Lessons Learnt and Experience Sharing BY FIDA HUSSAIN (DIRECTOR ENGINEERING) WASA, GDA, GUJRANWALA 2 PUNJAB CITIES GOVERNANCE IMPROVEMENT PROJECT.

Slides:



Advertisements
Similar presentations
ISO EMS OVERVIEW FOR CONTRACTORS
Advertisements

Let’s be responsible in water management NGO “Alternative” Kakanj Bosnia and Herzegovina.
RELIABLE SUPPLIERS Supply Chain Management and Procurement policies in place Supply Chain Management and Procurement policies in place Register all suppliers.
Steve White Urban Water Council US Conference of Mayors
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
EXPÉRIENCE SHARING AND LESSONS LEARNT REGARDING ENVIRONNEMENTAL & SOCIAL MANAGEMENT FRAMEWORK (ESMF) IMPLEMENTATION IN Mian M. Latif Akhter DDO.
Efficient Delivery Shirley Janes Neil Pace. Previous System 7 very different thoughts around DFG 7 very different systems in operation HIA’s weren’t monitored.
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
Northern Ireland Water QUESTOR Centre, QUB. Introduction: UK Water Industry 25 water companies in England & Wales 12 water and sewerage providers 13 water.
PLAN FOR SEPTAGE MANGEMENT UNDER AGARTALA MUNICIPAL COUNCIL BY MILIND RAMTEKE, IAS CHIEF EXECUTIVE OFFICER AGARTALA MUNICIPAL COUNCIL AGARTALA, TRIPURA.
Green Partnerships Local Partnerships for Greener Cities and Regions Pilot sites description the 2 nd PP meeting Portugal, 8-10 July 2013 Hydro-Engineering.
1 Manassas Park Town Meeting 29 October Welcome This is the first Manassas Park Town Meeting Governing Body implemented this as a way to improve.
PCGIP: PROGRESS REVIEW WORKSHOP 5 TH, Jan 2014 Disbursement Linked Indicators (DLIs) & Eligible Expenditure Program (EEPs ) WASA LAHORE.
PUBLIC SECTOR INTERNAL AUDIT IN THE REPUBLIC OF LITHUANIA Mr. Jonas Vaitkevičius Head of Internal Audit and Financial Control Methodology and Monitoring.
The City of North Bend Sanitary Sewer System
National Urban Waste Water Study (Covers catchments with a population equivalent of 2,000 or more outside the Greater Dublin Area) Department of the Environment,
ENVIRONMENTAL MANAGEMENT PLAN
1. PUNJAB CITIES GOVERNANCE IMPROVEMENT PROJECT (PCGIP) WASA (MDA)MULTAN January,
Lessons Learnt and Experience Sharing 2 Presented By Rabia Mehfooz Assistant Director (Engineering) WASA Multan.
1. DRAFT 2 Encourage Economic Growth Establish Regional Branding Committee Identify two Businesses to Receive SEED Incentive Grants Complete Construction.
WORKSHOP ON EXPERIENCE SHARING AND LESSONS LEARNT DURING IMPLEMENTATION OF ESMF IN Presented By SADAT ALI ASSISTANT DIRECTOR WATER QUALITY WASA.
Civil Works, SSA, Assam Every School Beautiful Every Child In School Every Child Learning A xom Sarba Siksha Abhijan Mission.
Punjab Cities Governance Improvement Project (PCGIP)
USAID Environmental Procedures. EA Training Course Tellus Institute 2 USAID Procedures Overview  USAID environmental review requirements are:  A specific.
WSNTG Annual Conference September 2006 Water Services National Training Group 10 th Annual Conference 7 th September 2006.
Physical Building Audit Physical Building Audit By; Engr.Dr.Attaullah Shah PhD ( Civil) Engg, MSc Engg ( Strs), BSc Engg ( Gold Medalist),), MBA, MA (
WSNTG Annual Conference 8 th September 2005 WSNTG 9 th Annual Conference “Water Services Strategic Plans – Fact or Fiction”
Environment Department Experience Sharing & Lessons learn during Implementation of ESMF Muhammad Younis Zahid Muhammad Younis Zahid District Officer.
LIFE THIRD COUNTRIES Development and Implementation of an Integrated System for the Control and Monitoring of the Urban Wastewater Treatment Plants in.
Lessons Learnt and Experience Sharing BY JAMIL AHMED BASRA DISTRICT OFFICER ROADS GUJRANWALA 2 ENVIRONMET AND SOCIAL MANAGEMENT FRAMEWORK (ESMF) UNDE.
BRIEF ON Tehsil Municipal Administration Mailsi TMA Mailsi Online:tmamailsi.com.
Review of the Operational Policies and Guidelines: key issues from a civil society perspective Sven Harmeling, Germanwatch Held.
