Garden City Public Schools 2009 School Investment Bond.

Slides:



Advertisements
Similar presentations
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Advertisements

Blissfield Community Schools Strategic Plan Facilities Team.
February 16, Tonight’s Agenda  Review Assets and Challenges From Last Meeting  Review Necessary Assumptions  Look at Possible Considerations.
“Children First!” ENCINITAS UNION SCHOOL DISTRICT “Children First!” PROPOSITION P.
 Board of Trustees - Reviewed and prioritized the needs from previous MISD facility assessment and programmatic changes in curricular and extracurricular.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
REFERENDUM 2014 Building Maintenance. Referendum 2014 Focused on providing a safe and healthy learning environment for students Fiscally responsible:
 Mechanical  Electrical  Safety/Security  Video surveillance  Fire safety  Access control  Enhanced Programming  Roofing/Structural/Site Work.
Hingham Public Schools Preliminary Budget Information FY 2016 Service and Facilities January 12, 2015.
School District Merger Study Crown Point Central School and Ticonderoga Central School Facilities April 17, 2013 Castallo and Silky Education Consultants.
Bond Election Presentation 2014 Webb Consolidated ISD.
Remsenburg – Speonk Union Free School District Elementary School Bond Planning Presentation October 12, 2010 BBS Architects and Engineers and Triton Construction.
BOND 2013 Election Day November 5th. SMART School BOND 2013 November 5 th Ballot Proposal Bond proposal for facility & site improvements to address student.
Accredited with “Distinction in Performance” St. Clair R-XIII School District.
Proposed Budget Presentation APRIL 21, 2015.
Tuesday, October 2, 2012 MSS Room #1.  The Leadership Team has not had a formal discussion about HSD facilities.  Individual discussions have taken.
Superintendent’s Recommendations for District Improvement Related to Facility Needs VICTORIA PUBLIC SCHOOLS.
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
Building for Their Future Dublin Unified School District.
PEQUOT LAKES SCHOOLS ISD #186 DISTRICT FACILITIES PLANNING.
Supplemental Levy Election Tuesday, March 11, 2014.
Jan 31, 2005 Community Update. Jan 31, 2005 Thanks to the voters… Measure R passed with over 63% of the vote $3.87 billion for “the Safe and Healthy Neighborhood.
GC-4 April 2011 Bond Issue  Questions And Answers… 1.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
Introduction to the Rochester City School District Facilities Modernization Program Browncroft Neighborhood Association October 11, 2006.
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
Successful Bond Programs (Community Engagement) Cathy Allen, Chief Operations Officer Facilities Support Services September 22,
INDEPENDENT AUDITOR’S REPORT JUNE 30, 2015 ISD #413 Marshall Public Schools HOFFMAN & BROBST, PLLP.
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
Maintenance & Operations Replacement Levy and School Improvements Bond Election Day: February 9, 2016.
Making Our Facilities Better Board of Directors Update – Wednesday, July 24, 2013.
Proposition S “Students First” Election Day, Tuesday, April 5.
Ontario School Boards 72 district school boards in Ontario Approximately 4,900 schools TDSB presently operates 551 active schools Approximately 11.3% of.
2007 DSISD School Bond Program DRIPPING SPRINGS INDEPENDENT SCHOOL DISTRICT Bond Election: November 6, 2007.
SMITHVILLE R-II SCHOOL DISTRICT Tradition of Excellence The Power of One … One Community … One Future! November 4, 2014 SMITHVILLE R-II SCHOOL DISTRICT.
SINKING FUND PROPOSAL OCTOBER 3, SINKING FUND ADVISORY COMMITTEE PURPOSE: DEVELOP A LIST OF RECOMMENDED PROJECTS FOR THE 2012 SINKING.
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
Proposed 2013 Bond A Smart Plan For Continued Excellence In The Dearborn Public Schools Proposed 2013 Bond A Smart Plan For Continued Excellence In The.
FY2017-FY2026 GDRSD Capital Plan-June 22, 2016 Jared Stanton, Director of Business and Finance.
SCHOOL #1 BALLOT QUESTION AND PROPOSAL Fall, 2016.
Development of a Comprehensive Modernization Project at Burroughs Middle School Community Meeting January 20, 2016.
Facilities Focus Group
AHISD Mission Statement
Windsor C-1 School District Planning 2017
Cuba-Rushford CSD Capital Project
April 2016 Bond / Facilities Update Presentation
Budget Overview State Budget Overview M & O Levy Review
Proposed School Bond Referendum September 26, 2017
Cornwall Central School District
Capital Construction Bond Program
School #1 Ballot Question and Proposal
Bond and Override Report
VCSD Capital Project Forum
Dr. Joseph Meloche Superintendent of Schools Mrs
Energy Performance Contracting Services Under WI Act 32
FIVE YEAR CAPITAL FACILITIES PLAN (Five Year Plan)
Fort Cherry School District
UNION GROVE ELEMENTARY REFERENDUM
Referendum Discussion
2018 Bond Review and Proposal
2007 Bond Issue Capital Improvement Program
Garden City Public Schools Capital Reserve
Pillager Public School District Community Survey Results
Recent Bond Accomplishments
Chimacum District Facility & Program Plan
East Troy Community School District Community Survey Results
Moving from Consumers to Producers Kings Park Central School District
Zumbrota-Mazeppa School District Community Survey Results
Presentation transcript:

Garden City Public Schools 2009 School Investment Bond

Garden City Public Schools 2009 School Investment Bond 2 Reaching out to all voters What: $36.5 million referendum When: Tuesday, October 27 Where: Garden City High School Why: All nine district buildings are in need of significant repair, modernization and/or restoration; Homestead, Garden City Middle School and Garden City High School require additional instructional space

Garden City Public Schools 2009 School Investment Bond 3 What will the bond accomplish? The projects proposed in the bond are based on a comprehensive needs analysis Improvements will enable the district to meet basic safety and code requirements Improvements will help maintain Garden City’s tradition of excellence Improvements will provide access for all students and community members Improved facilities are a resource for the entire community

Garden City Public Schools 2009 School Investment Bond 4 What are the bond’s educational benefits? Reclaim and repurpose learning space and make optimal use of instructional time Protect Garden City’s tradition of educational excellence by modernizing existing space and expanding facilities at Homestead, the Middle school and the High School Provide appropriate learning environments for students with special needs receiving support services Create opportunities for 21 st century learning Maintain small class sizes, middle school teaming and continuum of services in special education

Garden City Public Schools 2009 School Investment Bond 5 How were projects identified? In the past four years, the District conducted two comprehensive analyses of its facilities, as well as two demographic studies In the school year, the Board of Education established the ad hoc Committee on Facilities “to review the facilities needs…and make recommendations to the Board regarding the condition of the physical plant and improvements required to address the district’s educational programs and demographic trends.”

How were projects identified? After extensive discussion and review, the Facilities Committee recommended a conservative list of projects that addresses only the most pressing needs Several major energy-related projects will be addressed through an Energy Performance Contract (EPC) at no additional cost to the taxpayers Garden City Public Schools 2009 School Investment Bond 6

Facilities Committee James Carney Peter Clarke John DeMaro Evelyn Fasano Tina Halvatzis Frank Ruggiero Susan Lee Patrick Mehr Dave Perrotta Jean Ricotta Al Chase, Chair Garden City Public Schools 2009 School Investment Bond 7 Angela Heineman--Board of Education liaison BBS Architects & Engineers—District architect

What problems will the bond address? Masonry Windows Grading High School roof Interior and exterior door deterioration Lack of accessibility for people with disabilities Stairways and landings Middle School locker rooms (will be relocated to first floor) Middle School: hallway traffic congestion and parking and pick-up/drop-off for students Garden City Public Schools 2009 School Investment Bond 8 Water damage

What problems will the bond address? Garden City Public Schools 2009 School Investment Bond 9 Deficient/outdated spaces for educational programs and community events High School music programs Undersized rooms for support services for students in special programs Middle School north gym Homestead music/art/physical education Warren King Field bleachers

What problems will the bond address? Heating and ventilation Equipment well beyond useful service life--Results in increased maintenance, low efficiency and higher utility bills Reduced temperature control and air quality Low reliability—parts may be unavailable Garden City Public Schools 2009 School Investment Bond 10

