“Providing a high level of sanitary benefits to the communities we serve.” An In House – Phased Approach for Final Clarifier Rehabilitation.

Slides:



Advertisements
Similar presentations
JOINT MEETING OF ESSEX AND UNION COUNTIES Virtual Plant Tour.
Advertisements

Welcome to American #2 Wastewater Treatment Plant.
Wastewater Treatment.
Virtual Tour of Municipal Wastewater Treatment Plant (WWTP) Prepared by Dr. Richard O. Mines, Jr., P.E. Mercer University Environmental Engineering Department.
HURRICANE SANDY PASSAIC VALLEY SEWAGE COMMISSION AIR MONITORING PROJECT JEFF MEYER NORTHERN REGIONAL OFFICE AIR COMPLIANCE AND ENFORCEMENT.
CLARIFIERS Prepared By Michigan Department of Environmental Quality
ENVE 420 Industrial Pollution Control EQUALIZATION Dr. Aslıhan Kerç.
Treatment of Slaughterhouse Wastewater
Brief introduction about Segovia Segovia is a city in Spain, the capital of the province of Segovia in Castile- Leon. It is situated about an hour north.
Wastewater Treatment City of London. What is Wastewater? Water used in our communities and businesses leaves as wastewater to be treated and returned.
Introduction to Septic Tanks John R. Buchanan, Ph.D., P.E. University of Tennessee.
The Town of Discovery Bay Community Services District Wastewater Treatment Plant Master Plan NOVEMBER 9, 2011.
 Carry both sewage and storm water.  During average rainfalls the volume of water is 5-15 times greater than normal.  Sewage treatment plants are not.
Wastewater Treatment Plants & Bacteria: Strategies for Compliance Wastewater Collection Systems Teague Harris Pate Engineers, Inc. John Montgomery Municipal.
TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
Wastewater Treatment. Municipal WW Management Systems Sources of Wastewater Processing at the Source Wastewater Collection Transmission and Pumping Treatment.
Genesee County Drain Commissioner Water and Waste Services Division District #3 Linden WWTP Digester Improvements Project, Phase I Joe Goergen, GCDC -
Results of BOC’s Fog (Fats,Oils,Grease) Reduction Program at a WWTP-62 MGD (234,696 m 3 /Day)
WASTEWATER ENGINEERING
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
FISCAL YEAR BUDGET MONROE METROPOLITAN POLLUTION CONTROL SYSTEM BUDGET 1 Presented by Barry S. LaRoy, P.E. Director of Water & Wastewater Utilities.
Surface Water Treatment Plant
Industrial Heating & Piping Co. Madawaska School Department Energy upgrades to the heating system at the Madawaska High and Middle School.
Leak Detection at C.C.W.A.. History of C.C.W.A. CCWA produces up to 39 million gallons a day of potable water. We have a potable water storage capacity.
The City of North Bend Sanitary Sewer System
 UAB Vilniaus waters - the largest water company in Lithuania, which operates not only in the city of Vilnius, but also the district, Svencionys and.
Feedwater Systems Reliability Users Group Annual Meeting January 20-23, 2014 Feedwater Pump Thrust Bearing Failure Presented By: Kurt J. Weis Rotating.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Hydronic Mechanical Controls
Mechanical for Oil Heat
MONROE METROPOLITAN POLLUTION CONTROL SYSTEM BUDGET 1 FISCAL YEAR BUDGET Presented by Barry S. LaRoy, P.E. Director of Water & Wastewater Utilities.
March 31st and April 1st, 2009Mile High Industrial and Automation Conference The Challenges in Upgrading Plant Automation for an Existing Wastewater Treatment.
Woodland District 50: Operations and Facilities Report Energy Update 2012 Summer Work Five-Year Facility Plan Service Maintenance Agreement Night Time.
Increasing Energy Efficiency at the Allegan WWTP MWEA/AWWA Joint Annual Conference August 19, 2010.
WSNTG Annual Conference September 2006 Water Services National Training Group 10 th Annual Conference 7 th September 2006.
Waste Water Treatment Plant. HOW DO TREATMENT PLANTS PROTECT OUR WATER? Wastewater treatment plants: Remove solids, everything from rags and plastics.
TAOYUAN ENVIRONMENTAL SCIENCE & TECHNOLOGY PARK BUSINESS INVITATION SEMINAR PRESENTATION OF PREFERENTIAL MEASURE & COUNSELING ENVIRONMENTAL PROTECTION.
CHP & DG METERING & MONITORING IN NEW YORK STATE CASE STUDIES AND IMPLEMENTATIONS Presented By: STEPHEN STONE, PE DSM ENGINEERING ASSOCIATES, PC
Relative Performance of Grit Removal Devices Matthew Bodwell Hydro International November 16, 2015.
Texonics Proposal for Production Line Redesign and Retrofit.
Flow Equalization 1.  To overcome operational problems caused by flowrate variations  To improve the performance of the downstream processes  To reduce.
Introduction to Environmental Engineering Dr. Kagan ERYURUK
CITY OF ARCATA -WATER AND WASTEWATER CAPITAL IMPROVEMENT PROGRAM: RATE SETTING.
Wastewater Department Staff Report Gravity Thickener and pumps  Replacement of both thickener pumps, valves, controls, grinder and electrical system.
Phase II and Compost Facility Upgrade Projects February 16, 2012.
Water and Waste Department 2016 CAPITAL WORKS CONSTRUCTION PROGRAM Presentation to Manitoba Heavy Construction Association April 20,
CTC 450 Review WW Collection Systems Types of pipes Installation.
2011 WCW Conference. Fort McMurray James Sacker, Director Environmental Hugh Crawford, Wastewater Supervisor Plant Operations staff Alberta Environment.
Simple Sanitation Technology For Egypt Villages Prepared by Sameh Seif Ghali Executive Director Together Association For development and environment R.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
WATER SYSTEM WORKSHOP February 27, 2012
1 CTC 450 Review WW Sludge Processes. 2 Objectives Understand the basics with respect to operation of wastewater systems.
City of Farmersville Wastewater Project January 26, 2016 Kimley-Horn and Associates, Inc.
Water Filtration Plant Improvements Project Summary
CTC 450 Review WW Sludge Processes.
Process Economics Factors that affect profitability
Wastewater Treatment.
Homeowner Responsibility
Flow Equalization Jae K. (Jim) Park Dept. of Civil and Environmental Engineering University of Wisconsin-Madison.
Wastewater Treatment.
What is an on-lot sewage system?
Pinole-Hercules Water Pollution Control Plant Upgrade Project
Town of Dunn Sanitary District No. 3
Wastewater Treatment.
Completion Report Summary
Homeowner Responsibility
City of Janesville Wastewater Facility Plan Amendment Public Hearing
Wastewater Treatment.
Wastewater Treatment.
WEMCO® Hydrogritter® II Complete Grit Removal Package
Presentation transcript:

“Providing a high level of sanitary benefits to the communities we serve.” An In House – Phased Approach for Final Clarifier Rehabilitation

“Providing a high level of sanitary benefits to the communities we serve.” Angel Rivera Superintendent of Mechanical Maintenance

Slide 3 “Providing a high level of sanitary benefits to the communities we serve.” History of the Buffalo Sewer Authority  When Buffalo was established as a village, all waste was disposed in adjacent bodies of water.  In the 1890’s, health officials agreed that the pollution to the adjacent bodies of water was responsible for many diseases, most notably, typhoid.  Because of persistent pollution on the Niagara River, Canada and the US entered into a treaty in 1909 to protect boundary waters.

Slide 4 “Providing a high level of sanitary benefits to the communities we serve.” History of the Buffalo Sewer Authority Bird Island prior to the construction of the WWTP

Slide 5 “Providing a high level of sanitary benefits to the communities we serve.”  In 1935, the New York State Department of Health mandated the City of Buffalo to stop polluting the Niagara River with waste. Because the city was in financial turmoil at the time, a new authority was created – the Buffalo Sewer Authority.  By 1938, the Authority completed its system of intercepting sewers, and built its primary treatment plant on Bird Island where all city sewage was treated.  This start of the art Primary Sewage Treatment Plant:  Removed and incinerated all solid matter.  Chlorinated all liquid matter prior to discharging into the Niagara River History of the Buffalo Sewer Authority

Slide 6 “Providing a high level of sanitary benefits to the communities we serve.” History of the Buffalo Sewer Authority Bird Island Primary Treatment Plant in 1938

