MOBILE DISTRICT DREDGING PROGRAM MOBILE DISTRICT DREDGING PROGRAM NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING MEETING/WEDA US Army Corps of Engineers Mobile District US Army Corps of Engineers Mobile District
Type of Work: Beach Nourishment Length: 1 Mile Quantity: 500 Kcy Distance to Borrow Area: 20 Miles Type of Equipment: Hopper Small Business Set Aside: No Schedule: Mid FY08 Type of Work: Beach Nourishment Length: 1 Mile Quantity: 500 Kcy Distance to Borrow Area: 20 Miles Type of Equipment: Hopper Small Business Set Aside: No Schedule: Mid FY08 Panama City Beach
Mobile Harbor Extension Mobile Harbor Extension 2100/1200 Type of Work: New Work Depth: 45’ Width: 500’ Length: 3300’ Quantity: 300 Kcy Type of Material: Sand/Clay Placement Area: Ocean D/A Distance to Placement Area: 40 Miles Type of Equipment: Bucket/Hopper Set Aside: Yes Schedule: Bid Opening January 2008
Type of Work: New Work Depth: 36’ Width: Widen from 220 to 300’ Length: 20+ Miles Quantity: 5.4 Mcy Type of Material: Hard Sand and Clay Placement Area: New Ocean D/A Distance to Placement Area: 30 Miles Type of Equipment: Bucket/Hopper Small Business Set Aside: No Last Dredged: 2007 Schedule: Bid Opening April 2008 Type of Work: New Work Depth: 36’ Width: Widen from 220 to 300’ Length: 20+ Miles Quantity: 5.4 Mcy Type of Material: Hard Sand and Clay Placement Area: New Ocean D/A Distance to Placement Area: 30 Miles Type of Equipment: Bucket/Hopper Small Business Set Aside: No Last Dredged: 2007 Schedule: Bid Opening April 2008 Gulfport Harbor Widening Gulfport Harbor Widening
Type of Work: New Work Depth: Deepen Upper Sound from 38’ to 42’ Width: Bar Channel widen from 350 to 550’ Length: 11 Miles Quantity: 8 Mcy Type of Material: Sands and Clay Placement Area: Ocean D/A Distance to Placement Area: 20 miles Type of Equipment: Bucket/hopper Small Business Set Aside: No Schedule: Bid Opening – June 2008 Type of Work: New Work Depth: Deepen Upper Sound from 38’ to 42’ Width: Bar Channel widen from 350 to 550’ Length: 11 Miles Quantity: 8 Mcy Type of Material: Sands and Clay Placement Area: Ocean D/A Distance to Placement Area: 20 miles Type of Equipment: Bucket/hopper Small Business Set Aside: No Schedule: Bid Opening – June 2008 Pascagoula Harbor Deepening Pascagoula Harbor Deepening
Figure 1. Project Location Hancock County Streams – Hancock County Marina
Hancock County Streams Cowan Bayou Cowan Bayou
Gautier Streams – 5 channels
Bayou Caddy Marsh Restoration Project Containment Structure New Marsh Bayou Caddy Figure 3. Rendering of proposed plan for Bayou Caddy by Ron Dawkins Bayou Caddy Containment
Type of Work: Beach Nourishment Length: 1 Mile Quantity: 500 Kcy Distance to Borrow Area: 20 Miles Type of Equipment: Hopper Small Business Set Aside: No Schedule: Mid FY09 Type of Work: Beach Nourishment Length: 1 Mile Quantity: 500 Kcy Distance to Borrow Area: 20 Miles Type of Equipment: Hopper Small Business Set Aside: No Schedule: Mid FY09 Panama CityBeach Carillon/Pinnacle Port Panama CityBeach Carillon/Pinnacle Port Carillon/Pinnacle Port
Type of Work: Maintenance Depth: 44’ Width: 500’ - 800’ Length: 5 Miles Quantity: Mcy Type of Material: Silts and Sands Placement Area: Ocean D/A, Beach and Littoral Zone Distance to Placement Area: Varies Type of Equipment: Hopper/Pipeline Small Business Set Aside: No Last Dredged: 1990 Schedule: January 2009 Type of Work: Maintenance Depth: 44’ Width: 500’ - 800’ Length: 5 Miles Quantity: Mcy Type of Material: Silts and Sands Placement Area: Ocean D/A, Beach and Littoral Zone Distance to Placement Area: Varies Type of Equipment: Hopper/Pipeline Small Business Set Aside: No Last Dredged: 1990 Schedule: January 2009 Pensacola Navy Channel Pensacola Navy Channel
Mobile Harbor Turning Basin Mobile Harbor Turning Basin Type of Work: New Work Depth: 45’ Quantity: 3.2 Mcy Type of Material: Sand, Silt and Clay Placement Area: Upland/Gaillard Distance to Placement Area: 13 Miles Type of Equipment: Bucket /Pipeline Small Business Set Aside: No Schedule: mid – FY09 Type of Work: New Work Depth: 45’ Quantity: 3.2 Mcy Type of Material: Sand, Silt and Clay Placement Area: Upland/Gaillard Distance to Placement Area: 13 Miles Type of Equipment: Bucket /Pipeline Small Business Set Aside: No Schedule: mid – FY09 Mobile Harbor Extension
Gulf of Mexico Walton County, Florida Walton County Post-Ivan 2004 May 2003 Dune Lakes Walton County, Florida - Beaches Type of Work: Beach Renourishment Quantity: 2 Mcy Length: 26 Miles Type of Equipment: Hopper/Pipeline Small Business Set Aside: No Schedule: Late FY 09