IPPC and Industry By Dr. Ken Macken Dublin Regional Licensing Manager.

Slides:



Advertisements
Similar presentations
Permitting Process Overview Alasdair McKellar PPC Compliance Officer Environment Agency.
Advertisements

Best Available Techniques (BAT)
Environmentally sound management of ship recycling- simple or complex? Roy Watkinson Department for Environment, Food and Rural Affairs UK Promoting Sustainable.
Managing the Health and Safety of Contractors
EMS Checklist (ISO model)
EU FORMAL REGULATION – TYPES OF STANDARDS ENVIRONMENTAL QUALITY OBJECTIVES ENVIRONMENTAL QUALITY STANDARDS.
EU FORMAL REGULATION – TYPES of STANDARD MINIMUM EMISSION STANDARD (sometimes known as LIMIT VALUES) UNIFORM EMISSION STANDARD.
The Industrial Emissions Directive (IED) 2010/75/EU
Jerevan November Tailing dams inspection Juliane Knaul Legal Expert, Agency of Mining, Geology and Minerals of Brandenburg, Germany AGENCY.
Industrial Pollution Control and Risk Management: IPPC Neil Emmott Environment Directorate-General 7 April 2006.
Substantive environmental provisions Prof. Gyula Bándi.
WASTE MANAGEMENT I WASTE HIERARCHY EUROPEAN UNION FRAMEWORK WASTE DIRECTIVE DEFINITION OF WASTE + ASSOCIATED PROBLEMS 1 Environmental Law.
IPPC IN MINING AND METALLURGY IN THE REPUBLIC OF MACEDONIA Bosko Nikov
Energy auditing for IPPC facilities in Ireland The Rising Energy Demand.
European Commission, DG Environment Unit B.1: Water, Marine and Soil EU Substitution Conference - Hamburg, 13/14 June 2002 Slide 1 EU Conference on Substitution.
1 Reform of the EU regulatory framework for electronic communications What it means for Access to Emergency Services Reform of the EU regulatory framework.
The European IPPC Bureau Institute for Prospective Technological Studies (IPTS) Seville, Spain Internet E.mail : Don.
Protection Against Occupational Exposure
The IPPC Directive and EPER Iksan van der Putte. Objectives of IPPC (Integrated Pollution Prevention and Control) To prevent or minimise emissions To.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
BAT as a main tool for minimisation of the negative impact of industrial activities Aivi Sissa Tallinn – Estonia 27 – 28 March 2008.
The Industrial Emissions Directive (IED) 2010/75/EU Gabriella Gerzsenyi & Menno Verheij European Commission, DG Environment Industrial Emissions Unit 03.
1 The Industrial Emissions Directive (IED) Environmental inspections Filip François DG ENV.C.3 - Industrial Emissions team Joint European Commission –
The Sevilla process for supporting the implementation of the IPPC Directive Michael Parth Tallinn – Estonia 27 – 28 March 2008.
Joint European Commission – IMPEL Seminar on Environmental Inspections Wednesday 17 November 2010 Hotel Le Meredien, Brussels.
Ship Recycling Facility Management System IMO Guideline A.962
Workshop, 12/3/2004 Banska Bystrica – SLOVAC REPUBLIC “INTEGRATED LICENCE PROCEDURE (Greek case)” Katerina Iakovidou-Anastasiadou Hellenic Ministry for.
IAEA International Atomic Energy Agency Overview of legal framework Regional Workshop - School for Drafting Regulations 3-14 November 2014 Abdelmadjid.
Economic and Cross Media aspects Bo Jansson Swedish Environmental Protection Agency
IPPC Directive state of play and future developements
IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA Ankara, Turkey 5-6 November 2009 
Presentation 4: How can I know if nanomaterials are used in my workplace?
The IPPC Directive and its implementation Alexandre Paquot European Commission Environment Directorate-General Phare Capacity.
