Robert D. Walla, Larry A. Hacker, Ph.D. Astrix Technology Group 1090 King Georges Post Rd Edison, NJ 08837 LIMS Selection In A Forensic Toxicology Laboratory.

Slides:



Advertisements
Similar presentations
Roadmap for Sourcing Decision Review Board (DRB)
Advertisements

State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
Systems Analysis and Design in a Changing World
Chapter 8: Evaluating Alternatives for Requirements, Environment, and Implementation.
Technology As A Sales Tool: How Organizations Use Electronic Notebooks To Retain Customers And Increase Sales Robert D. Walla, Michael S. Zachowski, Richard.
© Prentice Hall CHAPTER 10 Alternative Approach: Purchasing Systems.
ATTENTION This presentation breaks down the purchasing process into 6 steps, which are then detailed in the subsequent slides. While responding from either.
1 New York. West Palm Beach. Boston. Philadelphia. Kansas City. Los Angeles Selecting The Proper LIMS A Systematic Approach To.
© 2007 COPLAN AND COMPANY. All Rights Reserved. Permission granted for use by HIMSS membership. 1 Procurement Management Scott R. Coplan, PMP Educational.
Panorama Consulting Group LLC ERP Assessment, Selection, and Planning SAMPLE APPROACH.
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Fundamentals of Information Systems, Second Edition
Astrix Technology Group Extending The LIMS To Benefit External Stakeholder Groups Robert D. Walla Presented At Pittcon 2006 Orlando, FL.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
8 Systems Analysis and Design in a Changing World, Fifth Edition.
Chapter 4: Beginning the Analysis: Investigating System Requirements
13.1 © 2007 by Prentice Hall 13 Chapter Building Systems.
System Engineering Instructor: Dr. Jerry Gao. System Engineering Jerry Gao, Ph.D. Jan System Engineering Hierarchy - System Modeling - Information.
Michael S. Zachowski, Robert D. Walla Astrix Technology Group 1090 King Georges Post Rd Edison, NJ A Successful Approach to a LIMS Upgrade In A Public.
4 4 By: A. Shukr, M. Alnouri. Many new project managers have trouble looking at the “big picture” and want to focus on too many details. Project managers.
The Use Of Electronic Laboratory Notebooks To Automate Manual Data Collection Processes Robert D. Walla Presented At PITTCON 2003 Orlando, FL Astrix Technology.
Request For Proposal Barbara Antuna Ronald Healy Chad Hodge Andrew James Mel Ocampo.
® IBM Software Group © 2006 IBM Corporation PRJ480 Mastering the Management of Iterative Development v2 Module 3: Phase Management - Inception.
Chapter 4: Beginning the Analysis: Investigating System Requirements
Effective Methods for Software and Systems Integration
Chapter 14: Redesigning the Organization with Information Systems Instructor: Kevin Brabazon.
Web Development Process Description
RUP Requirements RUP Artifacts and Deliverables
© VESP International Pty Limited To Contents Slide CLICK to advance slides/ bullet points within slides Integrated Master Planner An Overview.
Laboratory System Integration: The Evolution Of LIMS Michael S. Zachowski, Robert D. Walla, Richard P. Albert Astrix Technology Group 175 May Street Edison,
1 Our Expertise and Commitment – Driving your Success An Introduction to Transformation Offering November 18, 2013 Offices in Boston, New York and Northern.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
Installation and Maintenance of Health IT Systems
Chapter 2 Process: A Generic View
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Presented by: Masoud Shams Ahmadi February 2007 Enterprise Resource Planning (ERP) Selection Presented by: Masoud Shams Ahmadi
1 This Presentation is printed on recycled materials.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Project management Topic 4 Starting up a project.
Project Management Project Integration Management Minder Chen, Ph.D. CSU Channel Islands
Chapter 12 The Network Development Life Cycle
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
Chapter 4 HRIS Needs Analysis.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Accounting systems design & evaluation 9434SB 18 March 2002.
4 Chapter 4: Beginning the Analysis: Investigating System Requirements Systems Analysis and Design in a Changing World, 3 rd Edition.
ITEC 275 Computer Networks – Switching, Routing, and WANs
Systems Analysis and Design in a Changing World, Fifth Edition
Chapter 8 Environments, Alternatives, and Decisions.
Fundamentals of Information Systems, Sixth Edition
IEEE Std 1074: Standard for Software Lifecycle
Development Projects / Analysis Projects / On-site Service Projects
Systems Analysis – ITEC 3155 Evaluating Alternatives for Requirements, Environment, and Implementation.
Astrix Technology Group
2 Selecting a Healthcare Information System.
Process Improvement With Roles and Responsibilities explained
Chapter 1 (pages 4-9); Overview of SDLC
CLINICAL INFORMATION SYSTEM
Systems Analysis and Design
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
MANAGING THE DEVELOPMENT AND PURCHASE OF INFORMATION SYSTEMS
Selecting a Health Care
Chapter 13 Building Systems.
Presentation transcript:

Robert D. Walla, Larry A. Hacker, Ph.D. Astrix Technology Group 1090 King Georges Post Rd Edison, NJ LIMS Selection In A Forensic Toxicology Laboratory

Abstract Commercial Laboratory Information Management Systems (LIMS) have proven themselves as valuable information technology tools to the Analytical Laboratory Manager. There are over a hundred LIMS products commercially available. Many of these systems are capable of serving in a wide variety of laboratory environments while others are focused on a specific market such as forensic laboratories. The selection and implementation of the correct LIMS product is a crucial decision in order to obtain the quality and efficiency gains offered by implementing this technology. Unfortunately, the selection of a LIMS product is not always based on laboratory requirements but rather sales demonstrations or a cursory review of its functionality. This results in organization selecting the wrong LIMS that then requires extensive effort and resources to customize and implement. LIMS projects of this nature result in cost and schedule overruns or even cancellation of the project.

