Complementarity of New RNB Facilities and Their Technological Challenges HIAT ‘09 Venice, Italy June 8, 2009 Jerry Nolen Physics Division Argonne National.

Slides:



Advertisements
Similar presentations
SUPERCONDUCTING RF (SRF) SYSTEMS Peter McIntosh (STFC) Accelerator-driven Production of Medical Isotopes 8 th – 9 th December
Advertisements

This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
Ribbon Electron Beam Profile Monitor For Bunched Beam Tomography Muons, Inc. Innovation in research.
Ion Accelerator Complex for MEIC January 28, 2010.
Radioactive Ion Beams: where are we now experimentally? M. Huyse K.U. Leuven Moriond, March 2003 Opening page.
Status of EURISOL Yorick BLUMENFELD We acknowledge the financial support of the European Community under the FP6 “Research Infrastructure Action - Structuring.
The CARIBU facility Guy Savard Argonne National Laboratory & University of Chicago ATLAS Users Meeting May
PAMELA Contact Author: CONFORM is an RCUK-funded Basic Technology Programme PAMELA: Concepts Particle Accelerator for MEdicaL Applications K.Peach(JAI,
Page 1 Rencontre de Moriond, March RIB production with SPIRAL 2 1.Versatile and evolutive 2.Fission fragments with D beamGoal > fissions/s.
FFAG Fixed Field Alternating Gradient synchrotrons, FFAGs, combine some of the main advantages of both cyclotrons and synchrotrons:  Fixed magnetic field.
XXXVIII th Rencontres de Moriond MORIOND WORKSHOP ON Radioactive beams for nuclear physics and neutrino physics Acceleration of RIB using cyclotrons Guido.
Richard Pardo Argonne National Laboratory ATLAS Operations ATLAS User’s Meeting August 14, 2009.
Future Penning Trap Experiments at GSI / FAIR – The HITRAP and MATS Projects K. Blaum 1,2 and F. Herfurth 1 for the HITRAP and MATS Collaboration 1 GSI.
Facility Developments
Nuclear Energy Options and Project-X Shekhar Mishra Fermilab Yousry Gohar ANL June 7 th 2010.
Nuclear physics input to astrophysics: e.g.  Nuclear structure: Masses, decay half lives, level properties, GT strengths, shell closures etc.  Reaction.
Noyaux CERN- ISOLDE Yorick Blumenfeld.
H. Ravn CERN High-power Targetry for Future Accelerators 7/9/ H. L. Ravn/CERN, EP High power targets for EURISOL and Beta -beams.
RIA Summer School 2006 Exotic Beam Production and Facilities II Brad Sherrill, Michigan State University Lecture I The Rare Isotope Accelerator Concept.
The Youngsters in Theoretical Nuclear Physics An Ace up France’s sleeve in the RIB competition.
N=126 factory Guy Savard Scientific Director of ATLAS Argonne National Laboratory & University of Chicago ATLAS Users Meeting ANL, May 15-16, 2014.
Welcome to the CHARMS See – Tea Sunday, October 11, 2015 Release of Light Alkalis (Li, Na, K) From ISOLDE Targets Strahinja Lukić,
The ISIS strong focusing synchrotron also at the Rutherford Appleton Laboratory. Note that ISIS occupies the same hall as NIMROD used to and re- uses some.
CERN NuPAC meeting Dec 2005 The future of ISOLDE: accelerated radioactive beams Peter Butler 1.HIE-ISOLDE 2.EURISOL.
Radioactive ion beam facilities How does they work ? 2012 Student Practice in JINR Fields of Research 9.oct.2012 I. Sivacekflerovlab.jinr.ru.
Liquid targets for isotope production Jerry Nolen Physics Division, Argonne National Laboratory NuFact'11 XIIIth Workshop on Neutrino Factories, Superbeams.
F Project X Overview Dave McGinnis October 12, 2007.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
MEIC Staged Cooling Scheme and Simulation Studies He Zhang MEIC Collaboration Meeting, 10/06/2015.
