When DC professionals collaborate…. The daily miracle of Internet Connectivity.

Slides:



Advertisements
Similar presentations
IBM SMB Software Group ® ibm.com/software/smb Maintain Hardware Platform Health An IT Services Management Infrastructure Solution.
Advertisements

Sustainability Implementing Sustainable Practices for Productivity Enhancement for Productivity Enhancement Presented by Ryte Byte, Inc.
Team 1: Aaron, Austin, Dan, Don, Glenn, Mike, Patrick.
Predictor of Customer Perceived Software Quality By Haroon Malik.
Key Considerations for Report Generation & Customization Richard Wzorek Director, Production IT Confidential © Almac Group 2012.
MCTS GUIDE TO MICROSOFT WINDOWS 7 Chapter 10 Performance Tuning.
Network Design and Implementation
Proficy* Maintenance Gateway Close-the-loop Between Your Plant Floor and Plant Maintenance Systems.
1 IS112 – Chapter 1 Notes Computer Organization and Programming Professor Catherine Dwyer Fall 2005.
Library Automation and Digital Libraries Class #5 LBSC 690 Information Technology.
Copyright © 2015 John, Wiley & Sons, Inc. All rights reserved FitzGerald ● Dennis ● Durcikova Prepared by Taylor M. Wells: College of Business Administration,
Laboratory Management - 1
Maintaining and Updating Windows Server 2008
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Data Center & IT Monitoring Use Cases Regional Seminar Series Carolyn.
1 © 2006 OSIsoft, Inc. – Company Confidential Enterprise Agreement (EA) Offering And Benefits May 2007 Value Now, Value Over Time.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Network Operations & Administration Rick Finnegan April 22, 2008.
TIMKEN Bearing Diagnostics and Prognostics Using PI Reducing Unplanned Downtime Rich Browner - Program Manager Reliability Solutions The Timken Company,
© 2008 OSIsoft, Inc. | Company Confidential Panel : Business Value to the Enterprise of the PI System Real-time Infrastructure Moderator: Dr. Gretchen.
Computerised Maintenance Management Systems
Presented by INTRUSION DETECTION SYSYTEM. CONTENT Basically this presentation contains, What is TripWire? How does TripWire work? Where is TripWire used?
1 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Reaching across boundaries, collaboration, Web Parts, and Notifications.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Network Infrastructure Upgrades Rick Finnegan April 22, 2008.
Operational Excellence at Roche: PI Delivers Robert Fretz F. Hoffmann-La Roche Ltd. Basel, Switzerland.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Production visibility: KPI’s in Real-time BASF – The Chemical Company
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
MCTS Guide to Microsoft Windows Vista Chapter 11 Performance Tuning.
MCTS Guide to Microsoft Windows 7
Current Job Components Information Technology Department Network Systems Administration Telecommunications Database Design and Administration.
Natick Public Schools Technology Presentation February 6, 2006 Dennis Roche, CISA Director of Technology.
Software Quality Assurance Activities
Information Systems Chapter 10 – Computers: Understanding Technology, 3 rd edition 1November 13, 2008.
1. There are different assistant software tools and methods that help in managing the network in different things such as: 1. Special management programs.
© 2009 IBM Corporation Let’s Build a Smarter Planet Thongchai Watanasoponwong – Country Manager Power Systems, STG September 15 th, 2009 Green IT เทคโนโลยีสีเขียวเพื่อสิ่งแวดล้อม.
Asset & Security Management Chapter 9. IT Asset Management (ITAM) Is the process of tracking information about technology assets through the entire asset.