Abstract Undertaking a Laboratory Information Management System (LIMS) upgrade takes considerable resources that are often underestimated by the client. In addition to the obvious license and support costs, most commercial off the shelf (COTS) products will require customization and/or configuration to meet a client’s specific requirements and work flows. If these are not documented and compared to the base functionality of the COTS LIMS prior to the installation, it is unlikely that adequate resources will be allocated and the project will fall short of its objectives.

Forensic LIMS Upgrade Project Objectives Project Objectives  Purchase Of a COTS LIMS  Support Both The Law Enforcement Division and Post Mortem Division  Integration Of Analytical Instruments  Interface With Existing Data Systems o Medical Examiners Database o Billing System

Stakeholder Groups  Laboratory Stakeholders o Sample Receiving o Sample Preparation o HPLC Lab o Mass Spectrometry o Color Testing Laboratory o Headspace Laboratory o Screening

Stakeholder Groups  Non-Laboratory Stakeholders o Quality Assurance o Information Technology o Lab Management o Data Group o Law Enforcement o Medical Examiners o Finance

“Implementing An Information Management System In A Laboratory Is Like Changing The Tires On A Car Traveling 100 mph” — Author Unknown

LIMS Risk Components  60% of IT Projects Are Cancelled Prior To Implementation  Many Systems Never Get Implemented Due To Functional, Time and Budget Constraints  Customization And Integration Requirements Underestimated  Unrealistic Schedule And Budget Estimates  Risk Management Plan Not Well Established  No Formal Process In Place to Select and Implement LIMS

Astrix Technology Process Approach  Business Case Preparation  Collect and Organize User Requirements  Development of Functional Specification  Request For Proposal  Evaluation of Vendor Responses (GAP Analysis)  Configuration/Customization/Integration  Validation And Testing  Life Cycle Planning and Maintenance

 Onsite Requirements Meetings  Include All Stakeholder Groups  User Focus Groups  Story Boarding Requirements Analysis

 Collect Detailed User Requirements  Iterative Process  Segment and Prioritize o Priority 1 – Critical To Work Process o Priority 2 – Improves Work Process o Priority 3 – Nice To Have  Decompose To Level 2-3 Requirements Analysis

Requirement Types  Functional Requirements  Technical Requirements  Security Requirements  Regulatory Requirements  Business Requirements

System Specifications  Description Of Processes and Procedures  System Requirements  Process Flow Diagrams  Suggested Workflow Changes (if applicable)  Interface Design  Report Design  System Architecture  System Topology  Security Model  Standards and Tools

LIMS Selection Protocol  “Roadmap” Of the Selection and Evaluation Process  Description Of Each Phase  Define Roles and Responsibilities  Evaluation Criteria  Project Plan

 Generate Request For Proposal (RFP)  Distribution To Pre-Qualified Vendors  Analysis of Vendor Responses  Shortlist Vendors  Vendor Demonstrations  Demonstration Evaluation  GAP Analysis  Identify GAP’s That Are Showstoppers  GAP Option Analysis  Cost Analysis and Purchase Vendor Evaluation and Selection Process

Request For Proposal  Developed From System Specifications  Sent To Pre-Qualified Vendors  Provide Information on Company, Product and Services  Develop Vendor Shortlist

Request For Proposal Components  Business Overview  Organizational Structure  Work Process Descriptions  Process Flow Diagrams  Requirements Matrix  Vendor Response Forms

Proposal Evaluation  Requirement Priority/Response Matrix Evaluation  Conformance To Current Workflow  Architecture/Topology Compatibility  Company Profile o Response To Solicitation o Industry Experience o References o Support Services  Cost Analysis

Product Demonstration  Demonstrate How System Conforms To Requirements and Workflows  Not A Sales Demonstration  Standardize Demonstration Using Demonstration Scripts o Outline Tasks To Be Performed o Standard Demonstration Data

Demonstration Evaluation  Conformance To Test Scripts  Scoring Criteria  Conforms  Workaround Available  Non-Conformance

GAP Analysis  Evaluate GAPS  Prioritize GAP  Options Analysis o Specifications o Cost Analysis

Vendor Recommendation  Results Of Product Demonstration  GAP Analysis Results  Cost Analysis

LIMS Purchase  Contract Negotiations  Payment Schedule  Source Code Escrow Agreement  Maintenance Agreement  Warrantee

Benefits Of A Systematic Approach  Capture All User Requirements  Assures that the LIMS is selected based on Requirements not features  Consistent evaluation criteria applied to all products  Reduces the risk associated with the purchase of a LIMS

For More Information, contact: Astrix Technology Group 1090 King Georges Post Rd Suite 604 Edison, NJ