Yu. Oganessian FLNR (JINR) PAC–meeting, June 22, 2009, Dubna Experimental activities and main results of the researches at FLNR (JINR) Theme: Synthesis.
Heavy Ion Accelerators for RIKEN RI Beam Factory and Upgrade Plans H. Okuno, et. al. (RIKEN Nishina Center) and P. Ostroumov (ANL) Upgrade Injector Low.
Mats Lindroos Future R&D: beta-beam Mats Lindroos.
Alexander Aleksandrov Oak Ridge National Laboratory
European Isotope Separation On-Line Radioactive Nuclear Beam Facility A preliminary design study of the next- generation European ISOL RNB facility GANIL,
The FAIR* Project *Facility for Antiproton and Ion Research Outline:  FAIR layout  Research programs Peter Senger, GSI USTC Hefei Nov. 21, 2006 and CCNU.
W. Nazarewicz. Limit of stability for heavy nuclei Meitner & Frisch (1939): Nucleus is like liquid drop For Z>100: repulsive Coulomb force stronger than.
The High Intensity Frontier Franco Cervelli INFN-Pisa 7 Nov, 2005.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
Radioactive Ion Beams CW 0.5 MW (for protons) 1 GeV (for protons) p to U Chiara, Manuel, Adam, HuiMay 2011, CAS, Bilbao.
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
UK Research in Nuclear Physics P J Nolan University of Liverpool.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
1 CNS summer school 2002 The RI-Beam Factory and Recent Development in Superheavy Elements Search at RIKEN ◆ Brief introduction to the RI Beam Factory.
Preliminary MEIC Ion Beam Formation Scheme Jiquan Guo for the MEIC design study team Oct. 5,
SECONDARY-BEAM PRODUCTION: PROTONS VERSUS HEAVY IONS A. Kelić, S. Lukić, M. V. Ricciardi, K.-H. Schmidt GSI, Darmstadt, Germany  Present knowledge on.
Warm and Cold Ion Linac: Comparison and Optimization March 30, 2015.
The HITRAP Project at GSI For the HITRAP collaboration: Frank Herfurth GSI Darmstadt.
Low-contamination Rare and Exotic Beams (at CARIBU) Sergey Kondrashev October 16, 2012.
Summary: Physics Opportunities for ISOLDE and n_TOF Peter Butler.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
How can one produce rare isotopes? Question Slid 3 Hendrik Schatz NNPSS 2012, Slide 3 Rare Isotope Production Techniques: Uniqueness of FRIB Target spallation.
GSI Helmholtzzentrum für Schwerionenforschung GmbH GSI visitation W. Barth W. Barth, WAO 2014, Mainz/Germany.
Superconducting Magnet, SCRF and Cryogenics Activities at VECC *, Kolkata Shekhar Mishra Rakesh Bhandari *Department of Atomic Energy, Government of India.
Liquid targets for positron production - ??? Jerry Nolen Physics Division, Argonne National Laboratory POSIPOL Workshop Argonne National Laboratory September.
Comprehensive investigation of the decay losses in the ISOL extraction method KP2 Seminar, Strahinja Lukić.
Ion Accelerator Activities at VECC
Overview of the Rare Isotope Science Project Sun Kee Kim.
Precision Tests of Fundamental Interactions with Ion Trap Experiments
Lecture at the MEDICIS-PROMED Summer School
Acceleration of RIB using linacs
Future R&D: beta-beam Mats Lindroos Mats Lindroos.
Progress of BRIF and CARIF
Design of a PET-isotope-based hadron therapy facility
Accelerator R&D for Future Neutrino Projects
EffiCAS Efficient Facility for Ions at CAS
Joint session – Beta-beams
RF system for MEIC Ion Linac: SRF and Warm Options
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Updated MEIC Ion Beam Formation Scheme
Presentation transcript:

Complementarity of New RNB Facilities and Their Technological Challenges HIAT ‘09 Venice, Italy June 8, 2009 Jerry Nolen Physics Division Argonne National Laboratory

