campana LNF – LHCb Muon EDR Cern April.
27 December 2006 LHCb Status Report (A.Vorobyov) 1 LHCb.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Time to resolve Design Issues 1. Disclamer Due to the engineering meeting last week I have not had time to coordinate this material with Tim or the L3.
Collaboration Board 27/09/ Next RRB in October - Core and Common Funds in Projected M&O Cat. A budgets for the coming years - Received funds.
DT-LHCb coordination meeting 18 April 2016
Jim Fast Pacific Northwest National Laboratory
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
Brief Status SPS Prototype PSB Prototype Installed in LS1
The LHCb Installation Story
LIU Wire Scanner Milestones June 2017
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
LHCC referees’ questions, comments, requests
on behalf of the LHCb collaboration Tatsuya Nakada CERN and EPFL*)
Status of ATLAS Resources
LHCf – CSN1 Trieste O. Adriani
Francesco Forti University and INFN, Pisa
Status of ATLAS Resources
CMS Goal of the experiment
The Pixel Hybrid Photon Detectors of the LHCb RICH
HL-LHC upgrade at IPHC news
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
East Hall under construction
Presentation transcript:

G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/ There will be two presentations: T. Nakada (Spokesman): Stato LHCb A.Smith (Resource Coordinator): M&O cat A, CORE e CF (consuntivi 2003 e preventivi ) Overview on the LHCb RRB del 28 Aprile 2004

G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/ News of the Collaboration CB has approved in february 2004 a new collaborator: LPNHE of Paris VI and VII (software and analysis activities) within the unchanged France budget

G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/ Summary on Detector Construction Magnet assembly progressing, should be finished in June ’04; VELO: sensor and hybrid orders delayed, but still manageble, electronics: BEETLE 1.3 getting on critical path (also for ST), vacuum vessel proceeding; ST: mechanic design progressing, IT sensor order in process; OT: module production coming up with delays, electronics and support design progressing okay; RICH: RICH2 mechanics on track, RICH1, electronics and HPDs progressing, but schedule getting tight; Calorimeters: on track, installation to start in October Muon system: chamber production coming up with significant delays, electronics very tight schedule, filter construction to start in May Infrastructure installation proceeding.

G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/ Magnet

G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/ VELO: Production of Mechanics Production drawings under approval: Vacuum Vessel Detector Vacuum System Protecting Cover VELO Stand Y-translation frame Center frame Rectangular bellows Secondary vacuum box: Tolerances and mech. properties within specs prototypes Massimiliano Ferro-Luzzi

G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/ OT: Module Production Antonio Pellegrino 5m Modules at NIKHEF 2.5m Module at Warsaw

G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/ RICH Photon Detectors 4 new HPDs produced by DEP 3 tested Photocathode efficiency exceed specified QE Threshold scan with test pulse Bias voltage scan High voltage scan Back pulse measurement estimation of the photoelectron detection efficiency = 87 % Dark count rate measurement So far – all looks very good

G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/ RICH Photon Detectors

G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/ RICH -2 Construction progressing: Magnetic shielding: Production readiness review passed in January 04, field measurement envisaged in Q4/04 (Milano) HPD electro-mechanic assembly to be finalized by October 04 (Genova) Preparations for assembly of RICH-2 at CERN started Mirror production proceeding with some difficulties (quality) Mirror supports delivered Superstructure in fabrication, delivery in April 04

G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/

G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/

G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/

G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/ RICH 2 – Construction progress

G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/ Update of Milestones MilestoneOld Date Achieved DateNew DateComment Engineering design reviewFeb 04June 04 Production drawings completedJuly 04.Sept 04 Orders for mirrors and structure placedSept 04 Nov 04 Begin assembly at CERNAug 05 Sept 05 Mirrors produced and testedOct 05 Sept 05 RICH 1 As in Light-TDR

G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/ Muon System: MWPC production After Production Readiness Reviews the production is now running at following sites:  CERN: planned rate 1 chamber /week, rate reached, but gain uniformity measurement missing  LNF: planned rate 2.5 chambers /week; rate shown to be reachable, not yet maintained  PNPI-1: planned rate 5 chambers /week, in training phase Three more production sites to come:  Ferrara: production just started planned rate is 2.5 chambers /week, PRR planned for April  Florence: clean room with tooling installation ready, PRR planned for May  PNPI-2: after finishing CMS production area to be converted, start-up planned for autumn this year. We will only know the actual production rate for 5 centres by summer 2004, the chamber construction and installation plan will be revised this summer, once the production rates are established.

G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/ Milestone Plot

G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/ Cost of the LHCb detector MoU cost 73.3 MCHF Present cost 71.7 Funded 71.3Comments: 1. BMBF funds approved in march HPD cost (for RICH) could be larger (tender under way)

G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/ Cost-Funding Matrix Non ci sono underfunding significativi

G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/ Main lines of Resource Coordinator presentation M&O categ. A (in kCHF) power spesi budget Contributo Italia = 18.4% 93.5 kCHF (in pagamento) (903) 1976 (728) 2447 (903) 870 (60) Planned Profile Carry-over from (Italy 86.4) Contributo Italia = kCHF No M&O cat B activated yet

G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/ Main lines of Resource Coordinator presentation CORE 6157 Italy= Italy=1200 Spesi 2003 Planned Italy=4100 Planned 2004 COMMON FUNDS All numbers in kCHF

G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/ Back-up Slides

G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/ Table 1 : Outcome of Category A M&O spending for 2003 Item listOutcome of 2003 Budget KCHF Detector related costs 505 Secretariat Communications 07 On-line computing 00 Test beams, calibration facilities Laboratory operations General services Total Power M&O categ. A consuntivo 2003

G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/ Table 2 : Funding Agency Balances CREDITI M&O categ. A 86,4 kCHF

G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/ Costi previsti 2004 Detector related costs0 Secretariat95 Communications9 On-line computing90 Test beams, calibration facilities40 Laboratory operations45 General services230 kCHF Total509 Power120 Italia (18.37%) 93,49 kCHF (fatto il necessario per pagare la fattura) M&O categ. A Non viene aggiunto nulla riguardo il 2004

G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/ Estimated Category A M&O Costs for LHCb Detector related costs Secretariat On-Call communications999 On-line Computing Test Beams Laboratory Operations4535 General Services Power ItemkCHF Total Detector related costs120 Secretariat180 On-Call communications5 On-line Computing180 Test Beams20 Laboratory Operations45 General Services320 Power60 ItemskCHF Total870 M&O categ. A Stime preliminari

G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/ M&O categ. A Sharing attuale (da aggiornare in estate)

G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/ CALO1847 DAH95 MAGNET892 INFRASTRUCTU RE7 Detector TOTAL2841 Common Fund Table 3 Expected Common Fund Spending in 2004 CALO1,318 DAH696 MAGNET600 INFRASTRUCTURE800 MUON100 Detector TOTAL3,514 Spese 2003 (kCHF) Spese previste CALO785 DAH920 OTR456 INFRASTRUCTURE1,500 MUON100 Detector TOTAL3,761

G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/ Spese 2003 CORE

G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/ CORE Spese previste 2004

G.Martellotti, C.Matteuzzi, CSN1 Roma 6/4/ Spese previste 2005 CORE