Arc Flash & Data Centers

Slides:



Advertisements
Similar presentations
Subcontractor Electrical Safety & NFPA 70E
Advertisements

LIMITED APPROACH BOUNDARY
 ELECTRICAL SAFETY Gerald P. Robinson Jr., P.E. – Hatch Mott MacDonald.
Arc Flash: Electrical Safety in the Workplace CCIA Safety Committee SAFETY ROUNDTABLE April 10, 2012 sm 1.
De-energization and Lockout
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
San Bernard Electric Cooperative, Inc. Arc Flash Assessment.
ELECTRICAL SAFETY / E N V I R O N H & S T R A I N I N G P R O G R A M ELECTRICAL SAFETY OSHA requires that electrical equipment be approved for use and.
Practice Statement The effective use of Isolate and Insulate equipment and procedures to provide the necessary level of safety when performing Live Line.
When working on or near electricity or electrical equipment you must be trained in & use Electrical Safety Related Work Practices NFPA.
ARC FLASH ANALYSIS.
Take 5 for Safety E. Lessard May 5, LANL Electrical Accident May 3, 2015  LOS ALAMOS, N.M. —Los Alamos National Laboratory workers were injured.
Arc Flash Energy & Protection Presented by EWB Engineering (Electrical Engineers)
1 – Electrical Hazard Recognition EFCOG Electrical Safety Subgroup May 2015 Electrical Safety Month 2015.
Electrical Safety Training
Arc Flash Prevention North Carolina State University Anthony R. Patrick Facilities Electrical Engineer John A. Turek Manager, Occupational Safety March.
Utilizing Only Qualified Persons for Electrical Work can Reduce Risk Presented by: Dennis K. Neitzel, CPE Director Emeritus AVO Training Institute, Inc.
“Standard for Electrical Safety in the Workplace”
What is Arc Flash? Arc flash is a short circuit through air that flashes over from one exposed live conductor to another conductor or to ground. Arc flash.
 Recognize the scope and structure of the OSHA standards.  Identify the common electrical hazards in long term care settings.  Discuss electrical safety.
Occupational Safety and Health Course for Healthcare Professionals.
© Introduction to Electrical Safety Module 1.
Bonding, Grounding and the NEC  Presented by The National Association of Certified Home Inspectors
An Introduction to Mersen Electrical Services Putting electrical safety to work.
High Voltage Electrical Safety
Lockout/Tagout Authorized Employee Slide Show Notes
NWACC Business & Industry Workforce Development Institute J- 1 CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) FOR GENERAL INDUSTRY.
Establishing an Electrically Safe Work Condition May is Electrical Safety Month Training A product of the EFCOG Electrical Safety Task Group.
Electrical Safety INSTRUCTOR’S NOTES:
Electrical Safety INSTRUCTOR’S NOTES:
© Evaluating Electrical Risk Factors Module 3.
NECA & Salisbury Assessment Solutions Partnership.
Electrical Safety INSTRUCTOR’S NOTES:
Copyright  Progressive Business Publications Electrical Safety.
Power System Engineering Want to own your Customer’s Power System?
Copyright © 2011 Rockwell Automation, Inc. All rights reserved. CENTERLINE 2100 Motor Control Center - SecureConnect™ September 1, 2011.
SAFETYSAFETY. Overview ●Introduction to Safety ●Potential Electronic Mishaps ●Safe Work Practices.
Take 5 for Safety E. Lessard May 12, Arc Flash Event at INL Involving Situational Awareness Barrier  On April 15, 2015, Idaho National Lab workers.
Electrical Safety The following contains disturbing images and videos. Caution is advised.
NFPA 70E Electrical Safety in the Workplace. Objectives What NFPA 70E covers Understand Arc Flash, Incident Energy, & Flash Protection Boundary Standards,
MNM Fatal Electrical Accident Electrical Accident October 10, 2010 (Oklahoma) October 10, 2010 (Oklahoma) Granite Operation Granite Operation Contract.
First Draft Language (B) Service Equipment. In addition to the requirements in (A), service equipment shall contain the following information: (1)
Electrical Safety, Subpart K
Teknologi Pusat Data 12 Data Center Site Infrastructure Tier Standard: Topology Ida Nurhaida, ST., MT. FASILKOM Teknik Informatika.
MNM Fatal Electrical Electrical November 18, 2013 (Kentucky) November 18, 2013 (Kentucky) Crushed Stone Mine Crushed Stone Mine Contract Electrician.
Oregon OSHA Grant # NFPA 70E - How to Comply with OSHA’s Electrical Standards NECA-IBEW Electrical Training Center’s Free Online Course This.
Electrical Safety in the Workplace FN000385/CR. FN000385/CR, Electrical Safety in the Workplace 2 Overview NFPA 70E Objectives Electrical Hazards Mitigation.
Installation of Heating, Cooling, and Refrigeration Systems Electricity for Refrigeration, Heating and Air Conditioning 7th Edition Chapter 8 Installation.
Chicago Area Facilities (CAF) Electrical Safety Program.
Working On or Near Energized Conductors and FR Clothing.
© BLR ® —Business & Legal Resources 1408 Lockout/Tagout Authorized Employee.
Training of Airport Visual Aids Maintenance Personnel “Airport Operator” - Are you Meeting the Requirements? IESALC Denver 2015 Presented by Seward Ford.
3 Ways to Prevent Electric Arc Flash Blasts By Steward Hudson From Designnews.com View Original Article HERE:
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
1 FOM 4.2 Remediating Arc Flash Hazards in New and Existing Data Centers Joseph Furmanski Director, Data Center Facilities and Technologies.
ELECTRICAL SAFETY TASK GROUP
What is Arc Flash? Electrical arc flash and arc blasts release dangerous levels of heat energy, fire , molten materials, vaporized solids that can be inhaled,
NFPA 70E: Standard for Electrical Safety in the Workplace
LCLS-II CRYOPLANT CONTROLS HARDWARE FINAL DESIGN REVIEW
Electrical Safety Equipment
General Information for Electrical Installations
OSHA’s Final Rule: Electric Power Generation, Transmission, and Distribution Electrical Protective Equipment Presented to: RESAP Area Administrators Presented.
Developing a Comprehensive Electrical Program
Safety Meeting Topics Standby Generator Safety
Changes to Part 4 – Work Rules
Click to start.
Electrical Hazards By Kory Hildebrand.
Presentation transcript:

Arc Flash & Data Centers Talking Points: Arc Flash is a concern Discussed at Sympossiom Hoping to help calm nerves while stressing importance March 2015 Matt Phillips , VP of Business Development Frank Jenkins, Sr. Electrical Engineer

What are we discussing today? Agenda What are we discussing today? Arc Flash What is it? Why it is important? Who is responsible? How does it affect work? Where is it headed? How do we react? Key takeaways Talking Points:

“Serious harm to people” Definition “Serious harm to people” An arc flash is an undesired electric discharge that travels through the air between conductors or from a conductor to a ground. The resulting explosion can cause fires and serious harm to equipment and people. Talking points: Simple definition – How it occurs is beyond the scope of this presentation Currently there are over 1,400 workplace injuries every month caused by Arc Flash, many of those injuries being debilitating (NSC).  In 2013, there were 139 deaths in the work place caused by electrical injuries, primarily Arc Flash and electrocution (OSHA)      

Why is Arc Flash a big topic Code, Regulations, and Lawyers NFPA 7NFPA 70E 2015 Standard for Electrical Safety Requirements for Employee Workplaces OSHA Standards 29-CFR, Part 1910 Sub part S (electrical) Standard number 1910.333. NEC 2002 Article 110.16 NFPA 70B 2002 Recommended Practice for Electrical Equipment Maintenance. Talking Points: Those sobering numbers are better than they were a decade ago.  However, in its ongoing effort to improve safety in the workplace, OSHA is continuing its pressure to enforce regulations regarding worker standards around electrical gear.  One of the most discussed electrical standards, NFPA 70E, ‘Standard for Electrical Safety in the Workplace’, was developed in response to OSHA’s requests.  One of NFPA 70E’s addressed hazards, Arc Flash, is forcing significant changes in how electrical systems have historically been handled.  Hot work (making modifications to gear when it is energized) is becoming much less common and tightly regulated. The rules have been in code for a while – the enforcement is starting to be stressed There are almost as many lawyers as engineers at Arc Flash Training Seminars

Arc Flash and Data Centers Is de-energized work really just an inconvenience At many data centers, ‘live work’ occurs because the facility feels it is unfeasible to de-energize the equipment — the facility simply believes they cannot shut it down. However, most of the time it is more of an inconvenience, and OSHA will not allow live work to occur just because it's inconvenient to de-energize it. We tend to see that data centers try and justify live work; however, OSHA will not agree with them. Talking Points: The rules have been in code for a while – the enforcement is starting to be stressed OSHA, 80% of electrically related accidents and fatalities involving “Qualified Workers” are caused by arc flash / arc blast. Between 2007 and 2011, more than 2,880 fines were assessed for not meeting OSHA regulation 1910.132(d) which averages out to 1.5 fines a day. We have always done it that way will not be an adequate excuse or reason Concurrently Maintainable Systems will need to be maintained per the design – if you have dual bus you will need to shut down items to work on systems

