A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Office of Science U.S. Department of Energy Streamlined.

Slides:



Advertisements
Similar presentations
Radiation Safety Training Lab Survey Program Washington State University Radiation Safety Office.
Advertisements

PHILOTECHNICS Decommissioning Radiological Laboratories in California CCRSO Conference October 5, 2007 Presented by: Jon Dillon, M.S.
1 Midland Community Meeting Michigan Department of Environmental Quality Steven Chester, Director Jim Sygo, Deputy Director.
1 Transuranic Waste Processing Center Karen Deacon, Deputy Federal Project Director Oak Ridge Office of Environmental Management.
Shoreline Cleanup and Assessment Technique (SCAT) Simple and comprehensive way to perform a survey of an affected shoreline Systematic approach using standardized.
U.S. Environmental Protection Agency Lovers Lane Lead Site Jeffrey A. Lippert, OSC.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Office of Science U.S. Department of Energy Risk-Based Regulation.
Disposal of Unused or Expired Drugs Attorneys General Education Program Public Policy Conference THE PHARMACEUTICAL INDUSTRY: ECONOMICS, REGULATION, AND.
What do Workers in the Field Need to Know About NORM/TENORM
Pulse Drying What is it?. Pulse Drying Pulse drying is a relatively new technique for rapidly drying high moisture/medium solids feed streams into a much.
Low-Level Waste Advisory Committee Meeting October 2, 2014 TENORM Study Update 3 rd Quarter Tom Corbett, Governor E. Christopher Abruzzo, Secretary.
Location In the mountain of Colorado consist of numerous sites in Denver area which contaminate with radioactive soils and Debris. There are about 65.
Estimating forest structure in wetlands using multitemporal SAR by Philip A. Townsend Neal Simpson ES 5053 Final Project.
Clean-up at BP Paulsboro New Jersey (USA) Roxane Fisher and Mark Ferguson.
World Health Organization
Green Remediation An Overview of the State of the Practice
The Role of Health Physicists in Uranium Site Cleanups Alisha Stallard, Environmental Health Physicist Radioactive Materials Division Texas Commission.
Colorado School of Mines Research Institute Site DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY AND PROPOSED PLAN.
Measurement and Survey Protocols Defining and Identifying Radioactive Materials.
.
DRAFT Field Sampling Guidance To be used this field season by DEC and consultants Initial focus on soil, groundwater, and vapor intrusion Future versions.
Measuring Results In Pay For Performance Cleanups Brian Dougherty Florida Department of Environmental Protection.
Bapetco NORM Control Case Study IDENTIFY ASSESS CONTROL & RECOVERY.
Newport Terrace Landfill (Continuous Gas Monitoring System)
1 of 25 The EPA 7-Step DQO Process Step 5 - Define Decision Rules 15 minutes Presenter: Sebastian Tindall DQO Training Course Day 2 Module 14.
 EPA’s soil sampling objectives  Technical approach  Technical assistance to DTSC/DOE  Next Steps and Schedule.
Managing Environmental Data for Conceptual Site Models Dr. David W. Rich Indianapolis, IN February 26, :45 – 3:30.
GFOA PS3260 Contaminated Sites Workshop Thursday, November 14, 2013 Whitehorse, YT.
Decontamination of filed equipment used in environmental site characterization and ground-water monitoring projects University of Arkansas 11/13/2006 By.
Developing Monitoring Programs to Detect NPS Load Reductions.
Triad Approach / Best Management Practices. Triad Approach and BMPs Systematic Planning – Conceptual Site Model (CSM) Dynamic Work Strategies Real-Time.
Radium Removal and Disposal in Wisconsin
CRITICAL PATHWAY ANALYSIS FOR RADIOLOGICAL IMPACT CONTROL AND ASSESSMENT Riaz Akber
Review of Work Plan for Leaded Gasoline Tank Bottom Disposal Pit Assessment and Interim Stabilization Measures Presented by The Great Plains/Rocky Mountain.