Slide 7 “Providing a high level of sanitary benefits to the communities we serve.”  With the increasing national awareness of the need to more fully protect our water resources, the State in 1966 directed further improvement of our facilities by providing secondary treatment.  With the help of federal and state grants, secondary treatment facilities were constructed and placed in service by  Continual process improvements and upgrades  Examples of Major Capital Improvements since 1981  Fine Bubble Diffuser and Blower Re-rating Project  WWTP SCADA System  New Grit Removal & Disposal System  Sludge Dewatering Centrifuge History of the Buffalo Sewer Authority

Slide 8 “Providing a high level of sanitary benefits to the communities we serve.” History of the Buffalo Sewer Authority Bird Island Primary Treatment Plant 1980’s & 90’s

Slide 9 “Providing a high level of sanitary benefits to the communities we serve.” Supervise and coordinate all activities of the Maintenance Department at the Buffalo Sewer Authority’s Bird Island Wastewater Treatment Plant (WWTP). Responsible for the upkeep and repair of all equipment, utilities, buildings and grounds at the WWTP and eleven (11) Remote Pumping & Metering Stations. Implemented capital projects totaling over $8 million in a 6 year period, including:  Installation of sludge withdrawal equipment on 16 clarifiers, $2.2 million project.  Cleaning of two large (1 million gallon) anaerobic digesters, $1.7 million project.  Rehabilitation of South Buffalo Pumping Station, $1.5 million project.  Annual Rehabilitation of 3 WWTP Incinerators, $1.2 million in total projects.  Rehabilitation of motors and impellers on three 3000/5000 HP blowers, $900,000 project.  Rehabilitation of HP RWWP and HP SWWP Pumps $300,000  Re-tubing of Natural and Digester Gas Fired Boilers, $150,000 project.  Rehabilitation of Substation and Switchgear, $150,000 in total projects. Angel Rivera Superintendent of Mechanical Maintenance

Slide 10 “Providing a high level of sanitary benefits to the communities we serve.” Final Clarifiers What’s Their Purpose  Improve Effluent Quality  Provide a means for solids and floatables to separate from the forward flow and be collected Main Components  Method of Settled Solids Removal  Inlet Arrangements  Method of Scum Removal  Drive Units

Slide 11 “Providing a high level of sanitary benefits to the communities we serve.” Final Clarifiers at the Bird Island WWTP Quantity: 16 Diameter: 130 feet Depth: Side-Wall, Tank Center Total Average Design Flow: 180 mgd Total Peak Design Flow: 360 mgd Type Design: Riser Pipe OEM: FMC (US Filter / Siemens Water Technology) Approximate Age: 25 Years (Installed in 1975).

Slide 12 “Providing a high level of sanitary benefits to the communities we serve.” Final Clarifiers at the Bird Island WWTP

Slide 13 “Providing a high level of sanitary benefits to the communities we serve.” Final Clarifiers at the Bird Island WWTP

Slide 14 “Providing a high level of sanitary benefits to the communities we serve.” Rise Pipe Pier Supported Type Clarifier Diameters larger than 30 feet

Slide 15 “Providing a high level of sanitary benefits to the communities we serve.” Riser Pipe Clarifier Sludge Withdrawal Flow

Slide 16 “Providing a high level of sanitary benefits to the communities we serve.” Riser Pipe Control Riser Pipe Clarifier Sludge Control Box

Slide 17 “Providing a high level of sanitary benefits to the communities we serve.” Final Clarifiers at the Bird Island WWTP

Slide 18 “Providing a high level of sanitary benefits to the communities we serve.” Existing Peripheral Feed & Overflow Sludge Box Influent Flow Sludge to Center Drain Effluent Waste- water Flow

Slide 19 “Providing a high level of sanitary benefits to the communities we serve.” Existing Peripheral Feed & Overflow Influent Flow Effluent Flow

Slide 20 “Providing a high level of sanitary benefits to the communities we serve.” Final Clarifiers at the Bird Island WWTP 1998 Field Evaluation of Secondary Clarifiers By John Esler, P.E. Conclusion:  Moderate short circuiting up to a flow of 11 mgd  High sludge blankets and direct short circuiting at higher flows  At all flow rates, high degree of rotational stirring, creating instability at the tank periphery and retarding the inward current Recommendations:  Reduce rotational rate.  Reconfigure sludge pipes to lay horizontal on collector frame.  Replace variable sized return sludge tubes.  Control individual sludge tube flow in center RAS box with new control valves (“twist turn orifice terminals”).

