Wet Area Linings Part 1 - Linings M. Martin Feb, 2005 Reviewed Feb, 2006 & 2007 M. Martin Feb, 2005 Reviewed Feb, 2006 & 2007.

Slides:



Advertisements
Similar presentations
NGfL CYMRU GCaD FLOOR COVERINGS.
Advertisements

Interior Wall and Ceiling Finish
Interior Wall and Ceiling Finish
Lather Lathers assemble and install the framework for gypsum materials in buildings. These materials include drywall and plaster.
Cutting Metals.
Flat Roofs & Introduction to Gable Roofs
GCSE Graphic Products Health and Safety, Tools and Equipment Summer Examination 2011.
NGfL CYMRU GCaD FLOOR SCREEDING, PLASTERING AND RENDERING.
Breaking and Breaching. Tools Used Sledge hammers –Long and short handled Chisels Pinch point pry bar –“Crow bar” Hacksaw Handsaw Bolt cutter Flat head.
Revision Quiz Click your mouse, read the question, click again to reveal the answer M. S. Martin October 2007.
Wet Area Linings Part 2 Flashing Details M. Martin Feb, 2005 Reviewed Feb, 2006 & 2007 M. Martin Feb, 2005 Reviewed Feb, 2006 & 2007.
Carpentry and Joinery NVQ and Technical Certificate Level 2, 2nd Edition © Pearson Education Limited, Copying permitted for purchasing institution.
Hip & Valley Roofs Note: Main pictures and text (although some re-written) is from the text book “Practical Australian Carpentry” Created by M. S. Martin.
Electrical plant. Traditional wall (Red hollow brick) Plasterboard wall Rapid installation flush mounting solution FINAL EFFECT Traditional wall (Red.
Sawing – An Introduction
Created by Michael Martin 13/9/04 – Reviewed June 2010.
Gable Roof BCGCA3007B. Gable Roof Flush with no eaves Flush with raked eaves Boxed.
Assembly 1 Calculate the amount of steel you will need by using CARD or a length of STRING to make a full scale model of your final solution. MEASURE and.
After the foundations have been completed the walls are set out and construction commences. wall structures.
FC 100% at $11.00 PUT, $.15 FC 10, 15 & 25% at 50 th, 70 th & 90 th %-tile FC 10, 15 & 25% at 50 th, 70 th & 90 th %-tile PLUS an $11.00 $.15.
How to prepared the cross halving joint with basic hand tools
Note: Main pictures and text (although some re-written) is from the text book “Practical Australian Carpentry” Created by M. S. Martin Oct / Reviewed.
Topic C1 Superstructures - walls
Step TaskPart No. to use Time, Minute s Tools to UseLink to Spec. Quality ControlSafety Notes 1Mark out the first and second circle (Part 1 and 2) and.
Making Here is the equipment you will most likely need to complete this unit of work. Although you may want to change these slightly e.g. you may want.
Dry lining.
Dry lining by direct bond – overview
The electricians have first to mark the walls so they know where to cut tracks for the conduit and the joiner fits the stud walls so first fix plumbing.
Flat Roofs & Introduction to Gable Roofs Ref: M. S. Martin / March 2004 / Reviewed & Combined March 2007.
CRC Basic Food Handling CANADIAN ROCKIES CAFÉ. CRC Overview  Hand Washing  Knife Safety  Cleaning and Sanitizing Canadian Rockies - Joe Student.
PLASTERBOARDS Plasterboard is a rigid flat sheet material which comprises of a core of gypsum plaster with the surfaces covered by stout paper. This covering.
Wet Area Linings Part 3 – Flooring & Other Details M. Martin Feb, 2005 Reviewed Feb, 2006 & 2007 M. Martin Feb, 2005 Reviewed Feb, 2006 & 2007.
Definitions & Terminology
Assignment By Ryan Shaw. Tools and Equipment Trowel- used for applying plaster Hawk- used for holding plaster whilst plastering Float- gives good.