Ministry of Waters and Environmental Protection, ROMANIA 1 BERCEN 1 st Exchange program – November 2002 Croatia PROBLEMS AND SOLUTIONS IN COOPERATION.
The Industrial Emissions Directive (IED) 2010/75/EU Gabriella Gerzsenyi & Menno Verheij European Commission, DG Environment Industrial Emissions Unit 03.
1 Workshop on the Directive 96/61/EC concerning (IPPC) Integrated pollution prevention and control INFRA Public participation & access to environmental.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic.
Energy Efficiency in IPPC Installations, Wienna Oct/2004 Petr Honskus (SPF Group) Chairman of EE TWG CR Vladimíra Henelová, Monika Přibylová Members.
1 ASPECTS REGARDING PLANNING AND REPORTING RELATED TO RECOMMENDATION 331/2001/EC ON MINIMUM CRITERIA FOR ENVIRONMENTAL INSPECTION AND ITS IMPLEMENTATION.
The European IPPC Bureau Institute for Prospective Technological Studies (IPTS) Seville, Spain Internet E.mail : Don.
Recommendation 2001/331/EC: Review and relation to sectoral inspection requirements Miroslav Angelov European Commission DG Environment, Unit A 1 Enforcement,
IPPC vs Emissions Trading Lesley James Friends of the Earth (England, Wales & N.Ireland) and the European Environmental Bureau.
3rd BERCEN Exchange Programme, Prague WASTE CONDITIONS IN ENVIRONMENTAL PERMITS Mrs. Marianne Lindström, Finnish Environmental Institute,
REVISION OF THE IPPC DIRECTIVE  DIRECTIVE ON INDUSTRIAL EMISSIONS.
The European SEA Directive Simon Marsden School of International Business, University of South Australia Module 1: Basics of SEA.
Recommendation of the European Parliament and of the Council of 4 April 2001 providing for Minimum Criteria for Environmental Inspections in the Member.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
The Permitting Process under the Pollution Prevention and Control (Scotland) Regulations Ian Halliday Senior Policy Officer.
CROATIA Country Report IPPC Directive: implementation, problems, constraints, open questions,… Anita Pokrovac Patekar, B. Sc. Pharm. Ministry of Environmental.
The current legal situation
Plan Waste Assessment MWM01A. What is the purpose of a waste assessment?  The main aims of a waste assessment are to:  Identify each waste stream on.
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
Ministry for Ecology, Energy, Sustainable Development and Sea in charge of Green Technologies and Climate Negotiations
IPPC Permit Procedure in the UK Kiev, 26 January 2011 Alex Radway Senior Advisor Environment Agency for England & Wales, United Kingdom.
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 1 The IPPC Directive Introduction to the philosophy Rob Kramers.
IPPC A general overview Nigel Barraclough Policy Adviser Industrial Pollution Control Branch Air and Environment Quality Division. Taiwanese Environmental.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment Bilateral screening:
Introduction to the philosophy
BMRA Legislative Policy Group – Shredder Sub Group
BAT - BREF Their scope Rob Kramers Senior advisor InfoMil.
INTEGRATED PERMITTING IPPC DIRECTIVE: BEST PRACTICE
Aleksandra Antonowicz Green Federation GAJA/CCB
EU action after Deepwater Horizon accident - Gulf of Mexico – April 2010
PROVISIONS UNDER THE HABITATS DIRECTIVE RELEVANT TO NEEI
EU Food Safety Requirements: - Hygiene of Foodstuffs -
Industrial Emissions Directive Targeted stakeholder survey
WFD CIS Working Group Meeting Brussels, 4/4/2019
Presentation transcript:

