Copyright © 2012 SCKCEN The MYRRHA Project Lucia Popescu SCKCEN

Slides:



Advertisements
Similar presentations
Copyright © 2012 SCKCEN WP1: Reference design objectives and specifications Didier De Bruyn (SCKCEN), Presented by Alessandro Alemberti (ANS) 1 7th LEADER.
Advertisements

Didier De Bruyn & Rafaël Fernandez (SCKCEN), Luigi Mansani (Ansaldo), Antony Woaye-Hune (AREVA), Massimo Sarotto (ENEA) & Evaldas Bubelis (KIT) ICAPP’12.
MYRRHA within the EURATOM roadmap MYRRHA Accelerator 1st International design review, SCK-CEN (Brussels, BE), 12-13/11/2012 Roger GARBIL Acting Head of.
HZDR FLUKA activities in support of the MYRRHA Project Short summary with a focus on activation problems Anna Ferrari, Stefan Müller, Jörg Konheiser.
SUPERCONDUCTING RF (SRF) SYSTEMS Peter McIntosh (STFC) Accelerator-driven Production of Medical Isotopes 8 th – 9 th December
EURISOL Transition period MYRRHA and
Copyright © 2013 SCKCEN MAX School - Frankfurt am Main – 1 st -2 nd October 2013 MYRRHA Multipurpose hYbrid Research Reactor for High-tech Applications.
MYRRHA Multipurpose hYbrid Research Reactor for High-tech Applications
MYRRHA ADS, What’s that ? and what for ?
1Jean-Luc Biarrotte, SPL/ESS meeting, Lünd, June 30, Accelerator design for MYRRHA J-L. Biarrotte, CNRS-IN2P3 / IPN Orsay.
Framatome ANP IP-EUROTRANS Meeting WP 1.5 Progress in safety approach development TEE, March Sophie EHSTER.
Research and Innovation Research and Innovation Research and Innovation Research and Innovation Research Infrastructures and Horizon 2020 The EU Framework.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Nuclear and Energy Technologies.
The CAPACITIES Programme building the ERA. theme-driven goal-oriented ratio CPs/CSAs > 1 quantitative effects formulated through names actor-driven process-oriented.
Yacine Kadi Thorium Energy Conference 2013 Globe of Innovation, CERN, Switzerland October 31, 2013.
Copyright © 2012 SCKCEN 3 rd LEADER International workshop Pisa & Bologna, 4-7 September 2012 Didier De Bruyn (SCKCEN) 1 Different ADS concepts in the.
Task 3.3 Fuel Transfer System Conceptual design Joel Janssens SCKCEN LEADER WP3 Technical Meeting, Karlsruhe, 20/11/2012 Copyright © 2011 SCKCEN.
EUROPEAN LEAD FAST REACTOR The LEADER project aims to define an European Lead Fast Reactor configuration for an industrial-sized (600 MWe, the ELFR) reactor,
1 TCADS, Technology & Components of Accelerator Driven Systems, March 15-17, 2010, Karlsruhe (DE) Copyright © 2009 SCKCEN MYRRHA: ADS Programme in Belgium.
Nuclear Energy Options and Project-X Shekhar Mishra Fermilab Yousry Gohar ANL June 7 th 2010.
MA and LLFP Transmutation Performance Assessment in the MYRRHA eXperimental ADS P&T: 8th IEM, Las Vegas, Nevada, USA November 9-11, 2004 E. Malambu, W.
1 INFRA : INFRA : Scientific Information Repository supporting FP7 “The views expressed in this presentation are those of the author.
EPOS Preparatory phase Torild van Eck (ORFEUS) Call INFRA Deadline: December 3, 2009 Funding: between 3 and 6 MEuro Duration: max 4 year.
Copyright © 2014 SCKCEN MYRRHA Multipurpose hYbrid Research Reactor for High-tech Applications A flexible and fast spectrum irradiation facility Eucard2-MAX.
Copyright © 2012 SCKCEN Didier De Bruyn (SCKCEN), with contributions from Rafaël Fernandez (SCKCEN), Luigi Mansani (Ansaldo), Antony Woaye-Hune (AREVA),
D29 - Roadmap for LFR development Davide Mattioli ENEA UTFISSM-PRONOC LEADER (Lead-cooled European Advanced DEmonstration Reactor) WP 1 - Task 1.1 Amsterdam.
EURISOL – Distributed Facility (DF) Y. Blumenfeld, M. Lewitowicz, P. Van Duppen, A. Maj Background : EURISOL RTD : EURISOL Design Study.
IAEA International Atomic Energy Agency IAEA Activities in the Area of Partitioning and Transmutation Alexander Stanculescu Nuclear Energy Department Nuclear.
1 THE PRE-LICENSING OF A MULTI-PURPOSE HYBRID RESEARCH REACTOR FOR HIGH- TECH APPLICATIONS: “MYRRHA” N. HAKIMI, C. DAMS, A. WERTELAERS, V. NYS, M. SCHRAUBEN,
