L’Infra, une activité au cœur de la SNCF INFRASTRUCTURE French Highspeed on South East TGV line: 25 years of evolution Jean-Paul BALENSI Vice-president.

Slides:



Advertisements
Similar presentations
Knowledge requirements for rolling stock maintenance TU Eindhoven – 19th of June 2007 by Bob Huisman NedTrain - Fleet Management.
Advertisements

Real Time Train SNCF. 1 Agenda Essentials Basic Model Applications Traffic density is getting very high in several networks and management.
IRSC DUBLIN OCTOBER 2006 vue n°1 INTERNATIONAL RAILWAY SAFETY CONFERENCE Dublin 23 – 25 october 2006 CIRCULATION OF TRAM-TRAINS ON THE FRENCH NATIONAL.
YEKATERINBURG, 4 SEPTEMBER STATUS QUO - COOPERATION BETWEEN CCTT AND MÁV Ilona Dávid President – Director General MÁV, Hungarian State Railways.
Meeting AECOM, AM SOP-T, CFR, JASPERS
UIC The Worldwide Association Representing the Railway Sector Nathalie Amirault Head of Unit Expertise Development, UIC RAILWAY OPERATION IN ECVET A LLP-DoI.
1 February 2009 Analysis of capacity on double-track railway lines Olov Lindfeldt February 2008.
1 NAT accessibilité  New rolling stock in Ile de France  Regional Structuring Bus Network RIR  Extended provision: night services  New services tramway.
QUICKER THAN ROAD, CHEAPER THAN AIR, A PROMISING COOPERATION BETWEEN RAILWAYS AND AIRLINES WORD FROM KLAUS EBELING – Secretary general of European Intermodal.
SPUTNIC – Strategies for Public Transport in Cities Strategies for Public Transport in Cities Funded by the EU Project introduction.
The regulatory framework of the Italian railways: an outline of the main aspects Angela Stefania Bergantino (University of Bari) First Conference on Railroad.
Rail Baltica RETURN TO EUROPE IN NEW QUALITY
The European Railway Agency in development
THE PLANET99 MODEL DEMAND AND REVENUE FORECASTING TOOL FOR RAIL OPERATORS 8th EUROPEAN EMME/2 USERS CONFERENCE Jeremy Douch GIBB Transport Planning May.
Institute for Transport Studies FACULTY OF EARTH AND ENVIRONMENT When is high speed rail economically justified? Chris Nash
What jobs in a low carbon European economy ? ETUC/CES Brussels, February 2007 Transport policies and measures in EU to mitigate climate change François.
Transport presentation October An integrated railway solutions provider Sales 4.9 B Euros Orders received 4.7 B Euros Employees Market Share.
Japan’s Efforts to Ensure Safety of Railways October 12th, 2010 Railway Bureau MLIT.
EurailSpeed milano 2005 Which market for high speed rail ? - The experience of Paris-Charles de Gaulle airport Jean Marie Chevallier Director of Airport.
Background Research on High Speed Rail Kumar and Wencan.
HS2 A National Strategy for High Speed Rail Prof Andrew McNaughton.
Overview System modelling and holistic simulation :
When rail means service > INFRABEL AT THE HEART OF EUROPE General Assembly EFRTC 28/11/2008 Luc Vansteenkiste Director General Rail Access.
1CER The Voice of European Railways High Speed Railway – a chance for Poland and Central Europe EU Regulatory Framework Warszawa, 16 November 2011 Libor.
Challenges and the benefits of interoperability for the railway industry and the rail transport Eric Fontanel UNIFE General Manager.
ERTMS state of the art and evolution of the applications considering customer’s orientations.
Enforcement policy on level crossings in France Philippe FELTZ, 16 March 2011.
Alstom Transport presentation Mokra Gora April 2013 Djurica Misin.
Rail Investments in the new Member States Overview of the situation and debriefing on UNIFE activities Michael Clausecker UNIFE Director-General Appendix.
Eurostar Train By: S. Ray. Eurostar is a high-speed railway service connecting London with Paris and Brussels. All its trains traverse the Channel Tunnel.
Prague Integrated Transport (PID).  Prague - area 496 km 2 population 1.2 mil. distance of the city boundary from the centre is 10 km to the north, 18.
1 “Old fashioned” problem solving in a modern railway RSA- 08/01/14 Jo Kaye.
THE NEW TRANS-EUROPEAN TRANSPORT NETWORK A CORE NETWORK: BLUEPRINT FOR 2030.
Business Development and Contracts Jens Plambeck Director Strategic Development Stockholm County Council Transport Administration April /10/2015.
HŽ Passenger Transport – overviewBUCHAREST HŽ PASSENGER TRANSPORT.
Working Party on Rail Transport – 63rd session Geneva, 18 November 2009 EUROPEAN COMMISSION.
Presentation to Working Group ERTMS on DB SNCF RFF 1 ERTMS PILOT PROJECT Paris - Frankfurt corridor & ICE3 and POS trainsets DB/RFF/SNCF common.
АНРИ ПУПАР-ЛАФАРЖ Закон Ома для транзитных коридоров: как повысить проводимость и снизить сопротивление – взгляд производителя комплексных транспортных.
9618/PLT/EUR/318-05Page 1 Edition 1 High Speed Regional Services High Speed Regional Services: a new market? by Jean-Pierre ORSI, director Europe SYSTRA.
20/06/051 Technology Challenges for 350 km/h EurailSpeed 7-9 November 2005 Session E1 Louis-Marie CLEON I&R Technical Director.
Liberalisation of the railway market A challenge to finance railway systems Benoit Chevalier Deputy Director for Rail Safety and Regulation French Ministry.
Right on Track towards a safe and interoperable Europe? 2 April 2014 Luc Lallemand Vice President EIM CEO Infrabel Belgium Rail Infrastructure Manager.
International Logistics Centres for Western NIS and the Caucasus Georgia: Areas in the vicinity of Tbilisi airport Ministry of Economy and Sustainable.
DEDICATED FREIGHT CORRIDOR – CONSTRUCTION & MAINTENANCE PRACTICES
Nothing About Us Without Us w w w. e d f - f e p h. o r g Demands of persons with disabilities for accessible railway services Maria Nyman Policy Officer.
EURAILSPEED MILANO 2005.
Summary and Wrap-up Discussion 8 July 2015
Chances for quick wins in the railway sector How to reach economic growth through full interoperable corridors? Karel VINCK, European ERTMS Coordinator.
Gridlock? – Transport in 2030 Solving Congestion in South East England 14 th November, 2007 Adrian Shooter Chairman, ATOC.
UIC ERTMS Conference - Budapest 4 th -6 th April 2006 STRATEGY AND EXPERIENCES OF THE ERTMS DEPLOYMENT IN SPAIN Antonio Domínguez Chala ADIF.
Demonstrating Digital Railway
ERTMS Strategy Group Agenda Item 3 – Key Strategic Issues 11 th April th April 2006.
INDIAN RAILWAYS  I. Rly. Vision for Next 10 Years  Opportunities for International Partners A Presentation by – Mr. Arbind Kumar Director (Projects)
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
INFRASTRUCTURE DEVELOPMENT CONSULTANTS Review of the East Africa Railways Master Plan Peter Kieran CPCS Transcom Limited March 11, 2010.
Olivier Pignal –ERTMS manager -SNCF Engineering
Title: Road vs. Rail… A shift towards rail Date: 16 Nov 2015.
Inquiry on High-Speed Railways High-Speed Railways – social infrastructure for stronger development and competitiveness SOU 2009:74.
High Speed Rail Some Development Principles
IRSC 2005 Cape Town - South Africa 9 – 14 october 2005
The SEESARI initiative – “From vision to action“
CIRCULATION OF TRAM-TRAINS
Vice President: Lin Zhonghong Economic & Planning Research Institute
A New Era in Critical Communications
COMBINED TRANSPORT A brief view on the UIRR scrl
Chances for quick wins in the railway sector
JSC “UKRAINIAN RAILWAY” (UZ) DEVELOPMENT STRATEGY FOR
EurailSpeed François Lacôte Technical Senior Vice President
ERTMS in France Successes and challenges CCRCC – 15th November 2017
East Coast Route Study November 2016 update.
Presentation transcript:

l’Infra, une activité au cœur de la SNCF INFRASTRUCTURE French Highspeed on South East TGV line: 25 years of evolution Jean-Paul BALENSI Vice-president of Operation System and Safety Division SNCF EURAILSPEED 2005 Milano, 7-9 November 2005

l’Infra, une activité au cœur de la SNCF 1 Introduction First French HSL was open in 1981/1983 on Paris – Lyon route. General lines scheme:

l’Infra, une activité au cœur de la SNCF 2 Building the first HSL: a bet for the National Railway Company SNCF A French strategic and economical choice in order to revitalize railway passenger traffic. Evolution of passenger traffic flows and modal market shares: TGV / AIR Market Shares between Paris and Lyon

l’Infra, une activité au cœur de la SNCF 3 Building the first HSL: a bet for the National Railway Company SNCF (2) A completely new technical environment and a major investment for SNCF: new dedicated infrastructure, new signalling system, new type of rolling stock. Investment costs:

l’Infra, une activité au cœur de la SNCF 4 How to ensure safety running at 300 km/h? Adapting infrastructure to highspeed: Enclosed line and no level crossing Wider distance between tracks Either-direction working tracks

l’Infra, une activité au cœur de la SNCF 5 How to ensure safety running at 300 km/h? (2) The cab-signal: a specific on-board system for highspeed. Scheme of TVM 300 et TVM 430 stopping sequences: TVM 430 system TVM 300 system

l’Infra, une activité au cœur de la SNCF 6 How to ensure safety at 300 km/h? (3) Co-operation between SNCF and ALSTOM to build the TGV, a rolling stock designed for HSL. Specificities of a TGV train-set:

l’Infra, une activité au cœur de la SNCF 7 How to ensure safety at 300 km/h? (4) A new dedicated maintenance organisation:  No commercial traffic during the night,  Massive organisation with dedicated maintenance technical means along the line,(extension of this organisation to conventional lines as more efficient and profitable),  Set up of a « sweeping train » with speed limit at 160 km/h every morning after maintenance works and before the first commercial train A centralized dispatching centre grouping train operation and power supply management Adapting safety rules to a new environment:  Implementing temporary operating safety rules to be progressively included in general rules  Specific measures to be taken in case of incidents on rolling stock  Specific procedures to be followed in case of infrastructure incidents

l’Infra, une activité au cœur de la SNCF 8 Results in terms of safety and regularity

l’Infra, une activité au cœur de la SNCF 9 For-coming evolution on Paris-Lyon HSL Paris-Lyon HSL is the first piece of the French current highspeed network Passenger demand is still increasing on this route The opening in 2001 of HSL continuation until Marseille brought more trains on the line section between Paris and Lyon New HSL projects connected with this route will also bring more trains The consequence is a lack of capacity on the Paris-Lyon route

l’Infra, une activité au cœur de la SNCF 10 Solutions to increase line capacity Increasing rolling stock capacity: TGV Duplex (double-deck) offers +40% seats Modifying train graphic in order to add paths and using ERTMS level 2 combined with current TVM system it is the solution retained for the future Eastern HSL Paris- Frankfurt)

l’Infra, une activité au cœur de la SNCF 11 Thank you for your attention!