IPPC and Industry By Dr. Ken Macken Dublin Regional Licensing Manager

Requirements of IPPC Directive (96/61/EC) - 1 zAll the appropriate preventive measures are taken against pollution, in particular through application of best available techniques (BAT);

BATNEEC under EPA Act zThe Best Available Technology Not Entailing Excessive Costs shall be construed as meaning the provision and proper maintenance, use, operation and supervision of facilities which, having regard to all the circumstances, are the most suitable for the purposes. zRegard shall be had to— z( a ) in the case of an activity other than an established activity— z(i) the current state of technical knowledge, z(ii) the requirements of environmental protection, and z(iii) the application of measures for these purposes, which do not entail excessive costs, having regard to the risk of significant environmental pollution which, in the opinion of the Agency exists; z( b ) in any other case, in addition to the matters specified in paragraph (a)— z(i) the nature, extent and effect of the emission concerned, z(ii) the nature and age of the existing facilities connected with the activity and the period during which the facilities are likely to be used or to continue in operation, and z(iii) the costs which would be incurred in improving or replacing the facilities referred to in subparagraph (ii) in relation to the economic situation of activities of the class concerned.

BAT under IPPC Directive zBest Available Techniques shall mean the most effective and advanced stage in the development of activities and their methods of operation which indicate the practical suitability of particular techniques for providing in principle the basis for emission limit values designed to prevent and, where that is not practicable, generally to reduce emissions and the impact on the environment as a whole: - 'techniques` shall include both the technology used and the way in which the installation is designed, built, maintained, operated and decommissioned, - 'available` techniques shall mean those developed on a scale which allows implementation in the relevant industrial sector, under economically and technically viable conditions, taking into consideration the costs and advantages, whether or not the techniques are used or produced inside the Member State in question, as long as they are reasonably accessible to the operator, - 'best` shall mean most effective in achieving a high general level of protection of the environment as a whole.

Bref and Seville zThe European IPPC Bureau has been established in Seville to undertake publication of BAT Reference (Bref ) guidance documents for the various industrial sectors covered by the IPPC Directive. zTo date guidance has been finalised for about 12 sectors with a further 20 sectors planned or underway. zThese can be found at

Requirements of IPPC Directive (96/61/EC) - 1 zAll the appropriate preventive measures are taken against pollution, in particular through application of best available techniques (BAT); zNo significant pollution is caused; zWaste production is avoided in accordance with Council Directive 75/442/EEC; where waste is produced, it is recovered or, where that is technically and economically impossible, it is disposed of while avoiding or reducing any impact on the environment;

Requirements of IPPC Directive (96/61/EC) - 2 zEnergy is used efficiently; zThe necessary measures are taken to prevent accidents and limit their consequences; zThe necessary measures are taken upon definitive cessation of activities to avoid any pollution risk and return the site of operation to a satisfactory state.

Requirements of IPPC Directive - What the permit must include - 1 zMeasures to ensure that the installation is operated using BAT, meets any relevant EQS and is operated in accordance with the obligations on the operator outlined in Article 3 above. zMeasures to take account of any relevant matters in an EIS. zELV’s (and/or equivalent parameters or other technical measures) for those pollutants where significant quantities are likely to be emitted, in particular those substances listed in Annex  of the Directive.

Requirements of IPPC Directive - What the permit must include - 2 zELV’s are to be based on BAT having regard to the location of the installation and the state of the local environment. In all circumstances the conditions of the permit shall contain provisions on the minimisation of long-distance or transboundary pollution and ensure a high level of protection for the environment as a whole. zA suitable monitoring programme for emissions that will detail the frequency and methodology used and an obligation to supply data to the competent authority. z Arrangements for emergencies and incidents to ensure safe shut down of installation. zAny other conditions that the competent authority considers necessary.

Energy Conditions - 1 z9.1The licensee shall carry out an audit of the energy efficiency of the site within one year of the date of commencement of site activities. The licensee shall consult with the Agency on the nature and extent of the audit and shall develop an audit programme to the satisfaction of the Agency. The audit programme shall, as a minimum, identify opportunities for energy use reduction and efficiency.

Energy Conditions - 2 z9.2 The audit programme shall be submitted to the Agency in writing at least one month before the audit is to be carried out. A copy of the audit report shall be available on-site for inspection by authorised persons of the Agency and a summary of the audit findings shall be submitted as part of the Annual Environmental Report. The energy efficiency audit shall be repeated at intervals as required by the Agency.

What Will Happen zDOELG will publish EPA Amendment soon. zSome new sectors/types of activity will require licenses. zMost existing IPC licenses will require revision. zDeadline:30 October 2007.

Miscellaneous zKyoto zCarbon trading and taxes zNational Ceilings zSO 2, NO x, NH 3 and VOCs zNational Plans under LCP and Solvents Directives zWaste Incineration Directive zRevisions to existing licences zRequirements for waste to energy plant