4/2003 Rev 2 I.4.8 – slide 1 of 60 Session I.4.8 Part I Review of Fundamentals Module 4Sources of Radiation Session 8Research Reactors IAEA Post Graduate.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Potential Portuguese Contributions to the ESS Project Areas and topics of interest for the ITN Pedro Vaz (ITN) Workshop “Towards a Portuguese Participation.
Simulations of Accelerator Driven Systems (ADS) Aleksander Polanski Joint Institute for Nuclear Research, Dubna, Russia. The Andrzej Soltan Institute for.
1 SMEs – a priority for FP6 Barend Verachtert DG Research Unit B3 - Research and SMEs.
The Proposed Materials Test Station at LANSCE Eric Pitcher Los Alamos National Laboratory Presented at the Workshop on High-Power Targetry for Future.
CAS, BilbaoMueller, Ugena, Velez, Zerlauth May 31 st v0 SCC – Industrial ADS.
Copyright © 2013 SCKCEN Pb-Bi target for Optimization toward higher yields SCKCEN Mentor : Dr. Lucia-Ana Popescu University Promoter : Prof.
Copyright © 2013 SCKCEN Legacy sites in Belgium K. Mannaerts, S. Pepijn FANC - AFCN D. Jacques, H. Vandenhove Institute Environment, Health and Safety.
ALFRED Control Rod and Safety Rod
The Materials Test Station: An Accelerator Driven Neutron Source for Fusion Materials Testing Eric Pitcher Presented at: Sixth US-PRC Magnetic Fusion Collaboration.
Monte Carlo methods in ADS experiments Study for state exam 2008 Mitja Majerle “Phasotron” and “Energy Plus Transmutation” setups (schematic drawings)
Copyright © 2013 SCKCEN MYRRHA Multipurpose hYbrid Research Reactor for High-tech Applications Contributing to the 3 rd Pillar of the European Strategy.
Copyright © 2014 SCKCEN Production of medical radioisotopes at MYRRHA Lucia Popescu SCKCEN
WP1: Reference design objectives and specifications Didier De Bruyn SCKCEN Fourth PCC meeting FP7 LEADER Bologna, 27 October.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
PAC on Nuclear Physics 20-th Session April 1-2, 2004, Dubna SAD STATUS REPORT ON THE SAD PROJECT & LONGTIME PERSPECTIVES V. Shvetsov FLNP.
Copyright © 2015 SCKCEN ADS accelerator developments presently on-going for MYRRHA and possibly for the Chinese-ADS Dirk Vandeplassche 1 Eucard-2 — APAE.
1 Overview of the MYRRHA accelerator & presentation of the MAX project Jean-Luc BIARROTTE CNRS-IN2P3 / IPN Orsay, France EURATOM FP7 MAX project coordinator.
The International Workshop on Thin Films. Padova 9-12 Oct of slides Present Status of the World- wide Fusion Programme and possible applications.
Copyright © 2013 SCKCEN MYRRHA Design overview Didier De Bruyn (SCKCEN) LEADER technical workshop Petten, February 2013.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
Sources of Radiation Research Reactors
J. G. Weisend II for the ESS Team Energy Efficiency & Recovery at ESS.
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
MYRRHA Prof. Dr. Hamid Aït Abderrahim SCK•CEN
Status of the SAD Project V. Shvetsov, FLNP. SAD Project Objectives Coupling all major components of ADS; Core design, safety assessment, licensing; k.
Nuclear Physics Researches on HIAF and CIADS facilities in China
Copyright © 2013 SCKCEN Nuclear-physics applications of MYRRHA Lucia Popescu SCKCEN
EURISOL: European Collaboration towards the ultimate ISOL facility Yorick Blumenfeld IPN – Orsay We acknowledge the financial support of the European Community.
MARP III R. Schmidt.
Absent, yet Present? Tracing “Responsible Innovation” in Radiation Protection Research Michiel van Oudheusden Ricomet Conference – Vienna – June.
ADS reliability requirements
for the EURISOL Steering Committee
Accelerator Reliability requirements for ADS: the MYRRHA project goals
Emanuele (ESS), Alessandro (CERN), Mikel (Tekniker), Hayley (ISIS)
Summary of session 5: Innovative Ideas and New R&D
Sébastien Bousson (CNRS-IN2P3-IPN Orsay)
Challenges and Perspectives of Accelerator Driven Systems (ADS)
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
European Spallation Neutron Source ESNS
Presentation transcript:

Copyright © 2012 SCKCEN The MYRRHA Project Lucia Popescu SCKCEN

Copyright © 2012 SCKCEN Outlook MYRRHA Motivation Applications catalogue Technical design Project details GUINEVERE (FREYA)

Copyright © 2012 SCKCEN MYRRHA - Accelerator Driven System Reactor Subcritical or Critical modes 65 to 100 MWth Accelerator (600 MeV - 4 mA proton) Fast Neutron Source Spallation Source Lead-Bismuth coolant Multipurpose Flexible Irradiation Facility Innovative & Unique ADS experimental demonstrator scalable to an industrial demonstrator corner stone of the ERAER European Technology Pilot Plant for LFR technology

Copyright © 2012 SCKCEN Applications Catalogue M ultipurpose h Y brid R esearch R eactor for H igh-tech A pplications Waste Fission GEN IV Fusion Fundamental research Silicon doping Radio- isotopes 50 to 100 MWth F Fast = ~10 15 n/cm².s (En>0.75 MeV) F = 1 to n/cm².s (ppm He/dpa ~ 10) in medium-large volumes Material research F Fast = 1 to n/cm².s (En>1 MeV) in large volumes Fuel research Φ tot = 0.5 to n/cm².s F th = 0.5 to n/cm².s (En<0.4 eV) F th = 0.1 to n/cm².s (En<0.4 eV) High-power LINAC 600 MeV – 1 GeV Long irradiation time (transmutation)

Copyright © 2012 SCKCEN Motivation for Transmutation spent fuel reprocessing no reprocessing Uranium naturel Time (years) Relative radiotoxicity transmutation of spent fuel Duration Reduction 1.000x Volume Reduction 100x

Copyright © 2012 SCKCEN MYRRHA – Conceptual Design Reactor Subcritical or Critical modes 65 to 100 MWth Accelerator (600 MeV - 4 mA proton) Fast Neutron Source Spallation Source Lead-Bismuth coolant Multipurpose Flexible Irradiation Facility Innovative & Unique

