Bob Mashburn Army Regional Environmental Office Atlanta, Georgia ARMY CLEANUP PROGRAM – Status Update –

Slides:



Advertisements
Similar presentations
Certification of Compliance By Evita Lagard
Advertisements

Stanlick Sewer Treatment Plant Upgrade Implementation Date: September 1, 2008.
BoRit Superfund Site Timeline
Office of the Under Secretary of Defense (Installations and Environment) Environmental Management Directorate MRSPP Review & Update (and other Good Stuff)
Claremore Medical Office Building From Landfill to Medical Office Building A Brownfield Success Story THE GREEN SIDE OF BROWNFIELD REMEDIATION.
SWMU 48, 62 and AOC G/SWMU 49 Update Joint Base Charleston Weapons Partnering Meeting December 4, 2013.
Welcome “Sewers – The Key to Hauppauge Revitalization: The Next Economic Boom ” 1 June 23, 2010.
2009 ENVIRONMENTAL SEMINAR Boat Bottom Pressure Washing Requirements & General Permit for the Discharge of Stormwater Associated with Industrial Activity.
Great team work. Ecomaster 9 years of activity on Romanian environmental services market with result of positioning as one of the major national providers.
Department of Defense Facilities Unit Hazardous Waste Management Program of the EPD Land Protection Branch.
DEPUTY DESIGNATED FEDERAL OFFICIAL PRESENTATION JOEL BRADBURNE, PORTS SITE LEAD U.S. DEPARTMENT OF ENERGY Portsmouth Site Specific Advisory Board September.
California Integrated Waste Management Board 1 Agenda Item 5 (Committee Item F) September 8, 2008 Agenda Item 5 (Committee Item F) September 8, 2008 Consideration.
OVERVIEW OF SOLID WASTE MANAGEMENT IN MALAYSIA by Nadzri Yahaya, Ph
PROJECT OVERVIEW FM Budget € Total contracted € –EU Grant € –National Co-financing –Total contracted /
MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010.
Facility Lead Corrective Action Opportunities with Union Carbide RCRA National Meeting May, 2005 Bob Greaves EPA Region 3.
COL Mark UNCLASSIFIED 13 August 2013 US Army Environmental Command SAME Presentation 20.
Scott Surovchak Rocky Flats Site Manager U.S. Department of Energy (DOE) Office of Legacy Management (LM) Cleanup and Remedy Implementation at the Rocky.
Agricultural Education. Georgia Ag Ed Pathways Peach State Pathways PathwayDevelopment Date Implementation Date Phase I Agriscience
Assistant Chief of Staff for Installation Management Recent Successes 1 Environmental Remediation –Approximately $1B of environmental remediation remains.
Regional Water Council Planning Update Dargan “Scott” Cole Hall Booth Smith & Slover, P.C. 191 Peachtree Street, Suite 2900 Atlanta, Georgia
Military Redevelopment – Kelly AFB to Port of San Antonio Tim Underwood Deloitte Consulting LLP May 2012.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
SITE STATUS UPDATE TOP STOP PETROLEUM RELEASE SITE GUNNISION, UTAH Morgan Atkinson – Division of Environmental Response and Remediation, Project Manager.
Bijou Erosion Control Project Project Kickoff TAC Meeting May 4, 2007 City of South Lake Tahoe ENTRIX, Inc. California Tahoe Conservancy.
Former DuPont Barksdale Works Project Update May 19, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Tier I: Module 5 CERCLA 128(a): Tribal Response Program Element 4: Verification & Certification.
Corrective Action Program: Working with Your Local Agency to Solve Local Problems James Clay County of San Diego Department of Environmental Health Site.
NASA Ames Research Center Environmental Services Division Code QE Presolicitation Conference These slides do not contain a complete summary of the Draft.
By Mitch Cooper & Haley Herbert January 1987 Vertac site manufactured herbicides 1978 National Dioxin Survey 1983 Site placed on the National.
Name/Office Symbol/(703) XXX-XXX (DSN XXX) / addressDate-Time-Group 19 September 2008 Fort Monroe Closure Environmental Planning.
Intervention – 2004 Nanisivik Reclamation and Closure Plan Arctic Bay June 3-4, 2004 Nunavut Water Board Public Hearing.
1 RAB Update Trap and Skeet Range 17 Remedial Investigation Activities 25 March 2010.
ISPA Measure 2002 BG 16 P PE 016 Varna Integrated Water Project Transformationof Transformation of WWTP Asparuhovo Reconstruction of WWTP Varna ReconstructionofWS&
Division of Waste Management Dexter R. Matthews, Director Mission: to prevent harmful releases of waste to the environment and clean up existing contamination.
Sustain Noblesville Committee September 19, 2011 Thomas W. Easterly, P.E., DEE, QEP Commissioner, Indiana Department of Environmental Management.
The Dalles, Industrial Certification Northwest Aluminum Company The Dalles, Oregon Douglas C. MacCourt Ater Wynne LLP US German Bilateral Working.
The City of Rochester New York Environmental Institutional Control System Prepared By: Mark Gregor City of Rochester, New York Division of Environmental.
1 Energy/Compost Facility Action Plan City Council Meeting July 2, 2012.
Beth Blalock, Asst. Chief Land Protection Branch GEORGIA EPD LAND PROTECTION BRANCH UPDATE MARCH 2016.
Farmland Industries Lawrence Site Briefing for the City of Lawrence March 11, 2008 March 11, 2008.
GEORGIA PACIFIC WEST PROPOSED INTERIM ACTION Public Meeting & Open House – July 12, 2011.
Calcasieu Parish Mechanical Treatment Plant Inspection Program Calcasieu Parish Division of Planning and Development November, 2011.
Date #, 2009Presenter Name Response and Remediation Program Update March 29, 2016Jason Metzger, Program Manager.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
Response and Remediation Program
Proposed Plan for No Further Action
Environmental Cleanup Program Status
General Permits and General Operating Permits under construction
Deferred Maintenance Deferred Maintenance
Underground Storage Tanks New Federal 2015 Requirements
Presentation to the Livingston City Council on the Phase II MS4 Permit
Petroleum Storage Tanks – Program Updates
Environmental Cleanup Program Status
Chemical Metals Industries, Inc. (CMI)
GTEC 2017 Annual UST Management & Compliance Assistance Seminar
Wurtsmith Restoration Advisory Board Meeting
Attendance, Introductions & Correspondence Old Business
Georgia Update Jeff Cown Land Protection Branch
Department of Environmental Quality
Advanced Environmental Management (AEM) Training Phase I
Ohio EPA, Division of Surface Water
Water & Environmental Affairs
Branch Organization Chuck Mueller, Branch Chief
Air and Water Management Association Regulatory Conference Symposium
Chemical Metals Industries, Inc. (CMI)
Wastewater Permitting Updates
Petroleum Storage Tanks – Program Updates
the path less traveled Termination of Post Closure Care
Post Point Treatment Plant Resource Recovery Project Update
Presentation transcript:

Bob Mashburn Army Regional Environmental Office Atlanta, Georgia ARMY CLEANUP PROGRAM – Status Update –

BRIEFING OUTLINE General Overview Summary Status Further Assessments Investigations FY10/11 Projects Contract 2010

ARMY CLEANUP PROGRAM – FY10 Active and Excess Installation Budget – Total FY10 Budget = $483.8M IRP Projects = $234.8M CR Projects = $52.2M MMRP Projects = $136.9M DSMOA = $8.2M Program Management = $51.7M Projects Subtotal for Region 4 17 installations = $38M

MSAAP – GENERAL OVERVIEW First and only ammunition plant built by the U.S. Army in 30 years (since 1953) July 7, 1978 – Army obtained a 50 year irrevocable permit from NASA to construct and operate MSAAP 1981 – RCRA Part A Permit application submitted for treatment of explosive waste March 31, 1983 – MSAAP Dedicated May 1983 – First production projectile metal parts assembly September 9, 1983 – RCRA operating permit was issued jointly to the U.S. Army (MSAAP) and Mason Chamberlain, Inc. May 1984 – Live loading began 1990 – DoD placed MSAAP on inactive status/layaway August 6, 1992 – Last munitions/explosive contaminated sump sludges processed 1992 – MSAAP became an industrial park

MSAAP – GENERAL OVERVIEW – Cont’d September 9, Explosive Waste Incinerator (EWI) operating permit expired - not renewed 1993 – EWI and associated sumps decontaminated in accordance with the closure plan September 6, 1994 – EWI closed under RCRA Subpart G, Part 264 September 27, 1994 – MDEQ-OPC approves Closure Plan October 7, 1994 – Verification plan was implemented November 1994 – EWI Closure Certification Report was submitted to MDEQ. The Closure Certification Report was reviewed by MDEQ and closure was verified March 4, 2009 – MSAAP was deactivated on as part of the Base Realignment and Closure, 2005Base Realignment and Closure, 2005 July 29, Official deactivation ceremony

MS AAP - Summary Status July 2009 – Army completed decon/demolition of Industrial Wastewater Treatment Plant – ECC Draft Closure Report dated July 16, 2009 – “Final” Closure – MDEQ Approval letter dated August 5, 2009 MSAAP – April 2008 Final SI Report – NFA 9100 Area Water Tower Deionized Water Cooling Tower Motor Pool and Maintenance Mechanical Plant Parcel 13 [7] Sandblasting/Painting Area

MSAAP – FURTHER ASSESSMENTS 9100 Area Central Flammable Storage Drainage Canals Projectile metal Parts Tank Farm/Freon Recovery Building Forge Lube SAA/ESP Separator 9400All of this area Parcel 12 [7] Explosives Waste Incinerator HR (Additional Reports/Records – Closure 1994)

FURTHER GW INVESTIGATIONS 9100 Area Overhead Waste Transfer Piping Scrap metal Storage Inert Waste Processor Cargo Metal Parts Vehicle Wash Rack/FGD Bldg Industrial WWTP Parcel 11[7] Contaminated Waste Processor HRPR

MSAAP – FY10/11 Projects MSAAP Plume associated with the old Projectile Metal Parts operations. Project involves installation of monitoring wells, sampling over 8 quarters/vapor intrusion study. MMRP project at the Spin Launch site. Additional analysis and site activities at the following areas: Area (Groundwater, Vapor Intrusion, Drainage Canals) Area (Spin Launch Site) -Forge Lube Satellite Accumulation Area

MSAAP Contract – 2010 HTRW Remedial Investigation/Feasibility Study ~ $600K MMRP Remedial Investigation/Feasibility Study ~ $1 M Follow-on Tasks (If required – FY11 – beyond) Contract Period – Apr 2010 – May 2013 Estimated Completion Date of BRAC- Compliance at Installation (including LTM phase): Dec 2012

CONTACT INFORMATION Bob Mashburn Regional Project Manager Deputy Assistant Secretary of the Army (Environment, Safety & Occupational Health) - DASA (ESOH) 101 Marietta Street, NW, Suite 3120 Atlanta, GA