Integrating Construction, Demolition, and Recycling By: Brooke Morgan At this time in Northwest Arkansas, thousands of tons of valuable resources are being.

Slides:



Advertisements
Similar presentations
Construction & Demo Waste. Landfilling Waste is a Big Deal A study shows 28.7% of waste placed in landfills is construction & demolition waste (C & D.
Advertisements

RECYCLING A Rough Guide.
Recycling Program Benefits: New Products & Environmental Savings Iowa State University February 8, 2007.
Kekaha, Kauai What a Waste!. We live in a finite environment … Can we continue to WASTE it?
Recycling is The Right Thing to Do! Use as raw materials for new products.Saves energy & reduces greenhouse gases.
BRUSH and BULK COLLECTION MODIFICATIONS SOLID WASTE SERVICES Department of Public Works City of Temple September 2006.
Miss Nelson SCIENCE ~ CHAPTER 12 ENERGY AND MATERIAL RESOURCES.
Construction and Demolition Waste Management at UVM
Building for theBy Recycling Industrial Materials Industrial Materials Recycling Kimberly Cochran, PhD US EPA Office of Solid Waste AGC Building Division.
Construction + Demolition Waste Trends Trends in Construction and Demolition Waste in Oregon AOR Construction and Demolition Recycling Forum March 15,
Waste Recycling Maciej Kowalski Arkadiusz Kowalski Publiczne Gimnazjum nr 2 w Staszowie.
Solid Waste and Recycling
Mountain of Trash: Are They Sustainable
Composition of Municipal Waste
Sustainability and the Breuer Building Sustainability and the Breuer Building The Cleveland Green Building Coalition
SOLID WASTE MANAGEMENT
Kekaha, Kauai What a Waste!. We live in a finite environment … Can we continue to WASTE it?
Construction Waste & Recycling.  Construction waste is one of largest waste streams in U.S. It takes up 25%- 45% waste in national landfill.  According.
WASTE. Dirty Jobs  Land Fill Fresh Kills Landfill  Located in New York, New York  Last landfill in New York City, covering over 3,000 acres.
Material and Waste. Materials Management Planning of material use, material reuse, material reduction and recycling begins in the first stage of a project.
Salvage: It’s like destroying things, Only a lot gentler Blake Rainville Thomas Pinello Eammon Coughlin Peter Connelly.
Construction and Demolition Waste Reduction Management and Practices University of Santo Tomas College of Architecture.
Miami Dade Resources Recovery Facility Operated By: Montenay Power Corporation.
Solid Waste. Trash Facts  The average person produces about 2 kilograms of trash daily.  Every hour, people throw away 2.5 million plastic bottles.
RECYCLING IN SCHOOLS BY BRITTANY JACKSON
Earth Week 2010 Reduce, Reuse, Recycle, Repeat, Rejoice RECYCLE.
Recycling By: Ben Hearn Josh Hamilton Harley Chesser.
John Gundling. AGENDA  Eco One Solutions  Offered Services  Environmental Impact  C&D, The Connecticut Example  Achieving Exemplary Performance.
Waste Chapter 19.
Waste.
Green Recycling Network Toward a Greener Tomorrow... Today!
Armstrong World Industries Ceiling Tile Recycling Neal McDwyer Recycling Manager Hi I am Anita Snader from Armstrong World Industries, Commercial Ceilings.
Recycling and Reuse Policy for C&D Waste Justin Green Program Director Build It Green!NYC.
