FORMAT OF PUBLIC MEETING Introduction by the Chair Introduction by the Chair Confirmation of public notice Confirmation of public notice Municipal overview.

Slides:



Advertisements
Similar presentations
 Introduction by the Chair  Confirmation of public notice  Municipal overview of planning applications  Public comment  Council & public questions.
Advertisements

Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Draft Policy Overview Utilities & Renewable Energy Planning Study Presentation By: Tim Cane, The Jones Consulting Group Ltd. November 12, 2008 Township.
Public Meeting Introduction by the Chair Confirmation of Public Notice Municipal overview of the Official Plan and Zoning By-Law Public Comment Council.
January 30, 2014 Luke Lortie, EIT Jerry Auge, PE
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
FORMAT OF PUBLIC MEETING Introduction by the Chair Introduction by the Chair Confirmation of public notice Confirmation of public notice Municipal overview.
 Introduction by the Chair  Confirmation of public notice  Municipal overview of planning applications  Public comment  Council & public questions.
Proposed CBS Municipal Plan and Development Regulations Amendments for Backlot Development Municipal Plan Amendment No. 9, 2015 Development Regulations.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
Engineering and Technical Plans Description, process and standards Dh 2005.
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
Prepared for: NEW YORK STATE PLANNING FEDERATION April 14, 2015 Prepared by: BME ASSOCIATES Peter G. Vars, P.E. Essential Skills: Reading and Interpreting.
August 2004 Hickory by Choice Linking Land Use and Air Quality Planning.
Land Use Study for the Community of Winchester May 21, 2012.
Presents Project Crimson March 1, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
An Appeal of a Request For a Special Use Authorization For a Solar Energy Power Plant Docket SUA Appeal of Rainbow Solar Facility.
Morphum Environmental Ltd Environmental Engineers and Consultants
Team Tech meeting May 22, 2006 State Traffic Commission & DEP Storm Water Permitting State Traffic Commission Permitting & Storm Water Permitting State.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Land Use Study for the Community of Winchester July 9, 2012.
PUBLIC MEETING Introduction by the Chair Confirmation of Public Notice Municipal Overview of Applications Public Comment Council & Public questions * Please.
Community Development Department ISLAND WALK REZONING REQUEST APPLICATION #2648.
Planning Area Standards May 18, Outline of today’s meeting Introductions Recap of previous community meetings Planning Area Standards Discussion.
Planning & Community Development Department Hillsides Residential Care and Educational Center Master Plan City Council July 20, 2015.
Community Development Department ISLAND WALK MASTER PLANNED DEVELOPMENT APPLICATION #2648.
City of Fitchburg, WISAA Design Group + Teska +Montgomery NORTH STONER PRAIRIE NEIGHBORHOOD PLAN Steering Committee Workshop: Plan Vision, Principles,
Broadview Second Access. Parlette Annexation What has changed? Parlette has asked for reconsideration –Recitals in agreement are not operative provisions.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
La Center, Washington: Balancing Pipelines and Populations 1.
West of England Joint Waste Development Plan Document Allan Davies Planning Policy Officer North Somerset Council West of England Partnership Office North.
Community Development Department Special Exceptions for: Automotive parts (e.g. accessories and tires) and Automotive, Recreational Vehicle, and Boat Dealers.
A 1,240 Acre Master Development Plan Proposal, West of Willcox, AZ. Cochise County Board of Supervisors August 23, 2011 Docket MDP / Z
 Introduction by the Chair  Confirmation of public notice  Municipal overview of planning applications  Public comment  Council & public questions.
New Brighton Planning Commission Meeting March 21, 2006 Public Hearing: Special Use Permit (06-004) for a porch addition at th Avenue NW.
The ABC ’ s of the Development Review Process: Navigating the Bureaucratic Maze 2007 GPA Fall Conference.
PUBLIC MEETING Application for Zoning Amendment 60 – 80 9 th Street East Ontario Inc. in accordance with Section 34 of the Planning Act 6 May 2013.
How to Read Site Plans and Development Plans Mary Pennock, Principal Planner Lee Garman, Principal Planner 2014 Commonwealth Planning and Zoning Conference.
1 Public Planning Meeting Date: June 24, 2015 Application: Draft Plan of Subdivision, Official Plan and Zoning By-law Amendment Applicant: Highland Gate.
26 Developments Inc. Part Lot 48, Concession 10 (Part 1, Plan 51R-27666) Town of Collingwood, County of Simcoe. February 2, 2015 – STATUTORY PUBLIC MEETING.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
BMO Stadium Expansion Community Consultation Meeting March 5, 2014.
EASTSIDE ACTIVITY CENTER DRAFT MASTER PLAN Board of County Commissioners January 22, 2008.
SCDC SCHEME OF DELEGATION RELATING TO PLANNING APPLICATIONS October / November 2015.
Durham Villas Planned Unit Development TSM & REZ Morris Bud Keeney Butte County Board of Supervisors December 11, 2012.
Eagle Heights Development Proposal Consists of two sets of development applications and two property ownerships: Paletta and Taylor lands. Paletta is applicant.
Nordlaw Cottage Inc. Site Plan Control Agreement
Public Hearing Seattle Ridge Preliminary Plat/ Planned Area Development PP December 18, 2013.
Public Meeting : Zoning By-law Amendment Application File No. ZBA 01/ Wellington Road 124 Dan Currie, MA, MCIP RPP MHBC PLANNING March 7, 2016.
LAND Subdivie a 4.27 acres into 18 lots 17 detached single family homes One duplex Base density allows for unit Affordable housing bonus.
Planning and Zoning Division Jefferson County Green Gables Official Development Plan Case RZ Presenter: Alan Tiefenbach.
1 Sahtu Land Use Planning Board Public Hearing on the Draft 3 Sahtu Land Use Plan May 2011 INAC Presentation.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
DEVELOPMENT SERVICES ADVISORY DESIGN PANEL. Recent Projects  University Village Local Area Plan (2015)  Active Transportation Plan (2014)  Trans Canada.
Christopher Brown, Planner II December 4th, 2014 Case No. 14ZONE1036 La Grange Road Office Louisville Metro Planning Commission Public Hearing.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission Design Recommendation LU MS Conway’s NW.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
July 4, 2017 AURORA UNITED CHURCH + SOUTHBOUND DEVELOPMENT LTD Yonge Street, 55&57/57A Temperance Street, 12&16 Tyler Street General Committee Meeting.
Presented by Kelsey Lang, Planning Associate June 27, 2016
Jefferson County SA Red Rocks Site Approval
Jefferson County Planning Commission Hearing April 10, 2013
Architectural Drafting
MPO School Transportation Working Group
Application for Zoning Amendment
Official Plan and Zoning By-law Amendment Application
Proposed Zoning By-law Amendment & Future Consent Application
Planning Advisory Committee Orientation
WSUP (Lightning W Tank #2)
Presentation transcript:

FORMAT OF PUBLIC MEETING Introduction by the Chair Introduction by the Chair Confirmation of public notice Confirmation of public notice Municipal overview of planning applications Municipal overview of planning applications Public comment Public comment Council & public questions Council & public questions * Please turn off all cell phones now, Thank you.

Public Meeting February 2 nd, 2015 February 2 nd, 2015 Town File No. D08414

11476 Highway 26 West Public Meeting Notice circulated on January 9 th, 2015

11476 Highway 26 West – Aerial Photo,

OPA 33 excerpts from Schedule A and C C A Highway 26 West C

- Comments Received - Augustine Anifowose, Ministry of Transportation – January 27 th, No concerns with the application going forward. Lina Raffoul, Bell Canada – January 22 nd, 2015 letter An easement may be required to service the property, John Trude, Police Services – January 12 th, No police issues or concerns. Tony Dominguez, Rogers – January 15 th, 2015 letter Rogers communications confirms there are services available in the immediate area and intend on providing services to the proposed buildings.

Tim Salkeld, Nottawasaga Valley Conservation Authority – February 2 nd, The NVCA provides the following preliminary comments based upon Natural Heritage and Natural Hazard policies established under the Provincial Policy Statement and regulations established under the Conservation Authorities Act. Natural Heritage: Part of the property is within a swamp/wetland. It is isolated on the landscape and it has been excluded from the draft Natural Heritage system based on this isolation, small size of forest and planning considerations (designation and zoning). There appears to be a drainage channel from the wetland north to the bay. From a natural heritage perspective, our focus will be on stormwater drainage considerations with a view to minimizing impacts on the coastal wetland to the north. Stormwater Management: The NVCA’s review of the Preliminary Stormwater Management Report is currently incomplete however we will provide comment as soon as possible. We note the site exhibits imperfect drainage at some locations and all development will need to be adequately elevated above potential flood/high water levels. Regional Storm spills from the Cranberry Marsh area have been identified in the western part of Collingwood flowing northwards towards Georgian Bay. Confirmation that the development is not affected by these spills is required. The property is at least partially within the area under the regulatory jurisdiction of the NVCA where permit is required under Ontario Regulation 172/06 established under the Conservation Authorities Act. The review of this Plan of Condominium will be subject to the NVCA’s Planning Review Fees. - Comments Received -

- Engineering Comments - Herb Lemon, Engineering Services – January 30 th, memorandum The following comments are related to the proposed Official Plan and Zoning By-law Amendment only; we reserve the right to further comment(s) at the Site Plan application stage. Traffic & Transportation We have received the Traffic Impact Study in support of the proposed development. In this report they have analysed site traffic generation and its impact on Highway 26 and the nearby intersection, site access points and the parking component. Some access improvements are recommended and we reserve further comments until Site Plan Application process Sanitary Servicing Sanitary flows from this development will not adversely affect the Highway 26 sanitary sewer. The Town of Collingwood currently has Development Charges for the Black Ash Creek Pump Station improvements, when the sanitary flows meet 85% of the Pump Station capacity the improvement will be completed. The sewage treatment plant has available capacity subject to first come, first serve basis.