Safety Rules Level 1 = 4 cal/cm2 Level 2 = 8 cal/cm2 PPE Category level 2015 Level 1 = 4 cal/cm2 Level 2 = 8 cal/cm2 Level 3 = 25 cal/cm2 Level 4 = 40 cal/cm2 Above Level 4 = No energized work Talking Points In all cases Arc Flash rated clothing is a must the level defines the cal/cm rating Safety Glass & Face shields required at a minimum – Hoods become mandatory at level 3 Hardhats always required Minimum of leather gloves with rubber arc rate gloves required at level 3 Space suits begin at level 2 – and get more restrictive as level go up. As levels increase the ability of electricians to do work gets more difficult, takes more time, and more specialized workers required

Energized Work When can we work hot When Powering down equipment becomes an increased hazard: i.e. A Medical facility may require uninterrupted electricity for life support systems When it is simply infeasible to power down; i.e. taking voltage readings, IR Scans, and troubleshooting live components. Note: OSHA recognizes and allows this without EEWP. However, PPE is required and no physical work can be performed without 1st employing an EEWP Talking Points: OSHA has a few exceptions when Hot Work is permitted and acceptable

Energized Electrical Work Permit OSHA Approved - Talking Points: Hot work (making modifications to gear when it is energized) is becoming much less common and tightly regulated All Parties including owner will share liability if event occurs Who is liable?

Future of Arc Flash Rules are already in place Coming Soon Rules are already in place Enforcement is coming soon! PPE is mandatory Energized work will be nearly impossible NFPA 70E make business owners to share liability Energized Electrical Work Permits Talking Points: One accident, one class for inspectors, or one near miss and you can bet we won’t be allowed to continue the way we have been. We need to prepare now – so we are not in a panic when the changes completely take affect.

How do we react? Now and for future Focus on Arc Flash during designs Arc resistant SWGR Remote racking controls Work arounds for de-energized maintenance and additions Remote Distribution Panels vs. Standard PDUs Talking Points: Some things to consider when building new are to Focus on Arc Flash rules as part of design

Study is highly recommended! Existing Facilities Requirements The NFPA 70E -2009 Edition – Standards for Electrical Minimum requirement – Factory Labels Mandatory Full study if any remodels 2012 & 2015 Edition further clarified and mandated compliance. OSHA Requirements Safety of workers Study is highly recommended! Talking Points: Most of us here are not building new – so how does arc flash effect existing facilities Indirect requirement of OSHA - even if no remodels Code requires update every 5 years

What to expect from a study How do I get this done Breaker & switch operations changes Cost for future work may increase Trained personnel New Safety & PPE Standards PPE Purchased Maintenance and installations become more challenging De-energized work may become mandatory Costs to mitigate above Level 4 No longer operate breakers – Alliance Generator Test EC vs Facility People – scheduling Training of staff & purchase of PPE Can no longer do it the way we always have De-energized work There are ways to mitigate –

“Learning to trust concurrently maintainable” De-energized work Are you for real Know your Tier Level Tier I - Single path of power Tier II - Single path of power - Redundant components Tier III - Multiple power and cooling distribution paths, only one path active, redundant components, concurrently maintainable Tier IV – Multiple active power and cooling distribution paths, redundant components, concurrently maintainable, fault tolerant “Learning to trust concurrently maintainable” Do you know if you can turn off a breaker? Do you trust your redundancy?

Learning to trust concurrently maintainable Dual Bus Testing 1st time – common issues How things are plugged-in Both on same bus Circuit overloads In rack PDU overloads Server Issues Power Supplies Manual reset vs. auto Difficulty getting it approved Expected Benefits Improved Confidence Improved Change Control Safer work environments for maintenance Opportunity to operate / exercise standby equipment Hardware validation Peace of Mind Dual Bus Test Results Our Experience 2% Server failure 1st time – 1/2 % Server Failure 2nd Time and trending toward zero subsequent tests Expected Benefits Always better to find problems during a planned event than in a real emergency

Key Takeaways Save Lives & Injuries Action Steps Improving safety Complete an Arc Flash Study Employ Mitigation Strategies Review & Update Safety Standards Train personnel New PPE Standards Understand and trust your “Concurrent Maintainability” Save Lives & Injuries No longer operate breakers – Alliance Generator Test EC vs Facility People – scheduling Training of staff & purchase of PPE Can no longer do it the way we always have De-energized work There are ways to mitigate –

Questions? Thank you Matt Phillips Frank Jenkins Vice President of Business Development, Secretary/Treasurer Matt.Phillips@techsiteplan.com Frank Jenkins Senior Electrical Engineer Frank.Jenkins@techsiteplan.com http://www.techsiteplan.com