MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.

Slides:



Advertisements
Similar presentations
BIM Education at Stanford University
Advertisements

East Hampton High School July 2013 – July 2014 Design Phases.
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
Westminster Town Hall 1770 ● 1835 ● 1889 ● 2011 Continuing a Historical Legacy.
Bond Program Planning Imperatives Study Session October 12, 2004.
Measure C Board of Trustees Update January 18, 2005.
Source One Source One Network and Building Solutions.
Guidelines and Required Codes That Affect Building Design
Update on FCPS Construction/Renovation Projects August 2009.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
Presented by: Jane Briggs and Karen Mitchell October 11, 2007 The New LEED Building at Shady Grove.
1 Purpose  Summarize Monday’s workshop  Update on the Radio System – confirm staff’s recommendation  Jail Expansion – discussion/direction  Discussion.
Unique Building Maintenance Services Corp. 353 West 39 th St. New York, NY Phone: (212) Fax: (212)
1 The Cost Approach An introduction Wayne Foss, MBA, MAI Wayne Foss Appraisals, Inc.
Review of Plans & Estimating Introduction Architect’s Responsibilities Types of Estimates Factors Affecting Cost Film Project:
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
SCIENCE COMPLEX Infrastructure Committee Presentation November 4, 2009.
Single Family Homes in the Shenandoah Valley Va, Florence Ave Waynesboro, Class Sq.Ft. Zip 244.
Construction Contract Documents
SPORT MANAGEMENT 302 (a) B. FLAHERTY Questions/Comments?? Quiz next week, Chapters 1-6 Complete Chapter 7 “Funding and the Bid Process” Chapter 8 “Constructing.
Historic Rehabilitation Tax Credits Federal Incentives for Preservation.
Author name here for Edited books chapter 6 Facility Construction 6 chapter.
Cindy Miller – Cindy Frey – Ridge Road Rockwall, TX
PROJECT HIGHLIGHTS Energy efficiency is a key feature of the design of Reagan Education Center. The heating, cooling, and electrical lighting systems exceed.
PBSD - Transportation and Maintenance Facility Project Status Report – 1460 Greensburg Road Plum Borough School District Richard Zucco & Michael Brewer.
Transportation Center Rolling Forward Into Phase 2 October, 2008.
Armstrong World Industries Ceiling Tile Recycling Neal McDwyer Recycling Manager Hi I am Anita Snader from Armstrong World Industries, Commercial Ceilings.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Frank c. havens elementary school CONCEPT DESIGN II Refinement of hybrid October 24, 2007 R. P. Gallagher Associates Structural Engineers.
A presentation of The New Georgian Heights Alternative Elementary School for Columbus City Schools Board of Education 2 February 2010.
LOS ALAMOS COUNTY JUDICIAL / POLICE – JAIL COMPLEX 60% SUBMITTAL August 8, 2008.
10/19/20151 Building a Legacy Rebuilding Providence Public Schools 2008 Q1 Report Volume III.
Beyond Estimation TM The Cost Reconciliation Tracker TM Construction Cost Forecast James Vermeulen, PQS, LEED AP – Co CEO Blair Tennant, LEED AP – Project.
Chapter 2 Introduction to Construction Procedures
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
1 P a l o m a r P o m e r a d o H e a l t h A California Health Care District Board of Directors 5/22/07.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Contracting for Commissioning Services A Priority for Facility Owner’s and Program Managers Matt Ferreira, CxA, LEED AP October 14, 2008.
You passed the Bond or secured some funds What do we do now? 2014.
Pay attention as I present pay attention as I present slide layout and content slide layout and content pacing pacing references to book (or not) references.
Update Presentation January 12, 2015 Town of Concord School Bus Transportation and Maintenance Center Town Project Team: Christopher Whelan – Town Manager.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
DT 1320 BIM UNIT 1 INTRO TO ARCHITECTURAL DESIGN AND BIM.
Hillsborough Building & Planning. Green Building 101  Efficiency of buildings and responsible use of water, and construction materials  Reducing building.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
Chapter 3 Facility Design and Construction. Chapter Objectives 1.Describe the process of facility design and construction 2.Demonstrate proficiency in.
District of Columbia Public Schools | 1200 First Street, NE | Washington, DC | T | F | dcps.dc.gov Ron Brown Modernization.
EASTERN MUNICIPAL WATER DISTRICT Public Access Areas Renovation Project – Update Debbie Hoffman, PE Civil Engineer II March 23,
Introduction to Energy Efficient Design
Children’s Section of the Library Entrance lobby from Main Street looking east.
BLAKELY  Welcome.
Fun Facts: James M. Bennett High School
How Completed Interiors Are Achieved: Designing & Building
(Refer to Chapter 2 of the textbook)
Multistory Office Building
Assembling a Project Budget
Multistory Office Building
4 November 2013 LEHIGHTON AREA SCHOOL DISTRICT.
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
How to Build a Great Team
HARWICH FIRE STATION 2 Board of Selectman Presentation 11/06/2017.
How & When to Get Permits for Work in Your Home
2007 Bond Issue Capital Improvement Program
10 The Cost Approach—Part I: Reproduction/Replacement Cost
House Construction Budget Plan
San Diego Housing Commission Final Bond Authorization for West Park
Presentation transcript:

MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL

Team Introductions A presentation for MARIETTA CITY COUNCIL2 Program Manager: Architect: Project and Construction Services, Inc. Sr. Vice President: Kevin Green M+A Architects PA/PM: Ryan Ware, AIA

Project Timeline PROJECT HISTORY TIMELINE: April 2009: –PCS Hired by Court July 2009: –M+A Hired By Court 7/2/09 - 8/31/09: –Programming & Schematic Design Phase 8/31/ /14/09: –SD Redesign/ Value Engineering Phase 10/14/09 - 1/5/10: –HVAC Systems Review/ Energy Modeling 1/5/10: –HVAC approval 1/5/10 - 2/1/10: –Design Development Phase 2/1/10 - 2/26/10: –DD Value Engineering Phase 2/1/10 - Present: –HVAC System Deliberation 3/3/10: –Design Development Estimate presentation to Council A presentation for MARIETTA CITY COUNCIL3

Project Timeline REMAINING PROJECT ACTIVITIES SCHEDULE: 3/15/10: –Approval to move forward with Construction Documents 3/15/10- 4/15/10: –Construction Document Phase 4/16/10 – 4/28/10: –Quality Assurance & Constructability Reviews by PCS and A/E team 4/29/10 – 5/20/10: –Bidding Period 5/21/10 – 5/28/10: –Bid Evaluation & Award Contracts 6/1/10 - 3/31/11: –Building Construction 4/15/11 - 5/15/11: –Finalize Site Work A presentation for MARIETTA CITY COUNCIL4

Project Considerations KEY DESIGN CONSIDERATIONS: FLOODPLAIN: –Dry vs. Wet Floodproofing SOILS CONDITION: –Deep foundations vs. Standard footings COURT SECURITY: –Passive vs. Active ACCESSIBILTY: –Site & Building A presentation for MARIETTA CITY COUNCIL5

Design Site Plan A presentation for MARIETTA CITY COUNCIL6

Design A presentation for MARIETTA CITY COUNCIL7 Ground Floor Plan

Design A presentation for MARIETTA CITY COUNCIL8 Second Floor Plan

Design A presentation for MARIETTA CITY COUNCIL9 Interior Perspectives

Design A presentation for MARIETTA CITY COUNCIL10 Interior Perspectives

Design A presentation for MARIETTA CITY COUNCIL11 West Elevation

Design A presentation for MARIETTA CITY COUNCIL12 South Elevations

Design A presentation for MARIETTA CITY COUNCIL13

Design A presentation for MARIETTA CITY COUNCIL14

Sustainability A presentation for MARIETTA CITY COUNCIL15 Designed with Sustainable Principles in Mind: LEED Certified Level Achievable –Sustainable Site, Brownfield Redevelopment –Alternative Transportation Available –Water Efficient Plumbing Fixtures –More Efficient HVAC System –Recycled Content for Interior Finishes –Lighting Controls, Occupancy Sensors –Thermal Control, Direct Digital Controls (DDC) –Potential For Green Power, Photovoltaic Panels on Roof