Slide 21 “Providing a high level of sanitary benefits to the communities we serve.” Final Clarifiers at the Bird Island WWTP Pipes Create Wall Effect Mass Rotation One of five pipes plugged At least 20% floor not picked up Sludge Box Flow Control Drive Unit 24 minutes per revolution

Slide 22 “Providing a high level of sanitary benefits to the communities we serve.” Final Clarifier Rehabilitation December 2001 December 2001  Final Clarifiers 7B & 8B Out of Service Due to Drive Failures and Structural Misalignment.  The Structural Integrity of Truss Arms, Center Cage and Center Pier on both units are in question.  Treatment Plant Maintenance unable to repair units utilizing available parts, supplies and equipment.  US Filter (FMC) brought on site to inspect the condition of the remaining 14 tanks.  Drives on 7 of the remaining 14 tanks in determined to be “marginal” condition (Replacement gap setting >0.375”).

Slide 23 “Providing a high level of sanitary benefits to the communities we serve.” Final Clarifier Rehabilitation December 2001

Slide 24 “Providing a high level of sanitary benefits to the communities we serve.” Final Clarifier Rehabilitation December 2001

Slide 25 “Providing a high level of sanitary benefits to the communities we serve.” Final Clarifier Rehabilitation December 2001

Slide 26 “Providing a high level of sanitary benefits to the communities we serve.” Final Clarifier Rehabilitation Repair of Final Clarifiers 7B & 8B – Choices?  Replace existing drive unit.  Inspect and repair all failed structural components.  High Cost repair with no improvement in performance.  No guarantee that remaining components will not fail in the near future.  Reliability of remaining Final Clarifiers unknown.  Continual high maintenance cost for existing Final Clarifiers Constant withdrawal tube plugging Repairing damaged to collector piping, boots, wipers and supports. Long draining and cleaning time.

Slide 27 “Providing a high level of sanitary benefits to the communities we serve.” Proposed Repairs to Final Clarifiers 7B & 8B Use crane to remove bridge & Railing Inspect and repair: Center Pier, Sludge Box and Center Cage. Use crane to remove and replace Center Drive Unit Separate arms from center cage. Inspect and repair structural damage. Repair or replace all damaged piping, boots, wiper blades, piping support.

Slide 28 “Providing a high level of sanitary benefits to the communities we serve.” Proposed Repairs to Final Clarifiers 7B & 8B Re-attach and rebalance arms. Adjust and level rotating plane.

Slide 29 “Providing a high level of sanitary benefits to the communities we serve.” Final Clarifier Rehabilitation December Meet with US Filter rep to discuss purchase of new Sludge Withdrawal Equipment. Presented with a proposal for two new Tow-Bro Header Sludge Withdrawal mechanisms, including:  Unitube sludge removal headers and supports  H40Ht Drive Unit w/ Reducer, Motor and Overload  Drive Platform  Center Pier  Skimmer Assembly  Associated Bolts and Anchors  Structural Steel Hot Dip Galvanized

Slide 30 “Providing a high level of sanitary benefits to the communities we serve.” Tow-bro Clarifier Design

Slide 31 “Providing a high level of sanitary benefits to the communities we serve.” Tow-bro History and Development Tow-bro developed in 1920’s by Darwin Townsend and James Brower. Envirex, as Rex Chain Belt, installed the first Tow-Bro in Refinements to design resulted in Unitube header developed in 1955 by Envirex To date over 2500 Tow-Bro clarifiers installed.

Slide 32 “Providing a high level of sanitary benefits to the communities we serve.” Tow-Bro Header Peripheral Feed & Overflow

Slide 33 “Providing a high level of sanitary benefits to the communities we serve.” Tow-Bro Header Unitube Header with 23 Withdrawal Points 21” x 21” Manifold Inlet Approximate 2’ Horizontal Profile Drive Unit 33.3 minutes per revolution

Slide 34 “Providing a high level of sanitary benefits to the communities we serve.” Exiting Riser Pipe Final Clarifiers Sludge Box Largest Inlet Pipe 8” Sludge to Center Drain Only 5 Withdrawal Pipes, Horizontal Pipe Arrangement Approximate 5’ Horizontal Profile Drive Unit 24 minutes per revolution

Slide 35 “Providing a high level of sanitary benefits to the communities we serve.” Existing Peripheral Feed & Overflow Influent Flow Effluent Flow

Slide 36 “Providing a high level of sanitary benefits to the communities we serve.” Existing Peripheral Feed & Overflow Sludge to Center Drain Influent Flow Effluent Flow Sludge Box

