EXSA’S MATERIALS PLANIFICATION PROCESS. KEY PRINCIPLE SILENCE MEANS CONSENT.

Slides:



Advertisements
Similar presentations
We, at Vispara Technosoft specialize in delivering high quality, flexible, cost effective, reliable, result-oriented applications which can be capitalized.
Advertisements

Restaurant Management System
1 Advanced Planning & Scheduling Presentation. CUSTOMERSCUSTOMERS SUPPLIERSSUPPLIERS PURCHASING PRODUCTION PLANNING CUSTOMER SERVICE FINANCE Acknowledge-
EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
JDEasy EASY.Forecast Applications Overview EASY.FORECAST Applications.
Copyright © 2005 Ubex Corporation Automated Invoice Processing and Enhanced Controls with ERS Pay On Receipt Presented by: NorCal OAUG Uma Mohan March.
Production Planning Devaki Nadkarni Production Planning Annual demand by item and by region Monthly demand for 15 months by product type Monthly demand.
Dependent Inventory: Material Requirements Planning BA 339 Mellie Pullman.
Optimiza Virtual Demonstration
Material Requirements Planning (MRP)
Material Planning Process
Delivery date control Includes Sales lead time Uses on-hand and planned supply Triggers explosion Creates orders or kanbans Fixed administrative.
Sage User Network February Rixonway Kitchens Company was founded in 1978 Employs 500 staff £35 million turnover Private equity backed due to MBO.
BSIT 4106 Airline Travel System 11 – A.  The goal of the study is to develop an automated procurement and inventory system  The system will focused.
© Prentice Hall, 2005: Enterprise Resource Planning, 1 st Edition by Mary Sumner 6-1 Enterprise Resource Planning, 1 st Edition by Mary Sumner Chapter.
SAP Supplier Management EIN 5346, Logistics Engineering Spring 2010.
Experts in e xtending Oracle e -Business Suite e nrich IT 1/16/2004VMI1 Vendor Managed Inventory (VMI) Presenter: Arul Murugan, CPIM.
Managing stock usage Stock rotation = method of organising stocks so the oldest supplies are used first. Computer-based stock control EPOS (Electronic.
[Insert Client Logo]. [Insert Title] This content is protected by [TV Station] unless written consent is provided.
Material Requirements Planning (MRP) Computer-based information system for ordering and scheduling of dependent-demand inventories, i.e. what is needed,
MATERIAL REQUIREMENT PLANNING
Subjects: Traceability / Pocess Control / Inspection
Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013.
Objectives After completing this chapter, you will be able to:
Operations Management Material Requirements Planning
MRP Systems MRP – Material Requirements Planning Commonly used method in industry to coordinate the production scheduling of end items and their associated.
Distribution Requirements Planning Logistics Workshop Asia 2004 Phnom Penh, Cambodia 10 – 14 May 2004.
Sinha and Kotzab: Supply Chain Management, Copyright © 2012 by Tata McGraw-Hill Education CHAPTER 8 Production Planning and Scheduling.
SUMMARY OF THE IG DISCUSSION PAPER ON THE BALANCING IN THE BALTICS Aistija Zubaviciute, NCC Baltic Electricity Market Mini-Forum 23rd November 2006, Vilnius.
The sales order and purchasing processes MIS2101: Management Information Systems Based on material developed by C.J. Marselis.
Ganda ERP Project | 0 CFC ERP Cut-off Strategy & Go-Live Preparation 1 June 2015.
Supply. NOTES 11/5 The amount of a product that would be offered for sale at all possible prices SUPPLY.
Инвестиционный паспорт Муниципального образования «Целинский район»
Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
(x – 8) (x + 8) = 0 x – 8 = 0 x + 8 = x = 8 x = (x + 5) (x + 2) = 0 x + 5 = 0 x + 2 = x = - 5 x = - 2.
Ganda ERP Project | 0 CFC ERP Cut-off Strategy 31 December 2014.
Key Economic Principles of Free Enterprise Ms. Cichon.
Transportation Planning EIN 5346 Enterprise Systems Optimization Fall, 2015.
Supply Constance Wehner. The Law of Supply Firms will generally produce and offer for sale more of their product at a high price than at a low price.
ТBМ-Logicon Logistic and Information Integration with Suppliers.
Concepts in Enterprise Resource Planning Third Edition Chapter Four Production and Supply Chain Management Information Systems.
Enterprise resource planning (ERP)
Production Planning and Control
Transportation Planning EIN 5346 Enterprise Systems Optimization Fall, 2015.
Manufacturing Systems Engineering
A. A general rise in prices. 1. When prices rise, a person’s ability to buy goods and services goes down, which decreases purchasing power.
Costs by Category  Purchasing hardware  Purchasing software  Purchasing computerized delivery system  Adding bar codes to holdings  Moving costs 
6-1 Manufacturing Systems ERP Background Designed to re-order inventory using re-order point –Adapts production to customer orders –Increased flexibility,
照片档案整理 一、照片档案的含义 二、照片档案的归档范围 三、 卷内照片的分类、组卷、排序与编号 四、填写照片档案说明 五、照片档案编目及封面、备考填写 六、数码照片整理方法 七、照片档案的保管与保护.
공무원연금관리공단 광주지부 공무원대부등 공적연금 연계제도 공무원연금관리공단 광주지부. 공적연금 연계제도 국민연금과 직역연금 ( 공무원 / 사학 / 군인 / 별정우체국 ) 간의 연계가 이루어지지 않고 있 어 공적연금의 사각지대가 발생해 노후생활안정 달성 미흡 연계제도 시행전.
Жюль Верн ( ). Я мальчиком мечтал, читая Жюля Верна, Что тени вымысла плоть обретут для нас; Что поплывет судно громадней «Грейт Истерна»; Что.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
MRP (Material Requirement Planning) The main function of material requirements planning is to ensure material availability on time. MRP helps monitor the.
Benefits Get complete real-time visibility of demand, supply, costs and trends Web access allows users in different locations to log in Eliminate manual.
www. magnifictraining.com Oracle apps scm online training Online | Classroom | Corporate| Training | Certification | Placement.
4.00 Understand business operations management.
Material Requirements Planning (MRP)
4.00 Understand business operations management.
About Xperdyte Xperdyte, the software solution tailor-made for the South African Manufacturer. This comprehensive solution addresses all the critical.
..,../' CJ " · "' ; '..
Supplier Performance Measurement
exsa’S MATERIALS PLANIFICATION PROCESS
Table 4.1.
-­,-­, '.-.- ·'·' '·..'·..... '-.: - - (p - C!J " 1.,.c_.. If ( '.. ' " ' ' " ' I.
Ex.1   You have been provided the following information:
PURCHASING NOW AND FOREVER
PURCHASE MANAGEMNET.
Cont’ of setting the right stock levels.
4.00 Understand business operations management.
Value Source Diagrams: AXELOS, ITIL Foundation ITIL 4 Edition (2019)
Presentation transcript:

EXSA’S MATERIALS PLANIFICATION PROCESS

KEY PRINCIPLE SILENCE MEANS CONSENT

New Products Demand review Demand plan Offer review Plans and offer restrictions Conciliación meeting Plans and alternatives valued Material’s review meeting P.I.N. Integrated business plan 3rd workday of the month 5th workday of the month 11th work day of the month 15th workday of the month 16th work day of the month 18th workday of the month INTEGRATED BUSINESS PLANIFICATION PROCESS

MATERIAL’S PLANIFICATION PROCESS Material Production Schedule cofirmation (MPS) MRP’s run, review and adjustment Creation & sending Purchase Orders Generation y sending the Supplier’s Program Follow up the entry of materials

MRP’S RUN, REVIEW AND ADJUSTMENT MPS BOM Material needs

MATERIAL’S PLANIFICATION PROCESS Material Production Schedule cofirmation (MPS) MRP’s run, review and adjustment Creation & sending Purchase Orders Generation y sending the Supplier’s Program Follow up the entry of materials

SUPPLIER’S PROGRAM OF IMPORTED MATERIALS NEGOTIATION ZONEFREE ZONEFIRM ZONE

MATERIAL’S PLANIFICATION PROCESS Material Production Schedule cofirmation (MPS) MRP’s run, review and adjustment Creation & sending Purchase Orders Generation y sending the Supplier’s Program Follow up the entry of materials

SERVICE METRICS - OTIF Quantity Quality Date SocietyMeasurementdec-12ene-13Total EX10(1) N° of positions scheduled for delivery15152 EX10(2) N° of positions delivered15152 EX10(3) N° of positions with the required quality delivered14849 EX10(4) N° of positions completes with required quality delivered14849 EX10 (5) N° of positions on time, completes and with the required quality delivered14849 EX10(6) Average days of delay EX10(7) OTIF %100%94% Goal: 99%

THANK YOU

PROGRAMA DE PROVEEDORES DE MATERIALES NACIONALES CentroMaterialDescripción Denom. clase doc. Stock Ingr. Ret. Miér.Juev.Vier.Lune.Mart.Miér.Juev.Vier.Sem1Sem2Sem CJ 31,5x31,5x61,5 cm DET ENSAMBLADO OrdPrv1, , CentroMaterialDescripción Denom. clase doc. Sem4Sem5Sem6MayoJunioJulioAgosSeptOctNovDicEneroFebr CJ 31,5x31,5x61,5 cm DET ENSAMBLADO OrdPrv