Complementarity and Technological Challenges 2 Science goals drive technological developments for ever more capable radioactive beam facilities Pushing the intensity frontier is a very high priority Physics requires beams are needed at a wide range of energies Some research demands very high quality reaccelerated beams Some research demands the most exotic beams even at the expense of intensity or quality Some research demands specific radioactive beam species even if they are refractory or chemically active No single facility can fulfill all these needs A wide variety of techniques and technologies are required

Complementarity and Technological Challenges 3 Isotope production reaction mechanisms ISOL – Isotope Separator On-Line (target “spallation” or fission) –Light ion-induced “spallation” or fission of heavy targets –Isotopes must diffuse from hot targets and effuse to an ion source –Typical beams ~ MeV protons; typical targets Ta & UC –Can use a “2-step” neutron-generator method In-flight heavy-ion “fragmentation” or fission on a light target –Fragments of the beam are kinematically forward directed at ~beam velocity –Rare isotopes are separated physically; no chemical dependence –Typical beams are 18 O, 82 Kr, & 238 U at MeV/u; typical targets Be or C Niche mechanisms: –Low energy, ~Coulomb barrier, heavy ion fusion Can produce isotopes at the proton drip line, e.g. 100 Sn Synthesis of new elements has used this mechanism –Deep inelastic collisions Beam energies somewhat above the Coulomb barrier Produces rare isotopes that are more neutron-rich than the beam –Spontaneous fission – produces unqiue species of fission products

Complementarity and Technological Challenges 4 World-wide facilities – from the U.S. National Academies’ report

Complementarity and Technological Challenges 5 Next-generation facilities in the works or being proposed (driver beam power ≿ 50 kW) ISAC at TRIUMF in Vancouver, Canada –Operating RIBF at RIKEN in Waco, Japan –Operating SPIRAL2 at GANIL in Caen, France –Under construction FAIR at GSI in Darmstadt, Germany –Under construction FRIB in the U.S. –Project initiated at MSU in 2009 EURISOL in Europe –Concept development phase; Design Study complete 2009

Complementarity and Technological Challenges 6 Important developments are also associated with several lower power projects E.g.: SPES; EXCYT; CARIBU; HIE-ISOLDE; Texas A&M RIB upgrade; Gas-filled and vacuum separators at RIKEN, the LBNL 88” cyclotron, Jyväskylä, GSI, HRIBF, and ATLAS; storage rings for radioactive fragments ESR at GSI and CSR at HIRFL/Lanzhou ~30-40% of the papers at this conference are related to technology development to improve radioactive beam facilities or techniques

Complementarity and Technological Challenges 7 Complementarity (1): ISOL Light-ion induced spallation and fission Very intense beams of many elements, especially noble gases and alkalis –Very useful for stopped beams: atom & ion traps and co- linear laser spectroscopy –Intense reaccelerated beams with excellent beam quality for detailed reaction and structure studies with rare isotopes including heavy and possibly superheavy elements Weak beams of refractory and chemically active elements

Complementarity and Technological Challenges 8 Complementarity (2): Fragmentation Heavy ion induced in-flight fragmentation or fission Provides in-flight beams at high energies –Separated beams of any species including refractory and chemically active elements and isotopes with very short half- lives, even isomers –Lower quality secondary beams due to kinematic energy spread and divergences –High luminosity and excellent particle ID due to high energies and thick targets Provides stopped and reaccelerated beams –“New paradigm” with helium gas catcher Fast and efficient extraction of all elements except He High quality beams, but intensity limits –Intense beams from solid catchers in special cases, e.g. 15 O

Complementarity and Technological Challenges 9 Rare Isotope Production Schemes

Complementarity and Technological Challenges 10 Heavy ion drivers: advantages and limitations Synchrotrons such as the GSI FAIR facility –The least expensive path to high energies, over 1 GeV/u heavy ions –Space charge limits intensities due to pulsed beam structure –Pulsed beam structure is ideal for injecting storage rings for internal beam physics –Pulsed beam structure leads to difficult target technology –Well suited to pulse-to-pulse beam species and energy switching CW cyclotrons such as RIKEN –Less expensive than superconducting linacs up to a few 100 MeV/u heavy ions –Space charge limit is low due to lack of longitudinal focusing of internal beam –Acceptance is low, making multiple charge state acceleration impossible, thereby further limiting intensity CW superconducting linacs such as FRIB –Relatively expensive per volt of acceleration –Very large transverse and longitudinal acceptance: enables multi-q beams, high intensities, and a wide range of ion species FFAG: new ideas being developed, applicability and cost factors currently unknown