Project Cost Estimate By: Date of Estimate: Proposed Square Footage: Total Probable Cost of Construction **: Project Soft Costs***: Total Project Cost: A presentation for MARIETTA CITY COUNCIL16 Miller Lecky 4/21/08 23,170 SF $ 3,397,951 $ 429,689 $ 3,827,640 PCS/ M+A 8/31/09 20,568 SF $ 3,882,929 $ 852,217 $ 4,735,146 PCS/ M+A 10/14/09 18,256 SF* $ 3,537,076 $ 838,383 $ 4,375,459 PCS/ M+A 2/26/09 17,770 SF* $ 3,282,740 $ 858,210 $ 4,140,950 * These SF do not include 3,490 SF of the existing building Lobby and Mech/Storage areas. These spaces are approx. 8’ below BFE (Base Flood Elevation) and cannot be occupied by the court without Dry Floodproofing. ** Total Probable Cost of Construction is all costs included in the trade contracts required for the construction of the facility. *** Project Soft Costs are all costs that are outside of the trade contracts (IE: Furniture, Phones, Computers, Soil Testing, Surveys, Fees, Permits, Hazardous Material Abatements, A/E Fees, Project PM, Project Contingency, Cleaning and Move in.) PROJECT COST HISTORY: PCS/ M+A 2/5/09 17,770 SF* $ 3,827,052 $ 849,982 $ 4,677,034

Project Cost Site Work and Demolition Selective Demolition Excavation and Foundation Structural Systems Exterior Wall, Door and Glass Systems Thermal and Moisture Protection Systems Rough Carpentry and Misc. Metals Interior Wall, Door and Glass Systems Floor, Wall and Ceiling Finishes Fixed Equipment and Specialties Conveying Systems Plumbing Fire Protection (Limited Area) H.V.A.C Electrical Tele/Data/Security Subtotal All Trades General Conditions Contractor Overhead and Profit Bond Escalate to Midpoint Contingency: Design/ Estimating/ Market Conditions TOTAL PROBABLE CONSTRUCION COSTS: A presentation for MARIETTA CITY COUNCIL17 $ 106,412 $ 64,915 $ 114,135 $ 142,560 $ 340,148 $ 131,142 $ 43,728 $ 333,955 $ 211,185 $ 149,971 $ 140,000 $ 150,032 $ 15,085 $ 360,708 $ 565,002 $ 77,400 $2,946,378 $ 147,319 $ 92,811 $ 31,865 $ 0 $ 64,367 $3,282,740 2/26/10 ESTIMATE CONSTRUCTION COST Construction Contingency A/E Fees P.M. (Owner’s Representative) Materials & Soils Testing Sewer and Tap Fees, Permits, Etc. FF&E Computers, Software, Telephones, Misc. Security Legal Fees, Bond Counsel, Owner’s risk Insurance Owner Costs for Final Cleaning and Move-in Hazardous Material Abatements Total Project Soft Costs TOTAL PROBABLE PROJECT COSTS: $ 131,310 $ 260,000 $ 188,900 $ 10,000 $ 13,000 $ 185,000 $ 55,000 $ $ 5,000 $ 10,000 $ 858,210 $4,140,950 SOFT COST

Project Cost Value Engineering Efforts: –24% Reduction from programmed Square Footage –Numerous Floor plan and Exterior Elevation Studies –Foundation System Selection –Security Systems –HVAC System –Limited Area Sprinkler System and Fire Separations –Add Alternate options Manufacturing Equals: –Project Specifications will list multiple manufacturers to allow for competitive bidding Alternates: –Replacement of existing casement windows –R-30 roof insulation in lieu of R-20 (R-20 is Code min. in Marietta) –Dumpster enclosure screen wall –Sallyport fencing in secured parking area –Relocation of existing flag pole –Copper wire in lieu of Aluminum wiring –Standard circuit wiring in lieu of MC Cable –RTU Screening A presentation for MARIETTA CITY COUNCIL18

What If, Project Cost All Costs are based on the Project’s Current Design and Building SF. Historical Costs were calculated using the 2010 Means Construction Cost Indexes Historical Data and Engineering News Record’s Building Cost Index. Future Costs were calculated by using estimated cost now and assuming a 3.5-4% yearly inflation rate. A presentation for MARIETTA CITY COUNCIL19 Estimate Cost of Construction: Estimated Soft Costs: Total Probable Project Cost: 10 years ago 2000 $2,200,000 – 2,400,000 $550,000 – 600,000 $2,750,000 – 3,000,000 5 years ago 2000 $2,700,000 – 2,800,000 $700,000 – 750,000 $3,400,000 – 3,550,000 Now 2010 $3,282,740 $858,210 $4,140,950 5 years future 2015 $3,800,000 – 4,000,000 $950,000 – 1,000,000 $4,750,000 – 5,000,000

Question/ Answers A presentation for MARIETTA CITY COUNCIL20