Building Commissioning. What is building commissioning? Building commissioning is a systematic and documented process of ensuring that the owner’s operational.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
This is a partial presentation that I did for an employer who received a 5 million dollar contract from this presentation. The total slide count was over.
TESTING AND BALANCING IN HEALTHCARE FACILITIES. What is Test & Balance The art of establishing air and water flows to meet design criteria. Total System.
SBA Unit 8B: Building Commissioning Prepared By: David J Ellner, PE.
PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
1100 Superior Ave., Suite Wolf Ledges Parkway, Suite West Third Avenue Cleveland, OH 44114Akron, OH 44311Columbus, OH
Sustainability and Energy ServicesSustainability and Energy Services.
ASSESS TARGET DELIVER MEASURE Understanding Building Energy Audits Joe Hofstetter P.E., CEM, LEED AP Karpinski Engineering.
Sustainability and Commissioning for Military Facilities WHAT IT IS AND WHAT IT IS NOT! Dan Jackson, PE, Vice President Tim Whitley, PE, CxA, CCP, LEED.
Energy Efficient Operations Presentation to ASHRAE Energy Expo October 2, 2013 Center for Energy and Environment.
Building Commissioning
Environmental System Science November 18, 2009 Identifying Energy Conservation Measures. Tailoring Retro-commissioning to meet your needs.
Copyright 2008, International Code Council 2012 IECC ® for SERBCA Based on the 2012 International Energy Conservation Code.
Energy Saving Improvement Programs aka: ESIP; ESCO; P.L. 2009, c. 4 Gordon Ball, Senior Procurement Specialist Division of Local Government Services Introducing…
Integrated and Intelligent Building Certification for Designers and Installers: The Industry’s Path Forward for Credibility.
Building Services Design Process
Rachel Weaver Program Manager Maryland Energy Administration
Genesis Solar Module Brochure ™
SEEA Presentation to SEES March 2006 SEEA Presentation to SEES February 2006 SOUTHEAST ENERGY EFFICIENCY ALLIANCE.
The Future of Commissioning for Sustained Building Performance Birmingham, AL SERBCA Fall Conference Proposed LEED Requirements for Commissioning.
9 Closing the Project Teaching Strategies
The 5 th Annual Conference on Total Building Commissioning 2009 Commissioning Changes in LEED 2009 Paul McCown, PE, CxA, LEED AP, CEM SSRCx, LLC.
Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.
August 10, 2007 CONTROL YOUR DATA CENTER! Tune your Legacy Data Center to improve overall efficiencies.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
National Sustainable Building Advisor Program Unit 8B Building commissioning Christopher Kerr, CxA Glumac June 4, 2010.
Commissioning for Sustained Building Performance Building Performance Birmingham, AL Marriott 9/29/11 Introduction to Commissioning and Retro-Commissioning.
Energy Efficiency in Industrial and Commercial Facilities 2003 Energy and Environmental Conference September 16, 2003.
Prof. S. Neti, Director Drs. A. Oztekin, C. Romero, and H. Bilirgren.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
The following advertisement is created for the sole purpose of understanding the Commissioning process. The following advertisement is created for the.
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
High Performance Buildings 2007 Differences in Commissioning Scope ACG, ASHRAE Guideline 0, GSA and LEED Steven (Rusty) Ross PE, CxA, LEED AP SSRCx, LLC.
Building Commissioning/Energy Performance Contracting.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
Halcom Consulting llc Sustainability Consulting & Commissioning 2917 Carlisle NE Suite 109 Albuquerque, New Mexico p f
COMMISSIONING: REDUCING THE CARBON FOOTPRINT (…and Maintenance Costs) (…and Operating Costs)
Contracting for Commissioning Services A Priority for Facility Owner’s and Program Managers Matt Ferreira, CxA, LEED AP October 14, 2008.
Fundamentals of LEED v4 for
Home Owners Features Kanisha Brown Samisha sewell Ciera Francis.
Sustainable Laboratory Design: Challenges and Solutions
Week 12 Overview of equipment and building envelope as part of the energy audit.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Introduction to Energy Management Doty, Steve & Turner, Wayne. (2009). Energy Management Handbook. Lilburn, GA: The Fairmount Press. Jacobsen, J. (2011).
Energy stars ► 1. Effective Insulation ► Properly installed and inspected insulation in floors, walls, and attics ensures even temperatures throughout.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Tariq Isley.Nebil Akalu. Effective Insulation Properly installed and inspected insulation in floors, walls, and attics ensures even temperatures throughout.
Soaring Above the Standards ‘The Atrium’ Scott Sinclair, P.Eng President (604)
Data Center Energy Use, Metrics and Rating Systems Steve Greenberg Energy Management Engineer Environmental Energy Technologies Division Lawrence Berkeley.
DT 1320 BIM UNIT 1 INTRO TO ARCHITECTURAL DESIGN AND BIM.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Commissioning HVAC Systems: Lessons learned throughout
Town of Woodbridge Beecher Road School Infrastructure & Energy Upgrade Presentation to Board of Education December 17 th, 2012 AKF John B. Rice, PE, LEED.
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
The importance of process in high performance building design.
Rick Khan, Director Federal Energy Management Program Department of Energy FEMP: Leading and Partnering with Agencies to Design and Build High Performing,
Fort Stanwix National Monument Energy Audit Contract
Sean Weber Energy Engineer
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
Section 1.0 — Fundamentals and General
BEEP Integrated Design Process for Energy Efficient Buildings
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
LEED BD+C – Integrative Process
M&E SYSTEM.
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
Save While You Save Greening Schools through Performance Contracting
Who Benefits? Building Owners
Presentation transcript:

Building Commissioning

What is building commissioning? Building commissioning is a systematic and documented process of ensuring that the owner’s operational needs are met, building systems perform efficiently, and building operators are properly trained.

What is the goal of building commissioning? To deliver a facility that operates as it was intended. To provide a facility that meets the needs of the building owner and occupants. To provide appropriate training for facility operators on the operation and maintenance of the building systems.

When should the building commissioning process start? Building commissioning can be started near the end of construction. (good) Building commissioning can be started at the start of construction. (better) Building commissioning can be started during schematic design. (best)

When should the building commissioning process start? Benefits of early involvement – Design review, better building commissioning specifications, clear building commissioning expectations, and better bids. Early involvement by the commissioning agent may not carry a cost premium. It will reduce project design problems and will introduce building commissioning expectations early.

Develop building commissioning scope of work Before meeting with the commissioning agent develop a draft commissioning scope of work. Ask the facility owner and operator what were the problems they have encountered on previous construction projects. Do not limit your commissioning to just HVAC and controls. Envelope, lighting controls, security, lab spaces, medical gas systems, and other complex systems should be considered.

Develop building commissioning scope of work Then use the Commissioning Guidelines for systems to be commissioned. –HVAC systems –Air distribution systems –Plumbing and piping systems –Heating and cooling plant equipment –Control systems –Electrical systems

What should be budgeted for building commissioning? The following are the rules of thumb I use when helping a client budget for building commissioning. $0.75 to $1.50 per square foot depending on the complexity, size and location of the building. 1.0 to 2.0% of the total construction cost.

Cost savings for building commissioning 8% - 20% reduction in operating costs for a building that is commissioned. 1.5 – 3.5 year simple payback on commissioning. Based on: –fewer change orders, –lower energy usage, and –reduced operational problems.

What does building commissioning involve? Verifying and documenting building systems’ performance through all phases of a project from concept to occupancy. Testing HVAC systems’ performance to ensure that they meet the needs of the building throughout the full range of operating parameters that may be encountered.

What does the Energy Code require? Section Systems Commissioning and Section Commissioning Requirements Preliminary Commissioning Report. A preliminary report of test procedures and results Final Commissioning Report. A complete report of test procedures and results shall be prepared and filed with the owner.

What does the Energy Code require? Functional testing of the HVAC equipment and controls. (Section ) Functional testing of the lighting controls. (Section )

What does LEED require for building commissioning? LEED – Leadership in Energy and Environmental Design. LEED requires the use of an independent building commissioning agent. LEED requires Fundamental Building Systems Commissioning (required for all LEED certified projects). For additional LEED Information please contact Stuart Simpson (360) or

Building commissioning resources GA’s Building Commissioning Program: gy/Pages/default.aspxhttp:// gy/Pages/default.aspx Contact Doug Kilpatrick Building Commissioning Association:

Thank You Doug Kilpatrick Department of Enterprise Services (360)