SMART GRID The Next Generation Electric Grid Kunkerati Lublertlop 11/30/2011 Electrical Engineering Department Southern Taiwan University.
PATCH MANAGEMENT: Issues and Practical Solutions Presented by: ISSA Vancouver Chapter March 4, 2004.
VoIP Implementation Pitt County Government September 13, 2004.
Quality Control Project Management Unit Credit Value : 4 Essential
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 4 1 Chapter 4: Basics of Preventive Maintenance and Troubleshooting IT.
2 Systems Architecture, Fifth Edition Chapter Goals Describe the activities of information systems professionals Describe the technical knowledge of computer.
SCSC 311 Information Systems: hardware and software.
Cloud Computing Characteristics A service provided by large internet-based specialised data centres that offers storage, processing and computer resources.
Time lag between discovering issue and resolving Difficult to find solutions and patches that can help resolve issue Service outages expensive and.
IT Staffing Solutions Presented by MicroAge May 22, 2008.
1 BTEC HNC Systems Support Castle College 2007/8 Systems Analysis Lecture 13 Post-Implementation Training.
IP Connectivity on TELESYNERGY® TANDBERG codecs Aaron Taye Division of Cancer Treatment and Diagnosis National Cancer Institute, USA Contractor, TerpSys.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Network Infrastructure Upgrades Rick Finnegan April 22, 2008.
Increasing Manufacturing Uptime Is Made Easier with RtTech’s Industrial Facilities Application RtDuet, Powered by the Microsoft Azure Cloud MICROSOFT AZURE.
Service Level Agreements Service Level Statements NO YES The process of negotiating and defining the levels of user service (service levels) required.
Our Company What your are Getting If your workstation or laptop has been giving you problems, we can fix it and restore your productivity without adding.
Copyright © 2015 Rockwell Automation, Inc. All Rights Reserved. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. Empowering Smart Machines.
Saad Haj Bakry, PhD, CEng, FIEE 1 Network Management Support Saad Haj Bakry, PhD, CEng, FIEE P RESENTATIONS IN N ETWORK M ANAGEMENT.
PI in a Modern Power Plant – American National Power, Inc. PI User Conference ‘03 Presented by: Brian M. Wood, American National Power, Inc More Uses Than.
Computerised Maintenance Management Systems
Network management Network management refers to the activities, methods, procedures, and tools that pertain to the operation, administration, maintenance,
CERN Campus Network Infrastructure Specificities Jean-Michel Jouanigot Campus Network Leader CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH EUROPEAN LABORATORY.
TRANSITION FROM SCADA TO A CLOUD SOLUTION: MARKETING, DESIGN, RESULTS. D GOLOVACHEV.
© 2014 Level 3 Communications, LLC. All Rights Reserved. Proprietary and Confidential. Simple, End-to-End Performance Management Application Performance.
1 Open Session International Organization for Standardization.
IMPROVED ASSET UTILIZATION Lack of visibility of assets and devices results in low equipment utilization rates, excess equipment purchasing and sometimes.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Engineered Security Systems, Inc. Access Control Systems CCTV Systems Asset Protection Systems Fire Alarm Systems Laptop Protection Systems Burglar Alarm.
Chapter 1 Computer Technology: Your Need to Know
Automotive Use Case Collaborative Monitoring
Implementation of Computer Maintenance Management system - CMMS
Workgroup Technology Partners
The Troubleshooting theory
WPIC Department of Psychiatry Office of Academic Computing
Presentation transcript:

