MOBILE DISTRICT DREDGING PROGRAM MOBILE DISTRICT DREDGING PROGRAM NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING MEETING/WEDA US Army.

Slides:



Advertisements
Similar presentations
MOBILE DISTRICT FY 2007 DREDGING PROGRAM MOBILE DISTRICT FY 2007 DREDGING PROGRAM US Army Corps of Engineers Mobile District US Army Corps of Engineers.
Advertisements

CORPS OF ENGINEERS DREDGING INFORMATION n Corps of Engineers Dredging Information System (DIS) n Tracks Corps Performed and Contracted Dredging n Pre-bid.
BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District SARASOTA COUNTY – LIDO KEY HURRICANE & STORM DAMAGE REDUCTION PROJECT City of Sarasota.
INFRA DREDGE SERVICES PVT. LTD. 1-35, 3 rd Floor, Shroff Bhavan, Next to Yellow Gate Police Station, Carnac Bunder. PD Mello Road. Masjid Bunder (East),
4/19/20151 Dredging By Rick Wilmot C/E Port Engineer Clamshell Division Weeks Marine.
US Army Corps of Engineers Philadelphia District Scheduled FY 07 Dredging Work FY 07 Dredging Workin Philadelphia District Philadelphia District.
OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.
US Army Corps of Engineers Portland District West Coast Regional Hopper Contract.
US Army Corps of Engineers BUILDING STRONG ® PNWA Conference Update COLONEL Jose Aguilar District Commander Portland District 2 October, 2014.
US Army Corps of Engineers Portland District Fiscal Year 2007 NWP Dredging Plan Including: The Columbia River Channel Improvement Project (CRCI)
1 Ocean View Shoreline Project Update Overview for Norfolk City Council January 7, 2014.
Post-Hurricane Ivan Emergency Habitat Restoration Larry E. Parson – U.S. Army Corps of Engineers, Mobile District Linda S. Lillycrop - U.S. Army Corps.
U. S. Army Corps Of Engineers Memphis District November 16, 2007.
50,000 sq. miles, LA to Mexico, 100 miles inland 400 miles of coastline $200 Million Program.
TAMPA HARBOR CONSTRUCTION PROJECTS, Big Bend Channel Alafia River Channel Port Sutton Channel TAMPA HARBOR CONSTRUCTION PROJECTS, Big Bend Channel Alafia.
US Army Corps of Engineers BUILDING STRONG ® JACKSONVILLE DISTRICT COASTAL DAMAGE REDUCTION FLOOD DAMAGE REDUCTION NAVIGATION ECOSYSTEM RESTORATIONREGULATORYINTERAGENCY.
Shell Island West NRDA Restoration
South Atlantic Regional Biological Assessment Update on Status of Re-initation of Consultation under Section 7 of the Endangered Species Act Terri Jordan.
Civil Works Baltimore District River and Harbor Projects.
JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING.
JACKSONVILLE DISTRICT 5 Year NEW WORK DREDGING PROGRAM JACKSONVILLE DISTRICT 5 Year NEW WORK DREDGING PROGRAM NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD.
Bayou Dupont Sediment Delivery – Marsh Creation #3 (BA-164)
PHILADELPHIA DISTRICT 2008 – 2012 DREDGING PROGRAM.
U.S. Army Corps of Engineers Savannah Harbor Expansion Project Savannah Harbor Expansion Project.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
Coastal & Port Engineering Considerations of the Jacksonville Harbor Deepening Study Kevin Bodge, Ph.D., P.E. Port & Coastal Engineer Senior Vice President.
NAD/SAD REGIONAL DREDGING MEETING/WEDA WILMINGTON DISTRICT
By: Rachel Fowler. The waters along Florida beaches are generally warm compared to the rest of the U.S.A. Florida beach sand texture in the northwest.
CHARLESTONMOBILE WILMINGTON SAVANNAH JACKSONVILLE US Army Corps of Engineers BUILDING STRONG ® NC Water Resources Congress Christine Brayman Deputy For.
Governor’s Advisory Commission on Coastal Protection, Restoration and Conservation August 20, 2009.
Savannah Harbor Expansion Project