Complementarity and Technological Challenges 11 Complementarity (3): other methods Heavy ion fusion –Not traditionally considered for RIB facilities, but intensities up to 100 pµamps (SPIRAL2) open new possibilities “ 100 Sn factory” – yields in the 1-10 ions per second Detailed studies of separated heavy and superheavy elements Decay spectroscopy, studies in atom/ion traps, chemistry following separation Spontaneous fission plus gas catcher (CARIBU, 252 Cf) –Good yields of species not populated by U fission –Many refractory species well suited to the gas catcher

12 CSB ISAC I ISAC II ISOL-type facility at TRIUMF in Vancouver, Canada

Complementarity and Technological Challenges 13 Some technological challenges for ISAC-II Upgrade for high intensity actinide targets –On-going series of tests to document degree of radiological migration/contamination to determine intensity limits –Planning a high power photo-fission option with new electron-beam driver Broaden the variety of RIBs –On-going development of the ion source portfolio Recently implemented FEBIAD source New laser resonance ionization source Developing ECR-based 1+ ISOL source

14 RIKEN RI Beam Factory (RIBF), Nishina Center, Japan Existing Facility: 1975 ~ BJYen (Kamitsubo) RIBF: 1997 ~ (2010) 50 BJYen Prof. Y. Yano, CAARI, 2006

Complementarity and Technological Challenges 15 Some technological challenges for RIKEN Improving transmission efficiencies –See papers Mo 10 & 11 On-going development of strippers, especially for uranium beam –Includes possible test of liquid lithium stripper in collaboration with Argonne and MSU –Recently developed gas stripper that works well for beams with Z ~ Xe and lower Reconfiguring injection scheme with new linac to enable independent superheavy element program Commissioning new SC ECR ion source to increase uranium beam intensity

ATLAS Overview16 GANIL Spiral 2, France

Complementarity and Technological Challenges 17 Some technological challenges for SPIRAL-2 Developing concept for q/m = 1/6 injector to increase intensities expected for heavier beams over those currently expected with 1/3 injector Investigating concepts for the neutron converter for use with 200-kW deuteron beams –Testing rotating carbon wheels (Legnaro and Novosibirsk) –Considering heavy water convertor with aluminum windows Developing plan for cost effective implementation of the high power ISOL target area –See papers Mo 13 and F 1

August 22, 2006I. Augustin, GSI at CAARI 2006, Ft. Worth, TX 18 Primary Beams /s; GeV/u; 238 U 28+ Factor over present intensity 2(4)x10 13 /s 30 GeV protons /s 238 U 92+ up to 35 GeV/u up to 90 GeV protons Secondary Beams Broad range of radioactive beams up to GeV/u; up to factor in intensity over present Antiprotons GeV Cooled beams Rapidly cycling superconducting magnets Key Technical Features Storage and Cooler Rings Radioactive beams e - – A (or Antiproton-A) collider stored and cooled GeV antiprotons Polarized antiprotons(?) International FAIR Project: Germany SIS FRS ESR SIS 100/300 HESR Super FRS NESR CR RESR CBM HADES FLAIR Ground breaking was 11/2007!