Copyright © 2012 SCKCEN Reactor Vessel Reactor Cover Core Support Structure Core Barrel Core Support Plate Jacket Core Reflector Assemblies Dummy Assemblies Fuel Assemblies Spallation Target Assembly and Beam Line Above Core Structure Core Plug Multifunctional Channels Core Restraint System Control Rods, Safety Rods, Mo-99 production units Primary Heat Exchangers Primary Pumps Si-doping Facility Diaphragm IVFS IVFHS IVFHM (1) MYRRHA - Reactor

Copyright © 2012 SCKCEN (1) Reactor Layout - Core positions Diameter: 1450 mm k eff ≈0.95 (ADS mode) % MOX fuel 37 multifunctional plugs Fuel Assemblies IPS Total flux (hottest pin)4.7E+15n/cm 2 /s Fast flux above 0.75 MeV (hottest pin) 1.01E+15n/cm 2 /s Dpa(/350 EFPD's) (hottest pin)45 Ppm He/dpa (hottest pin/target zone) 3.8/6.4 Irradiation volume (8 In-Pile Sections) 3700*8cm 3 Spallation target Inlet temperature270°C Coolant delta T130°C Velocity (fuel rod)1.9m/sec Temperature at cladding surface 500°C Maximum linear power370W/cm

Copyright © 2012 SCKCEN (2) MYRRHA - Spallation Target Window-target design Windowless-target design Design requirements enough neutrons to feed the sub-critical core at k eff ≈ 0.95 heat evacuation (~ 65 % of the beam power, i.e. ≈ 2.1 MW) spatial constrains must reach an appropriate lifetime LBE => high neutron gain and =>forced convective heat removal

Copyright © 2012 SCKCEN (3) MYRRHA - Proton Driver Accelerator characteristics: Fundamental parameters (ADS) Particlep Beam energy600 MeV Beam current4 mA ModeCW MTBF> 250 h Failure= beam trip > 3s implementation Superconducting linac frequency176/352/704 MHz Reliability = redundancy Double injector “fault tolerant” scheme 10

Copyright © 2012 SCKCEN implementation of reliability : 3 principles 1.overrating 2.reliability (availability) redundancy 3.repairability principles to be applied to the basic linac layout, but also to much of the ancillary equipment (3) MYRRHA - Proton Driver parallel scheme (double-injector) serial scheme (modular high en. sections)

Copyright © 2012 SCKCEN implementation of reliability : 3 principles 1.overrating 2.reliability (availability) redundancy 3.reparability principles to be applied to the basic linac layout, but also to much of the ancillary equipment parallel scheme (double-injector) serial scheme (modular high en. sections) Principle of fault tolerance in the superconducting spoke linac Detection of an RF fault Change RF phase in neighboring cavities Increase RF field in neighboring cavities Increase of 25% field level -> 50% power margin required within < 3 sec (3) MYRRHA - Proton Driver

Copyright © 2012 SCKCEN PA within MAX (FP7): IPN Orsay INFN Milano Frankfurt University (3) MYRRHA - Proton Driver

Copyright © 2012 SCKCEN MYRRHA on the European Context Energy Independence Knowledge Economy ESFRI European Strategic Forum for Research Infrastructure SET Plan European Strategic Energy Plan Confirmed on ESFRI priority list projects in ESNII (SNETP goals) December 2010 on NuPECC lrp

Copyright © 2012 SCKCEN Belgian Commitment: Secured International Consortium: under Construction Belgium 60 M€ (12 M€/y x 5 y) 2nd phase (11 y) others 576 M€ Belgium 324 M€ (36 M€/y x 9 y) Consortium 960 M€ (2009)

Copyright © 2012 SCKCEN The Project Schedule Front End Engineering Design 2019 On site assembly Construction of components & civil engineering 2015 Tendering & Procurement Commissioning 2023 Progressive start-up Full exploitation FEED (Front End Engineering Design) Minimise technological risks Secure the licensing Secure a sound management and investment structure PDP preliminary dismantling plan PSAR preliminary safety assesment EIAR environmental impact assesment Central Project Team Owner Engineering Team Owner Consortium Group