When DC professionals collaborate…. The daily miracle of Internet Connectivity

Value Is Created  Note: All charts courtesy of Fleishman-Hillard and Harris Interactive, and ITU  About the research: Fleishman-Hillard and Harris Interactive interviewed 4,921 internet users in the UK, Germany and France between December 2007 and January The data was quota sampled and then weighted using a bias correction method called Propensity Scoring to ensure a representative sample of internet users across each country.

Collaboration is how people create, share and use information to make decisions and direct actions PI creates collaboration PI and Collaboration

PI Is a Collaboration Infrastructure Management Vendors Technicians and Specialists

 Leading provider of global data center services  Operate data centers in 18 key markets in the U.S. Europe and Asia-Pacific  300+ of the largest networks  9 of the10 largest content sites Equinix at a Glance

Equinix Challenges Power densities increasing: – Intel 45 nm “Penryn” – 30% power savings, but quadcore has 820 M transistors vs. 590 M – still 130 watts Corresponding increase in expense for power/cooling – Facility costs (opex/capex) have grown from 1-3% → 5- 15% of total IT budget (Uptime institute) Green initiatives – voluntary and mandated

Equinix Engineering Objectives Objective: – Be the best in the business in customer service and support Approach: – Staff with highly qualified personnel – Operate centers in a consistent manner – Constantly improve – apply “lessons learned” (to design, construction and operations) Collaboration is essential

Building Collaboration at Equinix Existing SCADA System Equipment Diagnosis – Good Installing new customers – not good Outage notification – not good Management reports – Useless PUE – useless DC Executives weren’t getting performance information DC Managers spent too much time creating spreadsheets DC Engineers wasted time sorting through alarms

Building Collaboration Quickly Equinix Project Scope 1.Establish stable, reliable infrastructure in Phase 1 2.Fix Alarms 3.Build tools that simplify new customer installs (e.g. System always shows power panel with available power) 4.Build tools for monthy summaries) (e.g. Automatically generate monthly energy usage report) 5.Build tools for on-going Maintenance (e.g. Procedure to set control points on cooling system)

Data Center Upgrade Project Tags had errors! Caused by too many software vendors !!!

 Converted 15,000 tags from one data base to PI  Converted 115 screens from HMI to PI  Connected 108 controllers to PI  Re-organized 2000 alarms & notifications Six Person-Weeks Later:

After Installing PI Increased reliability – a lot!  Reduced software manufacturers from 6 to 1 Removed iFix, JCI, Modicon, Applicon, Wonderware, PowerManager  Reduced servers from 2 to 1 Two Scada servers replaced by 1 PI server Multiple single points of failure to none Increased Performance, Capacity More data available to users

The administrator opens the “Data Center Dashboard” to verify the status of all core systems. Nothing is red so all systems appear to be operating fine. Also, there were no calls to the help desk from any other departments. Collaboration Example The moderately high CPU on a Call Manager is probably not the cause of this problem.

Engineer B Discovers the Symptom The Jitter measurement appears to increase to an unacceptable level so a cursor is used to identify the precise time that this occurred. The event occurred at 12pm and corresponds to the time of the reported problem.

Engineer C Analyses the Root Cause Network traffic has not increased proportionally to the number of flows. This is unusual as it means more connections are traversing the network but the network is not transporting more data.

Engineer D Fixes the Problem The connections are identified to originate from several devices, crawling the network. This is a characteristic of the SQL Slammer Worm. The offending machines are reported to IT support for cleaning.

There is no such thing as “too much information”

Plant engineers can now assess situations without becoming computer experts. Replaced “management by spreadsheets” with real-time reports created by users Converted a potentially large and costly IT project into several inexpensive integration projects. What Changed at Equinix?

 Reduced time to detect, repair outages  Reduced time to install new customers  Site Directors plan capacity rather than fill out spreadsheets  Executives manage energy, staffing costs  Plant Operating Engineers are more effective Value to Equinix

What Surprised Us… Easier to justify and purchase Less specification cost Less cost to vendor to learn site specifics- i.e. “on-the-job” training. Many small projects were far more effective and easier to execute than a single big project.

Collaboration You produce it when you organize your information Future Possibilities

Organized Information Real-time Rule Assessment Alert Notification (RtAlerts) Work Order Generation (RLINK) Asset Reliability Improve Reliability Integrated Asset Information (RtWebParts) Asset Information Structure (PI and RDB)

Collaboration is how people create, share and use information to make decisions and direct actions PI creates collaboration Conclusion

We Want to Thank… Data South Systems - Charles Campbell, Founder We converted 115 screens within days using GrITS Ken Morikawa, Systems Engineer Glenn Moffett, Systems Engineer They always made sure we knew what we were talking about

Questions?