Complementarity and Technological Challenges 19 Some technological challenges for FAIR Improve ion source feed material efficiency to enable cost- effective use of rare separated isotopes for beams such as 48 Ca Mitigate vacuum excursions that occur in SIS18 with intense beam injection Develop Super-FRS target concept to use fast-extracted beams from SIS100 –Pulsed beams are essential for fragment accumulation in the storage ring –Intense pulsed beams cause destructive pressure waves in solid or liquid targets

Complementarity and Technological Challenges 20 Concept for FRIB High Power Heavy Ion Driver Linac Fast Beam Research Reaccelerated Beam Research ISOL Production Area In-flight Production and Separator Stopped Beam Research Post accel- erator Gas Stopping To stopped and reaccelerated research areas In-flight production/gas stopping for stopped and reaccelerated beam research Unique, world-class capability Fast-beam research Highest power in the world, farthest reach for rare isotopes Important extension of the scientific reach (5-10% cost increment) ISOL production (could be added as an upgrade)

Complementarity and Technological Challenges 21 Schematic layout of an FRIB driver linac (400 kW) ECR Ion Sources (H + to 238 U) RFQ 57.5 MHz Stripper QWR 57.5, 115 MHz HWR MHz Triple-Spoke 345 MHz Q = 33 +, 34 + Q = 77 +, 78 +, 79 +, 80 +, 81 + Double-Spoke 345 MHz  =0.26  =0.03, 0.06, 0.15  =0.39  =0.50, keV/u300 keV/u 17 MeV/u 400 MeV/u (for 238 U) MHB

Complementarity and Technological Challenges 22 Liquid lithium stripper film development for high power uranium beams Experimental demonstration of a high speed liquid lithium thin film is shown Film parameters: –~ 5 mm in width –~ 10 mm in length –<~ 15  m in thickness –jet velocity of ~ 50 m/s An electron-beam diagnostic for rapid-response film thickness monitor has been developed Liquid-lithium stripper is essential for FRIB – R&D continues to confirm long term stability and do full beam power tests C.B. Reed, et al., ANL

Complementarity and Technological Challenges 23 Targets and separation techniques A Variety of Targets and Production Mechanisms:

Complementarity and Technological Challenges 24 Energy bunching/fast gas catcher concept: challenges High power target High power beam dumps Radiation heating of SC magnets Radiation damage of coils and other components Beam purity at low energies due to charge state mixing Transverse and longitudinal acceptance at low beam energies Range bunching for stopping in the gas cell, especially for light ions

Complementarity and Technological Challenges 25 High Power Test of a Liquid-Lithium Fragmentation Target A 20 kW electron beam produces the same thermal load as a 200 kW U beam on the windowless liquid Li target. 20 kW beam on Target beam spot nozzle Li jet 8 m/s Side view 5 mm 10 mm beam to viewport nozzle 20 o Top view Li jet is confirmed stable in vacuum with a U beam equivalent thermal load. Power density is 8 MW/cm 400 kW beam power at 200 MeV/u.

Complementarity and Technological Challenges 26 CARIBU gas catcher design (see paper Mo 5) Device similar to the previously developed FRIB gas catcher –Same operating principle (RF +DC + gas flow) –Similar construction –Similar length –Twice the diameter (50 cm inner diameter)

Complementarity and Technological Challenges 27 EURISOL: a Design Study for a 1-5 MW multi purpose facility DS to be completed in 2009 for 1-GeV proton driver and 150 MeV/u post-accel.

Complementarity and Technological Challenges 28 Some technological challenges for EURISOL Development of multi-megawatt neutron-generator/uranium target concept to achieve fissions per second with efficient isotope extraction –Involves investigation of MAFF/PIAVE concepts using 235U with moderator/reflector and mercury “curtain” target –Considering multiple target/ion source assemblies around converter and merging the beams –Builds on the development of high density, high thermal conductivity uranium carbide by the Legnaro/Gatchina/GANIL collaboration Development of direct irradiation ~100-kW ISOL target/ion source systems Development of high efficiency charge breeder for post-accel.

Complementarity and Technological Challenges 29 Summary There is currently world-wide interest in the fundamental nuclear science issues that can be addressed by next-generation radioactive beam facilities. The science drivers require a broad-based approach that can only be accomplished with a variety of technologies Many technologies are pushing the limits and require on-going R&D and innovation Many recent developments in this field are being reported at this conference There is hard work ahead, but also an exciting future in this field!!!