Slide 37 “Providing a high level of sanitary benefits to the communities we serve.” Tow Bro H-drive

Slide 38 “Providing a high level of sanitary benefits to the communities we serve.” Tow-Bro Strip Liner Drive Unit

Slide 39 “Providing a high level of sanitary benefits to the communities we serve.” Riser-pipe Ball Race Bearing 4 pt. Ball Bearing Oil Bath Felt Bearing Race Cover

Slide 40 “Providing a high level of sanitary benefits to the communities we serve.” Circular Clarifier Drive Units Bearing Arrangements Strip Liner 4 Pt. Contact Tow-Bro H-Drive Bearing Riser-Pipe Ball Race Bearing (4-Point)

Slide 41 “Providing a high level of sanitary benefits to the communities we serve.” Tow-Bro H-Drive Bearing Arrangements Strip Liner Split Gear Field Inspection of bearing 38 to 42 Rc Can be rebuilt, in-place, in the field Low Cost, quick delivery Keeps working after failure

Slide 42 “Providing a high level of sanitary benefits to the communities we serve.” Tow-Bro H-Drive Replaceable Strip Liner Replaceable Strip Liner Main Gear

Slide 43 “Providing a high level of sanitary benefits to the communities we serve.” Tow-Bro H-Drive Replaceable Strip Liner Main Gear Split for On Site Disassembly

Slide 44 “Providing a high level of sanitary benefits to the communities we serve.” Riser-Pipe Ball Race Bearing 4 Point Contact Higher Hardness Higher Loads Factory Repair Only Requires Crane and Lifting of Bridge Locks up with Failure

Slide 45 “Providing a high level of sanitary benefits to the communities we serve.”  Condensate, water, produces oxidation, rust  High carbon content of the balls, races oxidize very quickly  Oxidation leads to surface pits  Surface pits lead to stress risers  Stress risers lead to critical shearing stress  Broken balls Circular Clarifier Drive Units Main Bearing Failures

Slide 46 “Providing a high level of sanitary benefits to the communities we serve.” Circular Clarifier Drive Units Main Bearing Arrangements Oil Lubricated “Water Lubricated”

Slide 47 “Providing a high level of sanitary benefits to the communities we serve.” Passive Automatic Condensate Drain System The Drive is Equipped with piping that allows any Condensate that would otherwise accumulate in the main Drive Housing to drain out. The difference in Specify Gravity between water and lubricating oil used in drive is the principle upon the system functions. Note: Successful operation of the system depends upon the sequence of filling the drive housing initially and every time periodic maintenance is performed. Note: Heat Trace required for operation during periods of below freezing temperature.

Slide 48 “Providing a high level of sanitary benefits to the communities we serve.” Passive Automatic Condensate Drain System

Slide 49 “Providing a high level of sanitary benefits to the communities we serve.” Main Tank Skimmer Assembly Scum Blade Length From Center to Side of Tank

Slide 50 “Providing a high level of sanitary benefits to the communities we serve.” Main Tank Skimmer Assembly

Slide 51 “Providing a high level of sanitary benefits to the communities we serve.” Tow-Bro Benefits for Final Clarifiers 7B & 8 B  New drive, collector, and structural components.  Reduced rotational rate, less stirring of the FC tank.  Lower header profile.  Increased number of withdrawal points, reducing the effect of plugging.  Removal of Sludge Box  Passive Automatic Condensate Drain System  Downside - Real World Performance at BSA Unknown?

Slide 52 “Providing a high level of sanitary benefits to the communities we serve.” Final Clarifier Rehabilitation – December 2001 Final Clarifiers 7B and 8B Out of Service and Cleaned by Maintenance for Repairs by 12/4/01. Maintenance begins initial repairs to both tanks. Discovers structural damage to drive unit, truss arms, center cage and sludge box. Contact US Filter for preliminary budgeting information regarding the replacement Drive Units. Request on-site inspection and evaluation of remaining 14 FC tanks. US Filter on site on 12/10/01 for tank inspection. US Filter submits proposal for Tow-Bro equipment

Slide 53 “Providing a high level of sanitary benefits to the communities we serve.” Final Clarifier Rehabilitation – Dec 2001 to Jan 2001 Maintenance Department reviews and evaluates proposed equipment. Contacts references and validates past performance claims. Maintenance Department works with Process Department to determine design flows. Maintenance Department presents findings to BSA management (General Manager, Financial Officer, Plant Manager). BSA management agrees with finding and BSA Board is polled for approval. January 9, BSA Board Approvals purchase of Tow-Bro Headers for a not to exceed price of $195,000.00