Copyright © 2012 SCKCEN MYRRHA: an International Project

Copyright © 2012 SCKCEN International Members Consortium – Phase 1 As of early 2012 INVESTMENT PHASE BE EU countries Asian country EU ROW SCKCEN (on behalf of Belgian Federal Government) EU country Public foundation Asian country EU participation ROW participation Belgian Federal Ministry of Energy (50%) Belgian Federal Ministry of Science Policy (50%) 40 % Major European partners A major Asian partner % EU FP7 (RTD) / SET-Plan (Energy) 15 ~ 20% % % ROW (*) European Research Infrastructure Consortium «ERIC» (*) Contribution to investment capital (960 M€’09) Participation vehicle (Consortium members) Primary «investors» IPR management rules tbd

Copyright © 2012 SCKCEN International Members Consortium - Phase 2 OPERATION PHASE Members of Consortium - Individual research of a member of Consortium -Collaborative research amongst members of Consortium - 3 years program commitment CLOSED/ SHARED INFORMATION for MoC Open User Facility - Governments funding - Criteria of research excellence - Independant program access committee (PAC) Collaborative research - Distribution of information to participants Contract research….. Commercial services -RI -NTD Silicon ~25% OPEN INFORMATION SHARED INFORMATION for participants CLOSED INFORMATION for participants «ERIC» (*) (*) European Research Infrastructure Consortium BENEFITS for Members of Consortium Board position to control overal operation Priority of access Potential benefit of low price (compensation profit from commercial revenues) Capacity transfer flexibility (rules tbd) SCKCEN as qualified and licenced operator of the MYRRHA infrastructure under contractual arrangement with ERIC

Copyright © 2012 SCKCEN Joining the MYRRHA Project Belgium is welcoming international participation in the MYRRHA consortium Membership eligibility for the international MYRRHA consortium is based on a balanced in-cash/in-kind contribution Until end 2014: Partners are invited to express their interest in a participation in the MYRRHA programme by sending an Expression of Interest to SCKCEN by end of August After having received this Expression of Interest, the candidate Partner will confirm the contribution level of its commitment by sending a Commitment Letter by end of December After having received the Commitment Letter, the candidate Partner and SCKCEN will enter immediately into negotiation on their co-operation aiming at the signature of a Bilateral Agreement covering the Investment Phase and/or the Operation Phase. This Bilateral Agreement should be signed and enter into force before the mid 2013.

Copyright © 2012 SCKCEN Outlook MYRRHA Motivation Applications catalogue Technical design Project details GUINEVERE (FREYA)

Copyright © 2012 SCKCEN GUINEVERE – a Step Towards MYRRHA (Generator of UnInterrupted NEutrons at the VEnus REactor) Zero-power fast-n-spectrum SCKCEN (sub-critical & critical mode) Collaborative work within EUROTRANS pulsed continuous continuous with beam interruptions D + source 90° bending magnet D +, D 2 +, D 3 + D+D+ 250 keV acc. GENEPI-3C VENUS-F fast subcritical reactor with solid Pb coolant simulation Ti-T target

Copyright © 2012 SCKCEN GUINEVERE: A Modular Fuel Element Design Top lead reflector (40 cm) 8 cm fuel (60 cm active height) rodlets: d = 1.27 cm, h = cm metallic uranium (30 w% U-235)

Copyright © 2012 SCKCEN GUINEVERE - Objectives of an ADS zero-power experiment Perform qualification of sub-criticality monitoring  Validate the core power - beam current relationship Investigate start-up and shut-down procedures  Validate instrumentation and perform dedicated experiments Interpret and validate experimental data  Perform code validation activities and benchmarks Study safety and licensing issues of different component parts as well as that of the integrated system as a whole  Identify licensing aspects for a full-scale ADS For different subcriticality levels For different types of cores provide input for MYRRHA