Why do we need a bond? School districts have limited means through which to address major capital projects The scope of the projects is too vast to be addressed through the annual district budget Action is needed to prevent further deterioration and higher costs in the future Garden City Public Schools 2009 School Investment Bond 11

Why do we need a bond? A bond reduces the threat of tax spikes required to pay for extensive renovation/repair projects in a single year A bond spreads the cost of long-lasting capital improvements over a number of years, rather than placing the funding burden solely on current taxpayers The district can benefit from the current difficult economic climate because interest rates are low and many contractors are seeking work Garden City Public Schools 2009 School Investment Bond 12

Why do we need a bond? It is not unusual for school districts to bond every years—one nearby similar district bonds every 7-8 years Manhasset: $21.5 million; $19 million Seaford: $10.8 million; $21.6 million Bay Shore—1995--$18.2 million; $83.7 million Northport-East Northport: $30.5 million; $3.4 million Plainview-Old Bethpage: 1999—$24.3 million; $2.6 million Rockville Centre: $12.1 million; $2.3 million; $15.2 million Garden City has floated only 2 bonds for improvements to its school buildings in the last 50 years: one in the 60s and one in Long Beach, with a similar bonding history, passed a $95 million bond last spring to address long-delayed needs Garden City Public Schools 2009 School Investment Bond 13

What will the bond cost taxpayers? The project total is $36.5 million The district will need to borrow a maximum of $35.2 million  $1.3 million in existing capital funds will be used to fund some of the project total  Anticipated to be additionally offset by $1.35 million in EXCEL aid from New York State Borrowing is expected to occur in 3 phases between 2010 and 2012 Garden City Public Schools 2009 School Investment Bond 14

What will the bond cost taxpayers? The District’s bond rating is excellent: AA+ At its peak, the School Investment Bond will cost approximately 71¢/day or $261/year for the average homeowner The interest rate is conservatively estimated at 4.5%; actual borrowing costs may be less After 6/30/15, property tax attributable to all debt service begins to decline Garden City Public Schools 2009 School Investment Bond 15

Garden City Public Schools 2009 School Investment Bond 17

Comparison of Per Pupil Costs Garden City Public Schools 2009 School Investment Bond 18

What projects have been completed through the annual district budget capital allocation? Stewart and Stratford dual-fuel boiler conversions Homestead, Hemlock & MS roofs HS auditorium lighting Resurface HS track MS Scan-Tek technology lab Stewart & Stratford playground resurfacing IT disaster recovery project MS south gym bleachers HS locker rooms HS/MS cafeteria renovations Bus garage roof Fuel tank repairs Doors, roof and & masonry repairs--district- wide Garden City Public Schools 2009 School Investment Bond 19 Note: List is not all-inclusive

What was done as a result of the 1998 bond? Extensive projects were completed Classroom additions at primary, elementary and middle schools Libraries at Stewart, Stratford, MS & HS Elevators at Stewart & Stratford Electrical upgrades—All buildings Science room renovations—HS Outdoor track, parking lot, tennis courts—HS Auditorium seating—MS and HS Hallway lighting and flooring—Stewart Lunch room--Stratford Garden City Public Schools 2009 School Investment Bond 20

What was done as a result of the 1998 bond? The original bond proposed in 1997 totaled $50 million; it did not pass A revised $38 million dollar bond passed in 1998 It was assumed when the 1998 passed that the projects deleted from the original proposal would need to be addressed in future years, as facilities aged and enrollment increased at the secondary level Garden City Public Schools 2009 School Investment Bond 21

What was NOT included in the 1998 bond? Replacement of High School roof Air conditioning in libraries & auditoriums Turf fields Computers Additional music space at High School Bleachers Garden City Public Schools 2009 School Investment Bond 22

Garden City Public Schools 2009 School Investment Bond 23 Repairs needed…

Garden City Public Schools 2009 School Investment Bond 24

Repairs needed … Garden City Public Schools 2009 School Investment Bond 25

Next Steps Submission of plans to State Education Department Approval by SED (8-12 weeks) First phase borrowing (spring/summer 2010) Work commences—Summer 2010 Garden City Public Schools 2009 School Investment Bond 26

Garden City Public Schools 2009 School Investment Bond 27 Questions & Answers Visit the Garden City School District Web site for ongoing information updates