Slide 54 “Providing a high level of sanitary benefits to the communities we serve.” Maintenance Department develops final purchase specifications. January 4, 2002 – Maintenance submits purchase specs for design of new Tow-Bro system. January 25, 2002 – Maintenance Department reviews and approves arrangement plan and elevations for 2 new Tow-Bro Sludge Collectors January 29, 2002 – US Filter releases the design for fabrication. February 5, 2002 – Meet with Mechanical Maintenance Contractor Quackenbush (Q Co.) to review installation requirements for 2 new Tow-Bro Sludge Collectors Final Clarifier Rehabilitation – Jan 2001 to Feb 2001

Slide 55 “Providing a high level of sanitary benefits to the communities we serve.” February – Q. Co. submits proposal for Tow-Bro installation under the terms of the existing Maintenance Contract. Proposal reviewed by maintenance and submitted to BSA Management for approval. Approximate cost for installation of Tow-Bro equipment on both tanks $70,000. February 27, 2002 – BSA Board approves Q. Co, proposal for a not to exceed cost of $70,000. March 4, 2002 – US Filter begins shipping Tow-Bro components March 18, 2002 – Q. Co mobilizes on-site and begin receiving major Tow-Bro components (Trusses, Headers, Drive Unit) Final Clarifier Rehabilitation – Feb 2001 to March 2001

Slide 56 “Providing a high level of sanitary benefits to the communities we serve.” March 22, 2002 – Last major Tow-Bro components ships from US Filter fabrication shop. March 22, 2002 to May 24, 2002 – Q. Co proceeds with installation of Tow-Bro equipment in Tanks 7B & 8B. Maintenance Department supervises and inspects all work by contractor. May 27, 2002 – US Filter and Maintenance Department complete the start-up and testing of completed units. Both units on-line by first week in June. June 2002 to July 2002 – Both units in service with Plant Operations. July 24, 2002 – Performance Testing by CPE Services begins. Final Clarifier Rehabilitation – March 2001 to July 2001

Slide 57 “Providing a high level of sanitary benefits to the communities we serve.” Final Clarifier Rehabilitation – Construction Photos

Slide 58 “Providing a high level of sanitary benefits to the communities we serve.” Final Clarifier Rehabilitation – Construction Photos

Slide 59 “Providing a high level of sanitary benefits to the communities we serve.” Final Clarifier Rehabilitation – Construction Photos

Slide 60 “Providing a high level of sanitary benefits to the communities we serve.” Final Clarifier Rehabilitation – Construction Photos

Slide 61 “Providing a high level of sanitary benefits to the communities we serve.” Final Clarifier Rehabilitation – Construction Photos

Slide 62 “Providing a high level of sanitary benefits to the communities we serve.” Final Clarifier Rehabilitation – Construction Photos

Slide 63 “Providing a high level of sanitary benefits to the communities we serve.” Field Verification Study - Goals July 2002, CPE Service Inc. (John Elser, P.E.) hired to Study performance of new Tow-Bro verse existing Riser-Pipe Field investigation designed to a accomplish the following:  Develop flow curves and determine detention times  Determine location and intensity of major currents using velocity profile test and full-depth solids profiles.  Determine Theoretical solids loading capacity of each clarifier using solids flux / state point analysis  Characterize the relative performance of the two clarifiers.

Slide 64 “Providing a high level of sanitary benefits to the communities we serve.” Field Verification Study – Conclusions Tow-Bro clarifier develop the inward flow pattern that is desirable for peripheral feed / peripheral overflow clarifier. Tow-Bro clarifier maintained a lower blanket further assisting the inward flow pattern. Tow Bro better controlled sludge blanket as flow rates varied. Tow-Bro was able to operate at significantly higher flow rate that the existing Rise-Pipe. Two-Bro able to maintain a more concentrated return activated sludge flow that existing Rise-Pipe.