San Francisco District San Francisco District Coastal Activities Frank Wu CERB Meeting June 4, 2009.
US Army Corps of Engineers BUILDING STRONG ® Charleston District Charleston Harbor Post 45 Deepening Feasibility Study Barbara Melvin Senior Vice President.
October FY08-FY12 Dredging Schedule New York District 1st Qtr FY08 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr FY09FY10 1st Qtr 2nd.
US Army Corps of Engineers BUILDING STRONG ® Mouth of the Columbia River (MCR) Jetties Laura Hicks Chief, Planning and Project Management Branch Pacific.
MOBILE/SAVANNAH DISTRICTS
NAD/SAD REGIONAL DREDGING MEETING/WEDA Jacksonville Harbor and Other Developments U. S. ARMY CORPS OF ENGINEERS COASTAL NAVIGATION BRANCH 10 October 2007.
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers St. Paul District Channels & Harbors Project Presentation for 2012 WEDA Midwest.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
NOAA Restoration Center Implementing the Gulf Regional Sediment Management Master Plan …responding to an ongoing emergency, improving responses to new.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Beach Renourishment By: Charlene Lloyd, Crystal Earle, Richard Byars, Richard Tuckfield, Christine Burgess, Kaley Foley.
OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.
BUILDING STRONG ® Mississippi River Ship Channel Gulf to Baton Rouge, LA Propeller Club for Port of New Orleans 24 September 2015.
Middle Harbor Redevelopment Project WEDA Conference November 5, 2009.
Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro, Chief Harbor Engineer, POLB Emily Ueda, Program.
Wilmington Harbor Project - 96 Act Brannon Quel. Port of Wilmington The Cape Fear River serves as the shipping channel to the State Port in Wilmington,
US Army Corps of Engineers BUILDING STRONG ® Toke Point Marina Pipeline Maintenance Dredging with Flowlane Disposal at Willapa Harbor, Washington Hiram.
SEPOCTNOVDECJANFEBMARAPRMAYJUNJULAUGSEPOCT FY07FY06FY08 Page 1 of 3 FY07 Dredging Schedule New York District Mechanical Dredge Maintenance Dredging Newark.
FY 2017-FY 2021 Project Priorities Bay County TPO Gary Kramer Senior Planner, TPO Staff
The Case for the Federal Hopper Dredge Fleet On the Pacific Coast.
Supply Hazmat 4-09 Florida Defense Support Task Force Grant Program FY Feasibility Study For Proposed Turning Basin At Naval Support Activity.
TOPSAIL BEACH 30 Yr Beach Management Plan June 8, 2011.
US Army Corps of Engineers BUILDING STRONG ® Mississippi Coastal Improvements Program (MsCIP) “Comprehensive Barrier Island Restoration Plan” PIANC 2012.
ATCHAFALAYA RIVER AND BAYOUS HORSESHOE REACH DISPOSAL ALTERNATIVES REVIEWED.
Sand Dollars Federal Shore Protection Appropriations
Beneficial Use of Dredge Materials: Introduction to Dredging and Policy J. Bailey Smith US Army Corps of Engineers April 4, 2011.
Lake Erie Dredge Material: Finding a Solution for Ohio Ohio Brownfield Conference 2016 April 6-7, 2016.
Ecology and environment, inc. ecology and environment, inc. International Specialists in the Environment Georganna B. Collins, International.
UPPER NEWPORT BAY ECOSYSTEM RESTORATION PROJECT NEWPORT BEACH CITY COUNCIL STUDY SESSION FEBRUARY 14, 2006.
Treasure Coast Regional Planning Council
NEW ENGLAND DISTRICT Operations and Maintenance Projects Maine Dredge Team Meeting October 2015 Ed O’Donnell Chief, Navigation Section.
R. E. Randall Center for Dredging Studies
Strategic shoreline placement from coast to coast
Nourishment, Groins, Seawalls, Breakwaters, Jetties.
Estuary Landforms and Features
Beneficial Use of Dredged Material
Fab-Five Projects New Orleans FY19-FY23
Regions of Louisiana.
Regions of Louisiana.
Presentation transcript:

MOBILE DISTRICT DREDGING PROGRAM MOBILE DISTRICT DREDGING PROGRAM NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING MEETING/WEDA US Army Corps of Engineers Mobile District US Army Corps of Engineers Mobile District

Type of Work: Beach Nourishment Length: 1 Mile Quantity: 500 Kcy Distance to Borrow Area: 20 Miles Type of Equipment: Hopper Small Business Set Aside: No Schedule: Mid FY08 Type of Work: Beach Nourishment Length: 1 Mile Quantity: 500 Kcy Distance to Borrow Area: 20 Miles Type of Equipment: Hopper Small Business Set Aside: No Schedule: Mid FY08 Panama City Beach

Mobile Harbor Extension Mobile Harbor Extension 2100/1200 Type of Work: New Work Depth: 45’ Width: 500’ Length: 3300’ Quantity: 300 Kcy Type of Material: Sand/Clay Placement Area: Ocean D/A Distance to Placement Area: 40 Miles Type of Equipment: Bucket/Hopper Set Aside: Yes Schedule: Bid Opening January 2008

Type of Work: New Work Depth: 36’ Width: Widen from 220 to 300’ Length: 20+ Miles Quantity: 5.4 Mcy Type of Material: Hard Sand and Clay Placement Area: New Ocean D/A Distance to Placement Area: 30 Miles Type of Equipment: Bucket/Hopper Small Business Set Aside: No Last Dredged: 2007 Schedule: Bid Opening April 2008 Type of Work: New Work Depth: 36’ Width: Widen from 220 to 300’ Length: 20+ Miles Quantity: 5.4 Mcy Type of Material: Hard Sand and Clay Placement Area: New Ocean D/A Distance to Placement Area: 30 Miles Type of Equipment: Bucket/Hopper Small Business Set Aside: No Last Dredged: 2007 Schedule: Bid Opening April 2008 Gulfport Harbor Widening Gulfport Harbor Widening

Type of Work: New Work Depth: Deepen Upper Sound from 38’ to 42’ Width: Bar Channel widen from 350 to 550’ Length: 11 Miles Quantity: 8 Mcy Type of Material: Sands and Clay Placement Area: Ocean D/A Distance to Placement Area: 20 miles Type of Equipment: Bucket/hopper Small Business Set Aside: No Schedule: Bid Opening – June 2008 Type of Work: New Work Depth: Deepen Upper Sound from 38’ to 42’ Width: Bar Channel widen from 350 to 550’ Length: 11 Miles Quantity: 8 Mcy Type of Material: Sands and Clay Placement Area: Ocean D/A Distance to Placement Area: 20 miles Type of Equipment: Bucket/hopper Small Business Set Aside: No Schedule: Bid Opening – June 2008 Pascagoula Harbor Deepening Pascagoula Harbor Deepening

Figure 1. Project Location Hancock County Streams – Hancock County Marina

Hancock County Streams Cowan Bayou Cowan Bayou

Gautier Streams – 5 channels

Bayou Caddy Marsh Restoration Project Containment Structure New Marsh Bayou Caddy Figure 3. Rendering of proposed plan for Bayou Caddy by Ron Dawkins Bayou Caddy Containment

Type of Work: Beach Nourishment Length: 1 Mile Quantity: 500 Kcy Distance to Borrow Area: 20 Miles Type of Equipment: Hopper Small Business Set Aside: No Schedule: Mid FY09 Type of Work: Beach Nourishment Length: 1 Mile Quantity: 500 Kcy Distance to Borrow Area: 20 Miles Type of Equipment: Hopper Small Business Set Aside: No Schedule: Mid FY09 Panama CityBeach Carillon/Pinnacle Port Panama CityBeach Carillon/Pinnacle Port Carillon/Pinnacle Port

Type of Work: Maintenance Depth: 44’ Width: 500’ - 800’ Length: 5 Miles Quantity: Mcy Type of Material: Silts and Sands Placement Area: Ocean D/A, Beach and Littoral Zone Distance to Placement Area: Varies Type of Equipment: Hopper/Pipeline Small Business Set Aside: No Last Dredged: 1990 Schedule: January 2009 Type of Work: Maintenance Depth: 44’ Width: 500’ - 800’ Length: 5 Miles Quantity: Mcy Type of Material: Silts and Sands Placement Area: Ocean D/A, Beach and Littoral Zone Distance to Placement Area: Varies Type of Equipment: Hopper/Pipeline Small Business Set Aside: No Last Dredged: 1990 Schedule: January 2009 Pensacola Navy Channel Pensacola Navy Channel

Mobile Harbor Turning Basin Mobile Harbor Turning Basin Type of Work: New Work Depth: 45’ Quantity: 3.2 Mcy Type of Material: Sand, Silt and Clay Placement Area: Upland/Gaillard Distance to Placement Area: 13 Miles Type of Equipment: Bucket /Pipeline Small Business Set Aside: No Schedule: mid – FY09 Type of Work: New Work Depth: 45’ Quantity: 3.2 Mcy Type of Material: Sand, Silt and Clay Placement Area: Upland/Gaillard Distance to Placement Area: 13 Miles Type of Equipment: Bucket /Pipeline Small Business Set Aside: No Schedule: mid – FY09 Mobile Harbor Extension

Gulf of Mexico Walton County, Florida Walton County Post-Ivan 2004 May 2003 Dune Lakes Walton County, Florida - Beaches Type of Work: Beach Renourishment Quantity: 2 Mcy Length: 26 Miles Type of Equipment: Hopper/Pipeline Small Business Set Aside: No Schedule: Late FY 09