Little Falls Powerhouse Modernization Presented by Brian Vandenburg Avista Utilities, Spokane, WA.

Slides:



Advertisements
Similar presentations
Grant County PUD Plant Upgrades at Wanapum and Priest Rapids Dams
Advertisements

Calcit Gospić Factory of calcite fillers Delivery and commissioning of medium and low voltage cabinets Elektro-Čelik d.o.o. Markovićeva 28 Križevci, Croatia.
Engineering Technology Division
Offshore Wind 2004 From Vindeby to Nysted A Manufacturer’s Experience Henrik Stiesdal Bonus Energy A/S.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Bonneville Power Administration - Pumped Storage Evaluation Northwest Hydroelectric Association.
Activity INDUSTRY OIL EXTRACTION CONSTRUCTION INDUSTRY ENVIRONMENTAL PROTECTION ENERGY SCOPE OF SERVICES 1.
1 ELECTRICAL EQUIPMENT AND SYSTEMS – OFFSHORE AND ONSHORE FACILITIES MAIN ELECTRICAL EQUIPMENTS AND SYSTEMS INSTALLED  GENERATORS: MAIN GENERATORS – 12.
2014 Northwest Hydro Operators Forum Special Thanks To Our Sponsors: 1.
Seneca Overview & Generator Rewind
SURATGARH SUPER THERMAL POWER STATION
This Project consists of the following major elements Install new 15kV padmount switchgear Underground 15kV conduits and cable Underground Communications.
US Army Corps of Engineers BUILDING STRONG ® Gary Hinkle, PE June 10, 2014 Mid-West Electric Consumers Association Board of Directors Meeting Sylvan Lake,
Energy Delivery Delivering energy safely, reliably, efficiently and affordably. Holland Bottom 500/161/115kV Substation.
Nelson Hydro Downtown Conversion July 26, 2010 Project Overview.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
Customer Meeting April 28, 2010 Torrington, WY. Agenda Introductions Accomplishments Update on Torrington Area PVVC Overview PVVC Schedule and Cost Estimates.
 How do we obtain windenergy? The technique behind windenergy by Jesse Voorhorst en Constantijn van der Eijk.
HYDRO-ELECTRIC POWER PLANT Prepared by SREEJITH K. & NICE MENACHERY APME APME JEC JEC.
- Constructions with high technology - 20 years of experience - Located in Rio de Janeiro - Turn Key solutions - Diversing portfolio of business (international.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
Flanders Electric – Engineering Division Welcomes Youto an Overview of Reconditioned Switchgear.
GE Consumer & Industrial Multilin  Single & Three phase models  Specific mount CT’s  Rectangular & Toroidial models  Plastic case & cast models  Multi.
Local Motion Marco Maffeo-Robinson Sean Horning Justin White Ross Ziskind Tom Kidd Advisor: Professor Coleman Company Contact: Brian Costello.
Interconnection of Distributed Generation
© ABB Group August 13, 2015 | Slide 1 Power Generation Service Life Cycle Management for Power Plants Daniel Looser, Power Gen Europe in Amsterdam, June.
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
5/17/2000Summer Preparedness /17/2000Summer Preparedness SRP SUMMER PREPAREDNESS 2000 Presented to the Arizona Corporation Commission May.
Desert Sky Wind Farm January 2004 Welcome Desert Sky Wind Farm Pecos County, Texas.
Power Grid
Upgrade 138kV Underground Circuit From Polk to Garrott Substations ERCOT RPG Meeting January 13,
Power Plant Construction and QA/QC Section 7.4 – Hydroelectric Generators, Transformers and Controls Engineering Technology Division.
1 Impact of the 2004 Hurricanes Hurricane Charley Landfall on August 13 th Customers affected Poles replaced Transformers replaced Miles of wire replaced.
 UK Power Networks. All rights reserved Demonstrating the benefits of energy storage on an 11 kV Distribution Network Matthieu Michel – Technology.
Rocky Mountain Power Sub Transmission Five Year Study Findings and Kick Off Attachment K Meeting September 10, 2015.
1 The following are the planned transmission project at SCL for the next ten year. All the projects has no major impact to the bulk transmission system.
Interpoles.
1 Broken Hill Solar Plant Community Information Session 1 July 2015.
Hydroelectricity. little bit of information about hydroelectricity, well first is does involve water it can either be falling or the flow of the water.
1/20 ea technology MicroCHeaP: Month 24 meeting Athens Work Package 4 presentation 21 September 2006 Presented by Yvonne Dickson Partners in power asset.
January 2009 SEMO Ice Storm Extreme Measures IEEE-PES St Louis Chapter Meeting June 18, 2010 Presented by David Wakeman Vice President, Energy Delivery.
Alaska Municipal League 59th Annual Local Government Conference The Programs of the Alaska Energy Authority Energy and Empowerment for Your Communities.
1 | Program Name or Ancillary Texteere.energy.gov Percheron Power, LLC’s Proof of Power Project on Potholes East Canal (POP ‐ PEC) 2011 Water Power project.
Alternating and Direct Current Direct Current (DC) is the one way flow of electrical charge from a positive to a negative charge. Batteries produce direct.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
ACADs (08-006) Covered Keywords Turbine Auxiliaries, Mechanical Systems, Gates, Cranes and Hoists. Description Supporting Material
Steady State Analysis Of A Microgrid Connected To A Power System
Home Electromagnetism. Home The Motor Effect 16/02/2016 Aim: To use Flemming’s Left Hand Rule To explain how a motor works To construct a motor.
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
Improving Efficiency at APS Cholla Power Plant Caleb Breazeale, David Bruce, Joe Davidson Department of Electrical Engineering, Northern Arizona University,
Wind Turbine Power Plant. Sources ●
US Army Corps of Engineers BUILDING STRONG ® Power Plant Uprate Brief Missouri River Mainstem Mid-West Board Meeting Gary Hinkle Omaha District June 2015.
The history of BALTIC WIND SOLUTIONS growth 2 Experience Quality Safety Accepting the challenge 3 What is BALTIC WIND SOLUTIONS?
North Coast Wind Farm Tolano Environmental Consulting.
Welcome to Cedar Ridge Wind Farm Alliant Energy’s first fully owned-and-operated wind facility.
Rajdhani Institute of Technology & Management Rajasthan Technical University Submitted By:- Name:- Tapan Sharma RTU Roll no. :-09ERDEE057 Stream:- Electrical.
1 Electric Utility Power Systems Generation of Electricity.
Permanent Solutions to Temporary Loads: An Alternate Approach to Electrical System Design for Short Term and Mobile Industrial Loading Presented by: Eli.
Warren A. Witt Director of Hydro Operations Ameren Missouri
High Temperature Superconducting (HTS) Cable Project
YEL WIND POWER PROJECT. YEL WIND POWER PROJECT.
Western States Power Corp.
Customer fund program update
Welcome to the Libertyville Stormwater Master Plan Open House
Renewables: Moy Wind Farm
SIGENTICS HV Series S-modyn
MICE RF System Power Supplies, Control and Monitoring Status report
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Engineering Technology Division
Overview Key diagram of 220 KV Sub station, Ablowal Cables
Pacific Power Seismic Preparedness Update
Presentation transcript:

Little Falls Powerhouse Modernization Presented by Brian Vandenburg Avista Utilities, Spokane, WA

Welcome to Little Falls Act of Congress in 1905 Commissioned in 1912 Four units at 9MW each 600ft Spillway

Why Little Falls? January 2010 Damaged breaker and commutator July 2006 Damaged breaker and commutator September 2010 Damaged breaker, commutator and generator winding

Little Falls Scoping Vertical vs Horizontal Payback Logistics Foundation Unknowns

Engineering Troubles… Turnkey DesignIn House Design

Little Falls Schedule Exciter and Breaker UpgradeCompleted Crane UpgradeCompleted New WarehouseCompleted Station Service Infrastructure UpgradeIn Construction Unit 3 OutageJuly Feb 2015 Station Service Auxiliary SystemsSpring 2015 Unit 1 OutageJuly Feb 2016 Headgate UpgradeJuly Oct 2015 Unit 4 OutageJuly Feb 2017 Spillgate System Upgrade??? Unit 2 OutageJuly Feb 2018

Medium Voltage Breakers 4kV Breaker Upgrade Uprated the generator breakers and buswork

Excitation System Exciter System Upgrade Amplidyne & Rotational Exciters replaced with Static Excitation System

Crane Upgrade Replaced motors for all four motions. New cab and radio controls.

Dealing with a small powerhouse Loading bay inside the plant is only 20ft wide, making logistics challenging

Long Lake Warehouse The Long Lake Warehouse was built 8 miles from Little Falls to be shared between the two plants

Station Service Upgrade New transformers, low voltage switchgear and motor control centers are being installed. Designed for future expansion.

How to Get Funding Original Little Falls generator half and turbine being delivered to site

Generator Replacement Generator frame design to ‘LOOK’ like the old frame as much as possible

Unit Upgrades: A Quick Look Replacing 9MVA generators with 12MVA generators Replacing turbines on units 1, 3 & 4. New PLC-based governor and HPU system on all four units Protection and Controls Upgrade New generator cables Rebabbit generator and turbine bearings Reinsulate field poles to class F Flow monitoring Aux System overhaul: Bearing Oil system, Brakes, Vacuum BKR, Wicket gate resleeving and painting

Little Falls HED, circa 1915