Copyright © 2012 SCKCEN Outlook MYRRHA Motivation Applications catalogue Technical design Project details GUINEVERE (FREYA)

Copyright © 2012 SCKCEN Conceptual Design

Copyright © 2012 SCKCEN Beam-Splitting System (Concept) MeV mA CW 600 MeV ~  A pulsed beam (up to 250 Hz) ~ 60 m long (later upgrade to 1 GeV p) ISOL target station

Copyright © 2012 SCKCEN Facility Characteristics  based on proven technology (largely based on experience at ISOLDE and TRIUMF)  keep open the possibilities for higher intensity beams  can deliver:  pure RIB: selective ionization, chemistry, M/DM >  intense RIB (x100 compared to the present ISOLDE ‘standard’ RIB)  RIB of good ion optical quality  optimal experimental conditions/lay-out/support (green-field facility!)  extended beam times with stable operation  need very high statistics;  need many time-consuming systematic measurements;  hunt for very rare events;  have an inherent limited detection efficiency.  complementary to ISOL and In-Flight facilities experiments

Copyright © 2012 SCKCEN Applications Applications) Nuclear Physics Astro- physics Atomic Physics Fundamental Interactions Medical Applications DayWeekMonthYear Typical Beam Time/Experiment Condensed Matter Chemistry Biology , , Q Masses Decay (log ft, P xn/yp ) Reactions ( , B(E2), C 2 S) QED tests in HCI Rare decays: GTGR,  xn/yp, cluster decay, SHE Extreme precision: e.g., crystal spectrometry Prototyping Ft values, Correlations (  -,…), EDM Correlations (  -,...), EDM : Statistics + control systematic effects of setup Mössbauer,  -NMR, PAC, EC-SLI Systematic sample measurements SHE chemistry Mn, Fe, Ni, Cu, Zn  -NMR in proteins Systematic sample measurements Radiopharmacy (prototyping) Radiotherapy (prototyping) Systematic production of Radiopharmaceuticals Dedicated radiotherapy center Ultra-high selectivity: LIST configuration Bohr-Weisskopf: A- and g-factors

Copyright © 2012 SCKCEN Project at SCKCEN - an integral part of the MYRRHA project  Delivery of the proton beam by MYRRHA but  To be developed within a separate consortium Physics experiments (from the focal plane of the separator)  To be set up and run by users  Support by physics group at SCKCEN Conceptual design phase ( ) followed by a basic design in the FEED-phase ( ) R&D on target-ion-source systems and parallel operation with MYRRHA Funded BriX project within IAP programme of BELSPO also during phase 7 ( )

Copyright © 2012 SCKCEN Project Schedule Conceptual Design Front End Engineering Design 2018 Awarding construction contracts Manufacturing of components & construction 2022 Assembly & Installation Commissioning Exploitation

Copyright © 2012 SCKCEN Outlook MYRRHA Motivation Applications catalogue Technical design Project details GUINEVERE (FREYA)

Copyright © 2012 SCKCEN MYRRHA: EXPERIMENTAL ACCELERATOR DRIVEN SYSTEM A pan-European, innovative and unique facility at Mol (BE) ISOL facility

Copyright © 2012 SCKCEN Copyright © SCK  CEN PLEASE NOTE! This presentation contains data, information and formats for dedicated use ONLY and may not be copied, distributed or cited without the explicit permission of the SCKCEN. If this has been obtained, please reference it as a “personal communication. By courtesy of SCKCEN”. SCKCEN Studiecentrum voor Kernenergie Centre d'Etude de l'Energie Nucléaire Belgian Nuclear Research Centre Stichting van Openbaar Nut Fondation d'Utilité Publique Foundation of Public Utility Registered Office: Avenue Herrmann-Debrouxlaan 40 – BE-1160 BRUSSELS Operational Office: Boeretang 200 – BE-2400 MOL