Slide 65 “Providing a high level of sanitary benefits to the communities we serve.” Phased Approach for Final Clarifier Rehabilitation Based on documented performance of the new Tow-Bro system the BSA’s management developed a phased approach to rehabilitating the remaining 14 final clarifiers. A preliminary plan calling for the rehabilitation of the remaining clarifiers at a rate of four clarifiers per year was submitted as part of the BSA’s Annual Capital Improvement Plan. Equipment purchase and installation funded annually based on savings and rollover of operating funds from previous budget years. Tow-Bro equipment purchased by Maintenance directly from the manufacture US Filter as funding became available. All purchase specification developed by Maintenance Department without the use of outside consultants

Slide 66 “Providing a high level of sanitary benefits to the communities we serve.” Phased Approach for Final Clarifier Rehabilitation Installation contract developed by and bid annually by the BSA Maintenance and Engineering Departments. Contract installation requirements developed by Maintenance Department without use of outside consultants. All contract equipment, supplies and labor inspected directly by Maintenance Department. Rehabilitation of tanks based on severity of existing tank conditions (i.e. Worst Tanks First). Installation contract revised annually, prior to bidding, to address problems encountered in previous years contract (i.e. Change Orders, Contract Clarifications, Etc)

Slide 67 “Providing a high level of sanitary benefits to the communities we serve.” Phased Approach for Final Clarifier Rehabilitation Footnotes: 1.Equipment price held for 2 years at $83,667 per FC. 2.Price increase to $97,000 per FC due to escalating Steel Price. 3.Installation Completed without Change Orders. 4.First project to include Weir Wall Rehabilitation Start Year Final Clarifiers Purchase Cost Installation Cost Total Project Cost Per Unit Cost 20027B, 8B$195,000$74,463$269,463$134, A,4A,4B,6B 1 $334,688$142,320$477,008$119, A,7A,8A,1B 1 $334,688 3 $151,200$485,888$121, A,5A,2B,5B 2 $387,834 3 $151,800$539,634$134, A,1B 2 $194,000 4 $261,790$455,790$227,895 Cost to Date$1,446,210$781,572$2,227,782$139,236

Slide 68 “Providing a high level of sanitary benefits to the communities we serve.” Phased Approach for Final Clarifier Rehabilitation Installation Contract revision include the following activities:  Material Disposal  Electrical Connections  Floor leveling and concrete breakouts  Scum trough piping.  Weir Plate Adjustment  Weir Plate Pipe Support Replacement  Sandblasting and Painting of all Metal Surfaces in Final Effluent Tank.

Slide 69 “Providing a high level of sanitary benefits to the communities we serve.” Phased Approach for Final Clarifier Rehabilitation – Photos Upper Weir Wall Supports

Slide 70 “Providing a high level of sanitary benefits to the communities we serve.” Phased Approach for Final Clarifier Rehabilitation – Photos Lower Weir Wall Supports (under skirt)

Slide 71 “Providing a high level of sanitary benefits to the communities we serve.” Phased Approach for Final Clarifier Rehabilitation – Photos Rehabilitated Upper Weir Wall Supports

Slide 72 “Providing a high level of sanitary benefits to the communities we serve.” Phased Approach for Final Clarifier Rehabilitation – Photos Rehabilitated Weir Wall

Slide 73 “Providing a high level of sanitary benefits to the communities we serve.” Phased Approach for Final Clarifier Rehabilitation – Photos Rehabilitated Lower Weir Wall Supports (under skirt)

Slide 74 “Providing a high level of sanitary benefits to the communities we serve.” Phased Approach for Final Clarifier Rehabilitation Next Phase – Weir and Tank Rehabilitation. Activities that may be included are the following:  Weir Plate Adjustment  Weir Plate Pipe Supports – both above and bellow Weir Skirt  Sandblasting and painting of all metal surfaces.  Final Clarifier Floor Coating (re-lining).  Repositioning of Inlet Channel flow holes  Raising of inlet channel wall to increase peak influent flow Continue rehabilitation rate of 4 tanks per year. Completion of all final tanks project to be completed by 2010

“Providing a high level of sanitary benefits to the communities we serve.” James Skrabacz – Maintenance Department Roberta Gaiek P.E., Jane Ork – Process Department Sal LoTempio (Ret.), James Keller – WWTP Superintendent Frank DiMascio P.E., Joe Baudo (Ret.), Jim Eagan – BSA Engineering David Comerford – BSA General Manager Herbert Bellamy - Buffalo Sewer Authority Board Chairman US Filter / Siemens Water Technology Special Thanks to the following :

“Providing a high level of sanitary benefits to the communities we serve.” Angel Rivera Superintendent of Mechanical Maintenance Buffalo Sewer Authority 90 West Ferry St. Buffalo, NY Office: (716) ext 217 Fax: (716) Thank you very much for your attention.