Wall Frames 2 M. S. Martin Feb Click mouse to bring in each point or item until complete.
Site practice notes.
How to Build a Divider Wall By Charysse Roberson.
Homework: Use the information that you gathered this week to draw out your plan view working drawing, 1:1 scale. Use sheet 6. Hand in next week. Start.
Gingerbread House Construction Instructions graham crackers 2.Knife 3.Cutting board 4.Hot glue gun 5.Base for house (paper plate)
Power tools Session 4 Power drill Circular saw. Power drills Electric versus cordless.
Problem 3.2. Step One Draw a 4 X 6 rectangle on grid paper and cut it out.
Everything about drywall (lather)
EYEPIECE: 10x BODY/EXTENSION TUBE COARSE ADJUSTMENT FINE ADJUSTMENT
Outcome 2 Requirements for installing sanitary appliances Unit 207: Sanitation.
Unit 6: Building Technology in Construction Learning Outcome Understand the techniques used in the construction of superstructures for low-rise domestic.
Shaping Materials Theory. Knowledge and Understanding.
Learning Outcome Lesson Objective
Electrostatic FEA of the Ground Plane Features Bo Yu Sept. 14, 2015.
How can I find the area and perimeter of a rectangle? MCC.4.MD.3.
Tools. Corded Power Drill These are used to drill larger holes or holes in more substantial materials. You would use this type of drill to drill metal.
Secure Resources – Gyproc Plasterboard Apply Plaster Materials to Internal Backgrounds.
How to build a small inexpensive low-tunnel hoop house
10 Factors That Influence Risk Tolerance
Alterna Tile Replacement
Board Replacement Laminate-Angle/Angle & Lock & Fold
ANSWER SHEET LISTENING (PartⅠ~ Ⅳ) READING (PartⅤ ~ Ⅶ) NO
Interior Wall Coverings
Glasroc H Tilebacker for bathrooms, shower areas
Pritesh h prajapati Arvind g prajapati Arvind m prajapati Arvind khata.
Secure Resources – Gyproc Plasterboard
Glasroc H Tilebacker For bathrooms and shower areas.
Secure resources – gyproc plasterboard
Board Replacement for Engineered Glue-Down Hardwood Floors
Circular Saw Safety By Jessie Vo.
Polynomial Puzzle Adding, Subtracting, & Multiplying Polynomials
Bellringer Feb. 8 Read through the 4 questions on the handout. We will watch a video. I will show it once; you will answer questions. I will show it again;
When all the first fix electrical and plumbing is finished the roofers return to fix the ceiling sheeting in place so the plasterers can arrive on site.
Count on 2 (Over the bridge)
Find the Perimeter.
Turning Between Centres
Presentation transcript:

Wet Area Linings Part 1 - Linings M. Martin Feb, 2005 Reviewed Feb, 2006 & 2007 M. Martin Feb, 2005 Reviewed Feb, 2006 & 2007

Types of lining materials Handout, CSR Fibrous Cement Sheet Wet area plasterboard Hardies ‘tilebacker’ newer product variation of FC sheet

Methods of cutting FC sheet Score & snap knife Hand guillotine Hand saw

Other Methods Hand Guillotine Hand saw

Circular Saw with dust extraction

Forming holes in FC sheet Larger holes Score around perimeter of opening Form large hole in centre Saw cut from hole to corners Support edges & snap away

OH&S Always ensure area is well ventilated Always wear appropriate PPE

Control joints Tiled areas, not more than 4.2m spacings. Non-tiled areas, not more than 7.2m spacings. Based on CSR product

Wall sheet fixing FIG 3. THERMAL BRIDGING ON STEEL FRAMING.

Tiled area fixings In tiled areas what must not be used ??? Copy answer in worksheets If using FC sheet in tiled areas, the use of stud adhesive is NOT acceptable