STAR Pixel Detector Latch-up in Phase-1, SUZE and Mimosa22 Tests and analysis by Michal Szelezniak.

Slides:



Advertisements
Similar presentations
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
Advertisements

STAR Pixel Detector Phase-1 testing. 22 Testing interrupted LBNL-IPHC 06/ LG Lena Weronika Szelezniak born on May 30, 2009 at 10:04 am weighing.
Results of the ASIC Test New Developments Next Steps Project Meeting.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
M. Szelezniak1PXL Sensor and RDO review – 06/23/2010 STAR PXL Sensors Overview.
PXL RDO System Requirements And meeting goals 11/12/2009BNL_CD-1_SENSOR_RDO - LG1.
1 RTS effect on fake hit rate in Mimostar3 Xiangming Sun L. Greiner, M. Szelezniak H. Matis T. Stezelberger C. Vu H. Wieman Lawrence Berkeley National.
MDT-ASD PRR C. Posch30-Aug-01 1 Radiation Hardness Assurance   Total Ionizing Dose (TID) Change of device (transistor) properties, permanent   Single.
CROSSBAR LAN TEAM 8 CURTIS PETE D. ERIC ANDERSON DANIEL HYINK JOHN MUFARRIGE.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR PXL Detector Project Status.
L. Greiner1SLAC Test Beam 03/17/2011 STAR LBNL Leo Greiner, Eric Anderssen, Howard Matis, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
LBNL Michal Szelezniak, Eric Anderssen, Leo Greiner, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Chinh Vu, Howard Wieman UTA Jerry Hoffman, Jo Schambach.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
Research and Development for the HFT at STAR Leo Greiner BNL DAC 03/15/2006.
L. Greiner 1PXL BNL Safety Review– September 26, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal.
L. Greiner 1HFT PXL BNL FTF– September 27, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
12004 MAPLD: 141Buchner Single Event Effects Testing of the Atmel IEEE1355 Protocol Chip Stephen Buchner 1, Mark Walter 2, Moses McCall 3 and Christian.
Leo Greiner schedule Evolution of Tasks and Schedule.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
M. Szelezniak1PXL Sensor and RDO review – 06/23/2010 STAR Hardware Prototyping Status.
MIMOSA-26 and its readout
FPGA IRRADIATION and TESTING PLANS (Update) Ray Mountain, Marina Artuso, Bin Gui Syracuse University OUTLINE: 1.Core 2.Peripheral 3.Testing Procedures.
PXL Electronics Status update for HFT TC meeting on October 14, 2010 at BNL 1HFT TC 05/11/ LG.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
Presented by Anthony B. Sanders NASA/GSFC at 2005 MAPLD Conference, Washington, DC #196 1 ALTERA STRATIX TM EP1S25 FIELD-PROGRAMMABLE GATE ARRAY (FPGA)
Michal Szelezniak – LBL-IPHC meeting – 3-5 October 2007 MimoStar2 Current test results at LBL Update on recent tests of MimoStar2 sensors performed at.
L. Greiner1IPHC-LBNL Phone Conference 05/2011 STAR IPHC-LBNL Phone Conference News and PXL sensor (Ultimate) testing at LBNL.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
1 PIXEL H. Wieman HFT CDO LBNL Feb topics  Pixel specifications and parameters  Pixel silicon  Pixel Readout uSTAR telescope tests 
PetrickMAPLD05/P1461 Virtex-II Pro PowerPC SEE Characterization Test Methods and Results David Petrick 1, Wesley Powell 1, Ken LaBel 1, James Howard 2.
PetrickMAPLD05/BOFL1461 Virtex-II Pro PowerPC SEE Characterization Test Methods and Results Session L: Birds of a Feather David Petrick 1, Wesley Powell.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
8279 KEYBOARD AND DISPLAY INTERFACING
ULTIMATE: Preliminary Test Results IPHC-LBNL Phone Conference Outline  Ultimate test status  Analogue outputs (tested by Mathieu)  Pixel array + Discriminators.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR PXL Detector Sensor and RDO Review Introduction.
IPHC-LBNL meeting 3-5 April 2008 Radiation damage in the STAR environment and performance of MAPS sensors Compilation of different test results mostly.
Michal Szelezniak – LBL-IPHC meeting – May 2007 Prototype HFT readout system Telescope prototype based on three Mimostar2 chips.
MooreC142/MAPLD Single Event Effects (SEE) Test Results on the Virtex-II Digital Clock Manager (DCM) Jason Moore 1, Carl Carmichael 1, Gary Swift.
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
Xiangming Sun1PXL Sensor and RDO review – 06/23/2010 STAR XIANGMING SUN LAWRENCE BERKELEY NATIONAL LAB Firmware and Software Architecture for PIXEL L.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
L. Greiner 1St. Odile CMOS Workshop – September 6-9, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun,
US Status of GbE Peripheral Crate Controller Ben Bylsma EMU meeting Fermilab, October 21, 2005 Section 1: Hardware Section 2: Firmware Development.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
MS, LG, XS PXL ladder tests at IPHC, May 1-7, Preliminary Ladder Testing Results (part 2) At IPHC MS, XS, LG.
Improvement of ULTIMATE IPHC-LBNL September 2011 meeting, Strasbourg Outline  Summary of Ultimate test status  Improvement weak points in design.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
LU and SEU testing at STAR and LBNL 88” cyclotron LU tests at STAR LU and SEU tests at the 88” cyclotron Test integration with IPHC Test plans IPHC – LBL.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
L. Greiner1IPHC-LBNL Phone Conference 07/10/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
SEU WG, TWEPP SEU mitigation in GBT On behalf of GBT team Circuit design: TMR Full-custom/High Speed Configuration Registers Protocol Some results.
.1PXL READOUT STAR PXL READOUT requirement and one solution Xiangming Sun.
Investigating latchup in the PXL detector Outline: What is latchup? – the consequences and sources of latchup – techniques to reduce latchup sensitivity.
Amsterdam, Oct A. Cotta Ramusino, INFN Ferrara 1 EUDRB: status report and plans for interfacing to the IPHC’s M26 Summary: EUDRB developments.
IPHC-LBL-BNL video conference 19 Jan 2007 HFT development MimoStar2 based telescope.
LBNL Eric Anderssen, Leo Greiner, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak, Chinh Vu, Howard Wieman UTA Jerry Hoffman, Jo Schambach.
Xilinx V4 Single Event Effects (SEE) High-Speed Testing Melanie D. Berg/MEI – Principal Investigator Hak Kim, Mark Friendlich/MEI.
1 PIXEL H. Wieman HFT CDO LBNL Feb topics  Pixel specifications and parameters  Pixel silicon  Pixel Readout uSTAR telescope tests 
The STAR Heavy Flavor Tracker PXL detector readout electronics
Irradiation test results for SAMPA MPW1 and plans for MPW2 irradiation tests Sohail Musa Mahmood
FPGA IRRADIATION and TESTING PLANS (Update)
Maintaining Data Integrity in Programmable Logic in Atmospheric Environments through Error Detection Joel Seely Technical Marketing Manager Military &
Low Level RF Status Outline LLRF controls system overview
RADIATION induced failures in LHC 28th June 2011
Low Level RF Status Outline LLRF controls system overview
Frequency Plot Summary Process Steps
Presentation transcript:

STAR Pixel Detector Latch-up in Phase-1, SUZE and Mimosa22 Tests and analysis by Michal Szelezniak

LBNL-IPHC 06/ LG2 Talk Outline LU & SEU testing goals. SEU facility at BNL and test setup. LU cross-section for sensors measured. SEU. Observations and comments

33 Testing goals LBNL-IPHC 06/ LG Measure Latch-up cross-section in Phase-1 and SUZE. Measure Single Event Upsets in Phase-1 (Optional) Measure Latch-up and possible Single Event Upsets in Mimosa-22 We scheduled testing time at the BNL Tandem SEU test facility to do latch-up testing on May 14-15, 2009

44 Facility at BNL and Test setup LBNL-IPHC 06/ LG

55 Facility at BNL and Test setup LBNL-IPHC 06/ LG LU test program is a VI in Labview running on the PC The VI uses the NI digital IO interface to count latch-up events and reset the power to the DUT. The RDO board provides a firmware based JTAG refresh looking for SEU errors.

66 Facility at BNL and Test setup LBNL-IPHC 06/ LG Hardware used for the latch-up and SEU testing is the existing current RDO system Mass termination board with 4 LU protected power supply daughter-cards. These cards will detect latch-up and remove supply power both in this latch-up test run and in the real Pixel detector system.

77 Latch-up measurements Initial raw data sent to IPHC LBNL-IPHC 06/ LG 0-16F-19 Si-28 Cl-35 Ni-58 Br-81 I-127 Au-197

88 Latch-up measurements Final (corrected) LBNL-IPHC 06/ LG

99 Latch-up measurements Mimosa-22 LBNL-IPHC 06/ LG Mimosa22:

10 Latch-up measurements Phase-1 LBNL-IPHC 06/ LG

11 Latch-up comments All latch-up detected in SUZE occurred on the VDD- FIFO supply line. The lowest cross-section values for Phase-1, SUZE, and M22 are calculated with a single registered latch up occurrence. The corrected LU cross-section plots have removed data that had latch-ups occurring at the reset frequency of the testing system. LBNL-IPHC 06/ LG

12 LBNL-IPHC 06/ LG SEU analysis (first look) PRELIMINARY First look at Phase-1 data shows similar results (single corrupted bits may be possible at LET values slightly lower than for the first latch up events) Goals of SEU analysis Measure onset of errors (first look at the collected data shows that it is in the LET range for latch up events) Check for the likelihood of corruptions 0  1 and 1  0 Check if bit corruptions are equally likely in different registers and at different positions in registers No errors and no latch up More result to come…

13 Observations and comments All 3 prototypes are more susceptible to latch up than Mimostar-2. SUZE is more susceptible to latch up by a factor of ~5. In general, we are not expecting to see these levels of LET during normal running conditions at STAR. Possible exceptions would be unusual events such as beam dumps and during beam injection. We will complete the SEU analysis and report. LBNL-IPHC 06/ LG

14 end LBNL-IPHC 06/ LG