Year wise Details of Environmental Audits Conducted by SAI India & Appeared in the Audit Reports, as compiled by Regional Training Institute, Mumbai.
Background Management Council (MC) was briefed on approach in early Feb 2003 and approved it Agreed that every Service Group (SG) will participate in.
Experience sharing and Lessons learnt during implementation of Environment & Social Management Framework (ESMF) Engr. DILSHAD AHMED Deputy District Officer,
Experience Sharing and Lessons Learnt regarding Environmental & Social Management Framework (ESMF) Implementation in Presented By Mr. Shafaqat.
WSSB Capacity Enhancement Workshops 1 Session 2: Legal & Institutional Background for Management of Small-Town Water Systems.
5/29/021 Informational Meeting May 29, 2002 Perry Township Administration Building Fourth Street/Bowman Road Sewer Improvement Area.
1 Water Services Training Group 17 th Annual Conference Creating a new Irish Water Industry INEC, Killarney, 5 th September 2013.
“Project Management Office” «Building Climate Resilience in the Pyanj River Basin Project» К arimov N.G PMO Director К arimov N.G PMO Director
1. 2 Punjab Cities Governance Improvement Project (PCGIP) Progress on Year-3 DLI’s CDG Gujranwala 5 January 2015.
CDG Lahore Punjab Cities Governance Improvement Project (PCGIP) Progress Review Workshop 5-6 January’ 2014 City District Government Lahore.
PROGRESS AND WAY FORWARD JANUARY 05, 2015 Punjab Cities Governance Improvement Project (PCGIP) 2.
Statistical office of Montenegro (MONSTAT) & Environmental Protection Agency of Montenegro (EPA) GENEVA, 04 November 2013.
ROAD SAFETY PEER REVIEW Stuart Dungworth I.Eng FIHE MCIHT Reg RSA (IHE) URS/Scott Wilson.
1. 2 Punjab Cities Governance Improvement Project (PCGIP) WASA GUJRANWALA Progress on Year 3 DLI’s 5 January 2015.
Workshop on Restoration of Land Ownership Rights and Strengthening the Land Administration System in Post-Tsunami Aceh Monitoring Project Implementation.
Department of Water Affairs and Forestry Department of Water Affairs and Forestry Department of Water Affairs and Forestry Department of Water Affairs.
2016 SWA Meeting of Ministers of Water, Sanitation and Hygiene: Technical Meeting Addis Ababa, Ethiopia, 17 March National accountability mechanisms in.
Air Pollution Reduction and Climate Protection in Israel’s largest cities May 2008 The Israeli Forum of Self- Government cities Initiative
Hurricane Ike Recovery CITY OF GALVESTON March 26, 2015.
Punjab Cities Governance Improvement Project Progress on the Project Presented by: (MD WASA Faisalabad)
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
Flood Response and Recovery Tony Hanson Environmental Protection Manager Jarrow and Boldon Community Area Forum Thursday 25 th October 2012.
FORMULATING EXTENSION POLICY, KENYA’S EXPERIENCE BY MARY KAMAU DIRECTOR, EXTENSION & TRAINING MINISTRY OF AGRICULTURE KENYA DURING THE EXTENSION WORKSHOP,
STRENGTHENING COMPETENCE IN MAKING PLAN OF SOCIO – ECONOMIC DEVELOPMENT IN PERIOD AT LOCAL LEVEL Presented by Mr. Ngo Sy Bich Vice Director Bac.
Simple Sanitation Technology For Egypt Villages Prepared by Sameh Seif Ghali Executive Director Together Association For development and environment R.
Conventional Facilities/Siting Jonathan Hunt Project X Machine Advisory Committee March 18-19, 2013.
Quality Assurance in Egypt and the European Standards and Guidelines
How to Protect the Local Environment
Public Works/Municipal Utilities Department
Progressing a Single Water Utility Approach
City of Delavan 2017 Budget.
2nd Global Procurement Conference | 4-5 July 2017
PRESENTATION OF MONTENEGRO
Fiscal Year 2017 Final Budget Workshop
Atal Mission for Rejuvenation and Urban Transformation (AMRUT)
Completion Report Summary
WASTEWATER MANAGEMENT 19 September 2018
Relationship between World Bank and Romanian EA requirements
Presentation transcript:

Lessons Learnt and Experience Sharing BY FIDA HUSSAIN (DIRECTOR ENGINEERING) WASA, GDA, GUJRANWALA 2 PUNJAB CITIES GOVERNANCE IMPROVEMENT PROJECT

Contents Schemes of F.Y Implementation of ESMF Lesson Learnt and Experience Sharing

ESMF SUMMARY OF FY Total ADP Schemes Total EEP’s Schemes Application of ESMF Categorization of Schemes 30 % of schemes Target Achieved (%) E-2 for EEPs schemes E-3 for EEPs schemes E-3 for ADP schemes Nil0866%

NONO NAME OF SCHEMEEXPENDITURESTATUS 1 Repair and general overhauling of 5 sludge pumps (10 cusec) discharges each zone III 8.393Completed 2 Repair of general overhauling of 15 cusec pump at Khiali disposal station zone II 2.151Completed 3 Replacement of delivery pipes and other works at disposal stations Alam Chowk, no. 1 garjakh, mughal pura and liaqat chowk lift station zone iii 3.554Completed 4 Repair/const. Of additional manhole chambers and gully grating at papular nursery, amir park, shaheen abad g.T road, civil line, wahdat colony, peoples colony, arfat colony and farid town in zone I 1.443Completed 5 Replacement of sewer lines and construction of additional manholes at katcha khiali road, takia masoom shah, gala mehar bagoo wala, mehar noor wala, darbar qadria and allied areas zone II 1.910Completed 6 Replacement of old sewer lines in dhullay, shaheenabad and gurunanak pura i/c of const. Of additional manholes in zone III 4.596Completed 7 Desilting of sewer lines with winching machine along jinnah road from d.C road under pass to purani abadi jagna Completed 5 SCHEMES OF FY

NONAME OF SCHEMETOTAL EXPENDITURESTATUS 8 Mechanical desilting of sewer lines through winching machine at bajwa road, hafizabad road and paru road 2.785Completed 9 Mechanical desilting of sewer lines through winching machine at hafizabadroad and gondalanwala road 2.465Completed 10 Repair of utility vehicles4.858Completed 11 Restoration of water supply network street no. 32 "y" block peoples colony and repair of 21 nos. Water works zone I 5.201Completed 12 Restoration of water supply network and renovation of 22 nos. Water works zone II 3.975Completed 13 Restoration of water supply network along g.T road small state no. 1 and renovation of 19 nos. Water works zone III 5.297Completed 14 Repair of generators2.193Completed 6 SCHEMES OF FY

NONAME OF SCHEMETOTAL EXPENDITURESTATUS 15 Rehabilitation of drain along G.T Road Easternside and dc road zone I 2.381Completed 16 Rehabilitation of drain along western bypass from Alam Chowk to awan chowk and g.T road zone II Completed 17 Rehabilitation of strom water drainage from general bus stand to 30ft bazar shaheen abad zone III 2.898Completed 18 Manhole covers and frames7.000Completed 19 Articles for sewerage & water supply8.700Completed 7 SCHEMES OF FY

ESMF  An Environmental & Social Management Framework (ESMF) is prepared under PCGIP to ensure the development schemes implemented by the CDGs/WASA/City entities to be environmentally and socially sustainable.

APPLICATION OF ESMF  Environmental and Social Screening of PCGIP and ADP Schemes was carried out.  Environment and Social Management Plans:  Prepared Environmental and Social Management Plans (ESMPs) E-2 category Schemes  EPA, Punjab accorded approvals of these ESMPs  ESMP cost was included in cost estimates, Procurement plan and Bidding Documents

Environmental and Social Monitoring:  ESMF Committee conducted environmental and social monitoring of E-2 schemes  Site visits, photographic records, public consultation at each step, Lab analysis and development of monitoring report)

SOME PICS DURING SURVEY MONITORING

Third Party Validation  For an independent assessment of the ESMF implementation, was held in Gujranwala on 3-5 July TPV team visited following 06 schemes of WASA-G. 1. Restoration of water supply Network along G.T Road Small State No 1 and Renovation of 19 Nos water works Zone-III. 2. Replacement of sewer lines and Construction of Additional Manholes at Katcha Khiali Road, Takia Masoom Shah, Gala Mehr Bagoo wala, Mehr Noor wala, Darbar Qadria and allied areas Zone-II. 3. Replacement of old sewer lines in Dhullay, Shahenabad and Gurunanak Pura i/c of Construction of Additional Manholes in Zone-lll 4. Restoration of water supply Network Street No. 32 "Y" Block Peoples Colony and Repair of 21 Nos water works Zone-I. 5 Restoration of water supply Network and Renovation of 22 Nos Water Works Zone-II. 6. Repair / Construction of Additional Manhole Chambers and Gully grating at Popular Nursery, Amir Park, Shaheen Abad G.T Road, Civil Line, Wahdat Colony, Peoples Colony, Arfat Colony and Farid Town in Zone-l

Lesson Learnt and Experience Sharing  Environmental and social Survey of M&R and ADP schemes by ESMF Committee which was not carried out before ESMF  Environmental and social monitoring of schemes by ESMF Committee during execution, which was not done before PCGIP  Public consultation before, during and after execution schemes  GRM and complaints Management System  Awareness about Punjab Environmental Protection Act 1997 (Amended 2012), Environmental Impact assessment and (EIA) and Initial Environmental Examination due to Workshops and training sessions organized by the Urban  WASA, Gujranwala conducted Environmental Assessment of JICA funded project "Up-Grading Mechanical System for Sewerage and Drainage Services in Gujranwala with the support of The Urban Unit and cases has been submitted with EPA, Punjab.  Environmental Impact Assessment of 04 ADP schemes is in progress  To resolve Gender issues raised during public consultation, there is need of Female staff

THANK YOU