War on Waste SC.912.L Waste management strategies Recycling and reuse- Recycling allows the reuse of glass, plastics, paper, metals, and other.
Recycling involves processing used materials into new products in order to  prevent waste of potentially useful materials  reduce the consumption of.
Greg Shinaut Black Hills Energy City of Lincoln – Green Practices Consultant.
A PROSEED2GREEN PRESENTATION Garbage’d Out. What really is “garbage”? gar·bage/ ˈ gärbij/ Noun: 1. Wasted or spoiled food and other refuse, as from a.
Health Talent 21 project By: Abby Bonsall Mr. Aleszczyk Period 2.
WASTE MANAGEMENT AND RECYCLING 1. SOLID WASTE MANAGEMENT 2.
Today’s Topic Garbage. Americans are #1 The United States is the #1 trash-producing country in the world at 1,609 pounds per person per year. This means.
Solid and Hazardous Waste. Solid waste : any unwanted or discarded material we produce that is not a liquid or gas. Municipal solid waste (MSW): produced.
Construction and Demolition Waste Management at UVM.
Angelina Pellegrini Marketing Presentation June 2010 Angelina Pellegrini Marketing Presentation June 2010 Mission Trail Waste Systems Waste Management.
 Recycling helps our environment stay clean.  An enormous progress has been made over the year because of the bins.  They ordered paper, cans, cardboard.
The Givin g Tree Tips to Save the World and Save Money Eat fish that is caught in an environmentally responsible manner. This helps to keep the marine.
Grant Agreement Reference Number: LLP-ERA-IP-2011-LT-0580 Recycling in Denmark Agenda -Presentation of IP Project „Sustainable Design – Eco Friendly Products“
DOLLARS AND SENSE SALVAGE Spawning Economic Development from Material Recovery.
Environmental Science CH. 24 Notes Solid and Hazardous Wastes.
Municipal waste WASTE MANAGEMENT AND TECHNOLOGY Martin Kubal
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Return to Source Separated Recyclables Fairfax.
Recycling C&D Waste Instead of Landfilling. What CAN Be Recycled? Dirt Cardboard Drywall HDPE (5 gallon buckets) Clean white wood Metal Brick block and.
Minimizing Waste – The Harvard Blackstone UOS Project John Gundling, LEED AP The Institution Recycling Network 7 South State Street Concord, NH
1 Solid and Hazardous Waste Chapter 21 Living in the Environment, 13 th Edition, Miller.
What is sustainability? Define sustainability. Draw the 3 circles of sustainability.
Pollutants via land media. Hazardous waste Hazardous waste is waste that is dangerous or potentially harmful to our health or the environment. Example.
Incinerators, Landfills & Waste in the Commonwealth Local Environmental Action 2017 Northeastern University Kirstie Pecci, Senior Fellow (617)
Recycling in Cherokee County, IA
Trashed world.
CITY OF GAINESVILLE SOLID WASTE DIVISION
Foundations of Technology Construction
Major Steps In Building a SFR
City of Durham Solid Waste Management
Fauquier County’s Journey of Construction and Demolition
How the role of Recycling affects
How the role of Recycling affects
How the role of Recycling affects
Foundations of Technology Construction
Combustion Consequences of Solid Waste
How the role of Recycling affects
Presentation transcript:

Integrating Construction, Demolition, and Recycling By: Brooke Morgan At this time in Northwest Arkansas, thousands of tons of valuable resources are being dumped in the Tontitown landfill. These resources take up finite landfill space and are being kept out of the economic loop. The closed portion of the Tontitown landfill is over sixty acres in diameter and roughly eleven stories tall. The Tontitown landfill contains both class 1 and class 4 waste streams.

Defintion of Class 1 Landfill ● More commonly known as trash or household garbage, MSW (Municipal Solid Waste) consists of the non-hazardous waste we use every day. A Class 1 landfill is where the items we throw away is buried after being picked up by garbage trucks. Product packaging, plastic bottles, food scraps and newspaper from our homes, schools and businesses are dumped in Class 1 category landfills. *

Definition of Class 4 Landfill ● A Class 4 landfill area will contain waste building materials, deredging materials, tree stumps, and rubble resulting from construction, remodeling, renovation, repair, and demolition of homes, businesses and other commercial buildings, structures and pavements. Some of these materials may contain lead, asbestos, or other hazardous materials.

Class 4 Waste (Continued) ● Even if people take into consideration that what we use in our houses goes to the landfill, we may not necessarily think of how much waste is accumulated in the building of our homes. ● C&D debris consists of materials such as concrete, wood, asphalt, gypsum, metals, bricks, glass, and plastics; along with salvaged components such as windows, doors, and plumbing fixtures. ● Most C&D waste ends up in a landfill. Only approximately 10% is recovered for other usage.

MSW Generation**

This is a closed portion of the Class 1 area in the Tontiown landfill.

This is the Class 4 landfill area. This is separate from municipal solid waste (MSW); however, it is still a huge concern.

This Is Our Class 4 Landfill While visiting the Tontitown landfill, within thirty minutes five garbage trucks unloaded between six and fifteen tons of waste each. This process continues from sunup to sundown.

C&D Pie Chart** Few of these resources are recycled; 90% are sent to landfills.

How Big a Piece of the Waste Stream Pie is Construction and Demolition?** As is evident from the pie chart, construction and demolition trash accounts for approximately 17% of landfill waste.

Waste Facts ● The Tontitown landfill is the only landfill in Northwest Arkansas. ● The Tontitown community receives $1.50 for every ton of garbage interred in the landfill. ● Up to 33 million tons of waste have been saved from landfills and incinerators across America from 1990 to 2000.

Construction and Demolition and the Waste It Creates ● For my service learning project, I learned about the different stages of residential construction. The following slides present the different phases of construction and the waste produced by each stage.

● Framing the house takes about two weeks, weather permitting. Debris and wood scraps of all shapes and sizes are discarded. Some wood scraps are treated though most are not. Small wood scraps could be turned into pellets for wood-burning stoves. First Phase of Construction

Second Phase of Construction ● Mechanics take about 2-3 weeks. This is when the plumbing, heat and air get put in, as well as the electrical. At the same time, the brick, siding and roof are being installed. Debris from this phase include cardboard, PVC, copper, other types of metal, excess wiring, and plastic wrappings that packaged the fixtures.

Third Phase of Construction ● Dry-in takes 4-5 days. During this phase, the roof gets tar-papered and shingled. Accumulated debris includes asphalt shingles and tar-paper.

Fourth Phase of Construction ● Roughing-In – Involves the installation of sheet rock and insulation. This phase lasts 2-3 days. ● Leftover sheet rock and insulation scraps account for debris amassed during the Roughing-In stage.

Final Phase of Construction ● “Finishing Out” - During this phase, enough debris is accumulated to fill a two-car garage. ● From this phase of construction, materials such as cardboard, shrink-wrap, and Styrofoam from all of the electrical fixtures and appliances account for the collected waste.

Challenges of Removing Construction Debris from the Job Site ● The space on site; ● The space in the street; ● The weather; ● The scheduling of different subcontractors; ● Having a reliable mobile unit to remove the debris in a timely manner.

Solutions for Removing Construction Debris from a Job Site ● An independent firm with flexible laborers, able to remove construction waste at any given time. ● Senior citizens who are able to pick up, and subsequently utilize, lumber scraps, et cetera for projects. ● Have Eagle Scouts earning badges to participate in a construction site clean up project. ● An on-site mulcher owned by the primary contractor to mulch leftover wood debris.

Conclusion ● Many people think about Class 1 waste, the waste that results from daily living. However, few people outside builders and contractors think about all of the Class 4 waste, which is waste generated during the construction, renovation or demolition of a home or business. ● Class 4 waste has value that isn't being realized. By landfilling this waste we are keeping valuable resources out of the economic loop. ● There is an entrepreneurial opportunity for someone who is able to figure out how to remove items from the construction site and be able to place the assets in an appropriate market place.

Special Thanks ● Louise Mann ● Mikel Lolley ● Gavin Edwards ● John Frank

Sources ● United States Environmental Protection Agency website for facts and defintions (epa.gov) ● Louise Mann ● Gavin Edwards ● **Google Images for charts