Herb Lemon, Engineering Services – January 30 th, memorandum Storm Water Management This development must accommodate the 5-year storm flows and the major overland spill from Highway 26 (and surrounding area) within a dedicated easement. In addition the major overland spill corridor needs to be further evaluated. We have been provided generalities but require additional supporting information in this regard as it could impact the existing Lighthouse Point development. The proposed outlet must be evaluated for pipe condition and capacity to the outlet. It must also be noted that this development will be subject to NVCA review and approval. The town defers to the NVCA for further comments on this issue. - Engineering Comments continued -

Peggy Slama, C.P.U. – January 30 th, memo CPU will provide further comments upon receipt of a detailed submission. In general, the water department does not have any concerns with the redesignation or rezoning application and will provide further comments upon receipt of a detailed submission (i.e. Site plan application). The site plan submission will be required to address the servicing circumstances of the area and meet the standards and submission requirements of the Town and CPU. - Collingwood Public Utilities Comments –

It should be noted that all Town water mains and services are to be constructed in accordance with Town and CPU standards. That is Ductile Iron water mains and copper services A Site Servicing Plan will be required for this development show proposed services to the proposed residential and commercial buildings for CPU review and approval. There is an existing 150mm diameter water service to this property as shown below, which can be used for connection to the water system. As noted in the Functional Servicing Report, the watermain will require looping within the property, with another connection to the existing 300mm water main on Highway 26. All watermain connections and servicing will be at the developer’s cost. As a general principal each building must be connected to a municipal water main. As such an easement will be required over the proposed water main and it should extend to the individual unit curb stops or building isolation valve. A completed Form 1 and appendix signed and stamped by a professional Engineer will need to be submitted to CPU for approval all at the developer’s cost. The proposed water system will need to be added to the Town water model. In order to do this CPU will require proposed water demands and digital plans showing the water main layout and topographic information. This information will be forwarded to our consultants for modeling. This work is to be carried out at the developer’s cost. - Collingwood Public Utilities Comments –

Dave Wood, Envision Tatham, January 28, 2015 letter In context of a high density development, we are supportive of the proposed submission in principle, as it provides a concise and clear layout of built form with a variety of defined amenity/ parkette spaces that offer both passive and active recreational options. - clear and safe pedestrian routes be established (off road) throughout the development and through surface parking lots to provide access to the commercial block and the various parkette amenity areas; - there do not appear to be adequate ramp transitions between the ground level roadway and the below-ground parking garages at the eight entrances. Clarification is needed, as grade transitions, access and vehicle maneuvering for below-ground parking can be space consumptive ; -clarification should be provided as to what the central rows of ‘squares’ represent within the ‘Common Area’ corridors. -we recommend that perimeter trees be surveyed as a component of the topographic survey and that a Tree Preservation Plan be prepared to ensure that they are protected during construction and remain as an effective vegetative buffer. The plan should identify the canopy drip line of the trees and provide notes and details for tree protection fencing and other mitigation measures. - further to the above, the existing trees should be shown on the grading and servicing drawings and all grading, servicing, excavations, construction access, and storage should be limited to areas outside the drip lines of these trees. -We note that the minimum requirement for 30% tree canopy coverage should still be achieved as per the Urban Design Manual (UDM) - Section 10G. This can be accomplished through tree preservation and/ or new tree plantings. -Given that this development is being integrated into an existing condominium development on three sides, consideration should be given to providing adequate landscape buffers between the parking lots and property boundaries, particularly on the western boundary. - Landscape Consultant Comments –

While Planning Services staff are supportive of residential and convenience commercial uses for the property, the proposed density and amount of commercial space appears to be too high to address adequate landscaping, buffering and other site plan implementation issues. A modest scaling back in density and/or amount of commercial space and an accompanying proposal redesign would likely address planning concerns. - Planning Comments -

- Public Comments - Edmund J. Lucas – January 28 th, 2015 letter Supportive of the development proposal on the basis that a high end residential use with freehold units and amenities is preferable to a hotel/motel accommodation. Concerned about site plan issues such as lighting, fencing, buffering, drainage and security.

- Communication- To receive notification of when applications are scheduled for consideration by Council: 1. Check the Town’s website for Postings and Agendas; 2. Clerks Services with request for Notice to: Sara Almas Note: Council agenda’s are posted on the Town of Collingwood website ( the Friday before a meeting. (i.e., 3 days prior)