1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

Slides:



Advertisements
Similar presentations
Planning and Development Committee West Corridor Update May 10, 2007.
Advertisements

MnDOT 2007 Pilots n Mixture Sampling Modification –Increase randomness of sampling. »Sample is split in the field and stored in containers labeled with.
Construction Materials
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
ASPHALT PRICE ADJUSTMENT PRICE ESCALATION IN THE 21 ST CENTURY.
Installation of Loops on resurfacing projects through maintenance Ted Swansegar
Paving Potpourri 2015 Spec Changes and More! Bob Dyer Assistant State Construction Engineer WAPA Joint Training March 2015 Lynn Peterson Secretary of Transportation.
DIVISION 5 SUBCOMMITTEE OCT 2014 Update. The Washington Chapter is one of 67 local chapters in the US and Canada which make up the American Public Works.
Section Cross Slope District 1 Your logo here.
Asphalt Specification Changes July 2005 Contractor Asphalt Training Rich Hewitt, PE District Bituminous Engineer District Five Materials & Research.
Recycled Asphalt Program & Environmental Stewardship Program (Post Consumer Content) Robert C. Rea Nebraska Department of Roads WASHTO – Omaha, Nebraska.
2014 AAPA Conference March 11-12, 2014 Curtis Vincent, P.E. Construction Engineer Lyndi Davis Blackburn, P.E. Assistant Materials and Tests Engineer Specification.
City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University.
Uniform Paving Platform Regional Asphalt Seminar, Blacksburg, VA March 12, 2015 David P. Shiells, P.E. District Materials Engineer.
Pavement Performance Specifications Research.
Construction of LLP HMA Pavements Pre-bid Meeting Solano 80; 04-4A0104 District 4 Oakland, CA September 14, 2012 Bob Humer.
CONSTRUCTION & FINAL ESTIMATES ISSUES. Final Estimates Issues  Prep & Doc Manual-Updates  Review & Admin Manual-Updates  Other Final Estimates Issues.
Bituminous Street Recertification Initiatives. Initiative Items n Stone Matrix Asphalt (SMA) n Longitudinal Joint Spec and other methods for longitudinal.
MICHIGAN RIDES ON US 2015 Local Roads Workshop Gaylord March 12, 2015.
1 Quality Control Program. 2 Objectives To know: To know: –How the QC Program is Doing –Effect of Specification Changes on the QC Program –Contractor.
Drum Plants Construction1 HMA Production Senior/Graduate HMA Course.
Asphalt Rubber Related Specifications Arizona Department of Transportation.
1 Construction Cost Impacts Florida DOT Experience Greg Davis State Estimates Engineer Florida Department of Transportation Greg Davis State Estimates.
2015 APAM Conference Hot Mix Asphalt (HMA) Update Kevin Kennedy HMA Operations Engineer Michigan Department of Transportation
1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State.
Warm Mix Asphalt Yellowstone National Park Brad Neitzke Western Federal Lands Highway Division.
Warm Mix for a Cold Climate Colorado DOT’s 2007 WMA Project.
 Embankment Construction – LOTs  What is the maximum length of a LOT? Mainline pavement lanes, turn lanes, ramps, parking lots, concrete box.
PAVEMENT CONDITION INDEX
Welcome to the Eastern Region Laboratory Procedures Manual ERLPM
1 Overview CQC Asphalt Specifications.  Payment based on Contractor’s Quality Control tests.  FDOT runs verification tests at a lesser frequency. 
Asphalt Quality Assurance Program
VALUE ADDED FEATURES Who’s Excited??? 2015 Construction Academy Larry Ritchie July 28 th, 2015.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
1 August 12, 2014 Surety Risk Assessment Utility Pipeline Failure Case History – Tyndall, SD Presented by: American Concrete Pipe Association Scott Hofer.
Florida Department of Transportation 1 Overview of CQC Asphalt Specifications.
Asphalt QC 2000 The Adventure Begins….. Topics Terminology Specifications Sampling and Testing Reporting/CQR Who Does What? Lube & Oil Change All in 20.
Porous Asphalt The Specs Tim Horton, Skillings Connolly Jessica Knickerbocker, City of Tacoma Mark A. Palmer, P.E., LEED AP, City Engineer, City of Puyallup.
Overview of the New Hot Mix Specifications Dale A. Rand, P.E. TxDOT Construction Division Flexible Pavements Branch TRB AFK10 Committee Meeting April 20-21,
Pavement Performance Specifications Research.
Allen Hughes State Materials Office
Working Successfully With Property Managers: An Interactive Engagement
 Have an approved mix design before paving.  The department has eliminated the use of PG -22 Asphaltic Material and replaced it with PG -28.  Tack.
Asphalt Roadway Daily Report of Quality Control (Form No ) A step by step guide.
Topic1b: Project Life Cycle
2014 NCR Construction Conference Materials Presentation John Brophy Jeff Michalski
Office of Traffic, Safety and Technology Module 5 Work Zone Plan Sets Module 5 Work Zone Plan Sets Traffic Control Plan Development Course.
Go CATS!!!. KAHC-KYTC Joint Meeting March )Construction Information on Web 2)Formal Acceptances 3)Final Pay Estimates 3\16\07.
REVISED May 2009STATE MATERIALS OFFICE Goals in this Session To understand:  The Sampling & Testing process  The Project Certification process  The.
Addressing Localized Roughness at the Project Level by Gary Higgins.
Ultra Thin Friction Course May 2007 Alex Weideman Product Technical Manager Holcim Aggregate (Gauteng)
Paving the way for over 60 years Presentation at the January 10, 2007 NCAUPG Technical Conference By Dusty Ordorff Bituminous Roadways, Inc.
3 - 1 Holding The Contractor to 105% of the Target Spread Rate!
Stacy Hagenbucher.  Process Improvements  Clarification  Trends  Finals Tracking  Trends  Why Missing Dates  Additional Resource  Issues on sites.
Trenton M. Clark, P.E. Director of Engineering Virginia Asphalt Association.
WEDGEWOOD COVE HOA STREET PAVING/RESURFACING PROJECT.
Table Discussions 2015 SE Meeting. Scenario #1-Project Completion A $1 million bridge replacement project has a completion date of August 1 th. This date.
Spreadsheet Applications for Construction Cost Estimating BY CHARLES NICKEL, P.E. (225)
Nilesh Surti, PE NCDOT State Pavement Construction Engineer.
Asphalt Paving Technical Committee (APT) Proposed revisions to the Asphalt Concrete Sections of the MAG Specifications.
Quantity Calculations Module 3. Quantity Calculations  Specifications  Post Bid Quantity Calculations  Production Quantity Calculations –Checking Yield.
Alabama Asphalt Pavement Association
Florida APT Update.
Asphalt Pavement Training Conference “HMA Mix Designs on the QPL”
David P. Shiells, P.E. District Materials Engineer
Materials & Research Winter Workshop
Panel discussion Date.
High Value Research Sweet 16 – RAC Region 3
Value Engineering In Design
Superpave5 Superpave Design at Five Percent Air Voids
Presentation transcript:

1 Final Estimates and Asphalt Reports

2 Setting Spread Rate For Asphalt Base

3 Setting Spread Rate For Asphalt Super-pave Concrete

4 Setting Spread Rate For Asphalt Concrete Friction Course

5

6

7 Roadway Target Spread Rate  The Target for Traffic Level D, Design Mix SP , Coarse SP-9.5 with a gmm of  43.3 lbs./SY x = Lbs/SY/in.  Lbs/ in. x 1.5” = lbs./SY or a target of 152 lbs./SY  +/- 5%  Minimum = lbs/SY  Maximum = lbs/SY

8 Asphalt Road Reports

9

10 Target Spread Rate Set

11

12 Asphalt Road Report Header

13

14

15

16

17

18

Minimum Process Control Testing Requirements  5. Monitor the mix spread rate at the beginning of each day’s production, and as needed to control the operations, at a minimum of once per 200 tons (200 metric tons) placed to ensure that the spread rate is within 5% of the target spread rate. When determining the spread rate, use an average of five truckloads of mix.  If the Contractor fails to maintain the construction process in accordance with the approved Quality Control Plan, the Engineer may elect to stop the construction operation at any time until the deficiencies are corrected.

20

21 Target and Actual Spread Rate

22

23 Paving Completed

24 Pay Is Limited To 105% Of Set Spread Rate

25

26 Lot Density

27 How the Quantities of Density and Non-Density Tons Affect the Composite Pay Factor (CPF)

28

29

30

31

32

33

34

35

36

37

38

39 Plant Reports

40

41

42 Lot Submittal Package