US 98 / CR 30A beautification and Safety improvements

Slides:



Advertisements
Similar presentations
ODOT Pedestrian and Bicycle Program Sheila Lyons, PE Local Area Government Conference 2011.
Advertisements

Public Meeting Presentation March 15, Project Location Project Purpose –Traffic reliever to I-95 –Integrate road with the Northwest Sector Plan.
Urban Transportation Council Green Guide for Roads Task Force TAC 2009 Annual Conference and Exhibition Vancouver.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
Morse Avenue Streetscape March 24, 2010 The City of Chicago Department of Transportation.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District August 8, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Facilities & Campus Planning North Pleasant Street Improvement Plan Faculty Senate – February 28, 2008.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Dowell Road Widening From South of HG Truman Road To South of Bean Road Calvert County, Maryland.
Contact: Beth Morris
Slide 1. Slide 2 Introduction How did you get to school as a child?
Maryland Avenue and Westminster Street Jerry Auge, PE Project Manager Ramsey County Paul St. Martin Traffic Engineer City of St. Paul September 10, 2013.
6 th Street (Junipero to Bellflower) Bike Boulevard Design Concepts March 2012.
1 S.R. 426/C.R. 419 Project Update City Council Work Session November 13, 2006.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
Mission Statement To develop a vision of how we, the citizens of Folly, want Center Street to be transformed into the “Gateway to our city.” Then deliver.
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
Virginia Street Bus RAPID Transit Extension Presentation to RTC July 17, 2015 Project Purpose Extend RAPID to UNR Improve pedestrian safety & access Create.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
Multimodal Corridor Plan BCC Discussion Item Transportation Planning Division August 19, 2014.
Borough of Madison Woodland Avenue Reconstruction Engineering CY2009 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
Joint Urban Roadway Standards Workshop April 27, 2006.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
September 24,  Preliminary Development Plan  Location: North side of NW 39 th Avenue in the 8300 to 9099 block  Zoning Districts: R1-B, HM, PD,
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
Planning and Design in Rockford: West State Street Corridor Overview 315 North Main Street · Rockford IL
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Community Development Department Construction Phase.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2011/12 – 2015/16 Presentation to Board of County.
Phase 2: 30% Design Plans September 4 th, 2012.
Sustainable Transportation Design Project: Proposed Changes to Belmont/Morrison Couplet By: Bryan Blanc, Marisa DeMull, Andy Kading.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
Palm Beach MPO Draft Complete Streets Policy Palm Beach MPO Draft Complete Streets Policy Advisory Committees September
Grand Canalscape Phase I and II General Update October 30, 2015.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
2040 LONG RANGE PLAN UPDATE 2040 LRTP Update – Needs Plan Development October 6, 2015 City of Lynn Haven.
Pierce Butler Lexington Parkway Bicycle Connection Presented by: Mr. Michael Recycles Bicycles Sponsored by: Mr. Michael Recycles Bicycles District 11.
2010 Bicycle and Pedestrian Work Program Update.  Several top projects from 2008 Work Program have been completed.  Design is ongoing on other top projects.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
Complete Streets Training
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 14, 2011 EDUCATE  ENGAGE  EMPOWER 1.
INTERNATIONAL DRIVE CRA FY Budget Worksession July 11, 2011.
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
PUD Mike Awe for Sanctuary Mission. SUBJECT PROPERTY S S S S S S S M M M M C C C C C C C.
Complete Streets Training Module 4b – Designing for All Users.
Improvements to Stockton Street
S.R. 44 Corridor Management Plan S.R. 44 Corridor Management Plan
Project Status & Right-of-Way Acquisition
Col. Pike Multimodal: About the Project
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Sample Eastern Sustainable Development Project
Citrus Park Drive Extension
Downtown Streetscape Project Routes 5&20 Corridor Reconfiguration
Alex Henry FDOT District Seven Safety Office
Presentation transcript:

US 98 / CR 30A beautification and Safety improvements East Corridor Project US 98 / CR 30A beautification and Safety improvements

Goal and Scope The goal of our committee is to create a safe and beautiful infrastructure made up of intertwined residential and commercial elements with lighted pedestrian walkways, bicycle paths and an awe-inspiring landscape. This will be the “Gateway” to South Walton County and a model for our community and many other communities in Northwest Florida. The following items are the top priorities of our committee: Safety Beautification Maximization of the multi-modal aspect of the roadways Geographic Scope of the project US 98 from Watersound Parkway to the Walton-Bay County Line CR 30A from Rosemary Beach East to US 98

Project Elements Reduction of Speed Limit on US 98 Median and ROW Landscaping and Lighting Inter-connected and Safe Pedestrian-friendly Sidewalks Inter-connected and Safe Bike Paths Safe Pedestrian and Cyclist-friendly Access Crossing US 98 Undergrounding of Utilities Aesthetic Improvement of Existing Developments

Need for the Project Development Est. # Units Status Watersound Origins 5,000+ homes Over the Next 10 years West Shore Place 40 homes Currently Selling Waterview 37 homes Communities along E CR 30A N/A Pent Up Demand 30Avenue (3 Phases) 42 October 2014 - March 2015 Crossings at Inlet Beach 10 October 2014 Inn at the Gulf 68 2014 / 2015 Donut Hole 1 Opened 3/2014* *Pedestrian crossing 98 struck by vehicle 5/31/14

Design 30A / 98 Intersection Pedestrian Bridge

Design Surrounding 30A / 98 Intersection

Plant Materials Eastern Section Sand Live Oak Russian Sage Sabal Palm Tree Form Ligustrum Muhly Grass Medjool Palm Dwarf Yaupon Saw Palmetto Crepe Myrtle Pindo Palm Imperial Blue Plumbago

Plant Materials Western Section Saw Cordgrass Sand Live Oak Saw Palmetto Muhly Grass Bermuda Turf Grass (all sections)

Multi-use Path Design Example - Buffer from Roadway Example – Multiple Uses Example - Instructional Signage * Our current proposed design calls for a 10-foot wide path with a wider section for pedestrians than for cyclists on both sides of the roadway. Paths shown here are examples and may or may not depict those characteristics.

Pedestrian/Cyclist Bridge at 30A/98

Project Status and Funding Needs Awaiting FDOT response to request to reduce speed limit on US 98 FDOT comments on landscape design and path location due 6/16/14 Cost to light multi-use paths TBD based on FDOT comments Estimate from Gulf Power on cost to underground utilities due 6/30/14 Aesthetic improvement of existing developments currently underway Pedestrian bridge design to be submitted to FDOT 6/13/14 for comments Current cost estimates: Plantings $ 809,000 Irrigation $ 350,000 (Will decrease if borings exist and St. Joe can provide reclaimed water) Multi-use Paths $ ???,??? Landscape Lighting $ ??,??? Pedestrian Bridge $ 1,450,000 Total $ ?,???,???