ERLN OPERATIONAL FRAMEWORK EPA Quality Management Conference Presented By: Sean Kolb Schatzi Fitz-James and Terry Smith, OEM Sean Kolb and Lisa Modigliani,
RADIOACTIVITY IN VIRGIN SOILS AND SOILS FROM SOME AREAS WITH CLOSED URANIUM MINING FACILITIES IN BULGARIA Ivanka Yordanova, Lidia Misheva, Martin Banov,
April 2012 Improving Remediation Planning through Effective Mine Material Delineation Formosa Mine Superfund Site, Douglas County, OR Mark Nelson PG Nicholas.
1 of 37 Key Concepts Underlying DQOs and VSP DQO Training Course Day 1 Module 4 (60 minutes) (75 minute lunch break) Presenter: Sebastian Tindall.
OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION February 18, 2012.
Why Participate in the WLA? Utility Perspective Preparation Emergency Response Plan Resources.
West Valley Demonstration Project Environmental Characterization Services Contract Update November 14, 2012 Zintars Z. Zadins, Ph.d. U.S.
Module 6: Alternatives. 2  Module 6 contains three sections: – 6.1 Development and Screening of Alternatives – 6.2 Detailed Analysis of Alternatives.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
Pacific Northwest National Laboratory U.S. Department of Energy National Security Issues Underground Harry Miley National Security Directorate Pacific.
Office of Science U.S. Department of Energy U.S. Department of Energy’s Office of Science The Office of Science Role in Environmental Cleanup Dr. James.
Introduction to the EPA 7-Step DQO Process
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
Stellenbosch University
1 of 27 The EPA 7-Step DQO Process Step 5 - Define Decision Rules (15 minutes) Presenter: Sebastian Tindall Day 2 DQO Training Course Module 5.
Chapter 29 Supercritical Fluid Chromatography and Extraction.
TENORM Radiation Safety From Oil and Gas Production
Argonne National Laboratory Experience and Perspectives on Environmental Remediation Karen P. Smith Environmental Science Division Argonne National Laboratory.
Managed by UT-Battelle for the Department of Energy Authorized Limits Request for Release of Neutron Scattering Experiment Samples From SNS and HFIR Donald.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Nuclear Engineering Division Argonne National Laboratory.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Siting Strategies.
James River at Richmond, VA. Semi-Permeable Membrane Devices (SPMD’s) for Sampling Dissolved Organic Substances from Surface Waters Don Smith Virginia.
J. R. Giles, C. P. Oertel A Comprehensive Study of the Depth Profile of Cs-137 in Surface Soils at the Idaho National Laboratory Monitoring and Surveillance.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
1 of 48 The EPA 7-Step DQO Process Step 6 - Specify Error Tolerances 3:00 PM - 3:30 PM (30 minutes) Presenter: Sebastian Tindall Day 2 DQO Training Course.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
Improving The Quality of Site Characerization Jennifer Griffith Northeast Waste Management Officials’ Association.
Laboratory Decommissioning : Essential Tools and Lessons Learned Jim Carscadden Division of Environmental Protection Office of Research Facilities.
Jeffrey Lively Chief Scientist Radiological Services & Engineering Amec Foster Wheeler.
M. Koestlbauer, V. Nizhnik SGTS/TND G. Sheppard SGCP/CTR
TENORM Study Update Presented by Rich Janati on behalf of Dave Allard
AFPC Policy Protect its personnel, contractors,3rd parties and the environment against the hazards of exposure to ionizing radiation due to AFPC activities.
Deyuan Kong and Sara Mcmillen, Chevron Energy Technology Company USA
Managing Environmental Data for Conceptual Site Models
Regulatory Changes and Industry Engagement
Objectives Provide an overview of the triad approach and its application Describe the elements of the triad approach for practical application Describe.
Presentation transcript:

A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Office of Science U.S. Department of Energy Streamlined Approaches to Characterizing NORM-Contaminated Sites Can Translate into Significant Cost Savings K.P. Smith, R.L. Johnson, and J. Quinn Environmental Assessment Division Argonne National Laboratory

Pioneering Science and Technology Office of Science U.S. Department of Energy 2 Sampling Programs Are Key Components of All Environmental Restoration Processes Preliminary site assessment Extended site investigation Corrective action study Remedial action Closure Multiple steps in a restoration project involve environmental sampling and analysis: Traditional sampling and analysis programs are expensive and time-consuming.

Pioneering Science and Technology Office of Science U.S. Department of Energy 3 Adaptive Sampling and Analysis Programs (ASAP) Can Cut Costs Significantly Approach Real-time sample analysis Rapid on-site decision making Requirements Field analytical method Decision support on site Advantages Reduce cost/sample Reduce # of samples Reduce # of events Better characterization Allows in situ soil segregation

Pioneering Science and Technology Office of Science U.S. Department of Energy 4 ASAP Decision Support Has Three Distinct Phases Assemble Baseline Information Base maps Geological information Existing sampling data Make Quantitative Decisions On Site Extent of contamination Where to stop When to stop Make Qualitative Decisions about Data Management Data integration Data visualization Data dissemination

Pioneering Science and Technology Office of Science U.S. Department of Energy 5 Can ASAP Efficiencies Be Realized at a NORM Site? Oil and gas production and processing activities can cause NORM to accumulate above natural background levels. Radionuclides: Ra-226, Ra-228, and their decay products Waste streams: produced water, scale, sludge, equipment, surface soils

Pioneering Science and Technology Office of Science U.S. Department of Energy 6 NORM Cleanup Requirements in the U.S. Typical NORM cleanup criteria: Averaged over 100 m 2 Ranges from 5 to 30 pCi/g (0.185 to 1.1 Bq/g) Ra-226 or Ra-228 above background Sometimes two different limits based on radon emanation rate

Pioneering Science and Technology Office of Science U.S. Department of Energy 7 NORM Case Study: Michigan Site 1.4-hectare pipe handling facility NORM contamination in surficial soils: Ra-226 activity levels into the tens of thousands of pCi/g State guidelines require remediation to 5 pCi/g (0.185 Bq/g) averaged over 100 m 2 About 27 m 3 of soil previously excavated and drummed based on gross activity screens

Pioneering Science and Technology Office of Science U.S. Department of Energy 8 The ASAP Approach Is Ideal for NORM- Contaminated Soils Large number of field screening, direct measurement, and field analytical methods: Combined walkover/GPS systems for gross activity Stationary in situ NaI instruments Stationary in situ HPGe measurements Mobile laboratories with gamma spectroscopy capabilities

Pioneering Science and Technology Office of Science U.S. Department of Energy 9 Gamma Walkover Surveys Provide Inexpensive, Comprehensive, Qualitative Information Sodium Iodide (Na I) sensor  measures total activity High detection efficiency, low energy resolution Collects data at 2 second intervals, generating hundreds to thousands of data points per acre Inexpensive: pennies per data point Combined with differential GPS systems to visualize walkover results

Pioneering Science and Technology Office of Science U.S. Department of Energy 10 Direct NaI Measurements Can Provide Estimates of Ra-226 Concentrations RadInSoil TM provides Ra-226 concentrations (pCi/g) for surface soils based on 5–10 min. readings Instrument needs to be calibrated to background at the site and assumes no other decay chain exists above background Per measurement costs on the order of $10–20 per data point Requires little training to operate

Pioneering Science and Technology Office of Science U.S. Department of Energy 11 In Situ HPGe Measurements Provide Accurate, Isotope-Specific Concentrations In situ High Purity Germanium (HPGe) gamma spectroscopy provides accurate, isotope- specific concentrations for surface soils Concentrations hold for the “field of view” of the instrument Costs are on the order of $100 per measurement Requires trained operator Low detection efficiency, high energy resolution

Pioneering Science and Technology Office of Science U.S. Department of Energy 12 Relationships between Gross Activity and Cleanup Criteria Are Key Decisions are binary — either cleanup soil or leave behind Want to identify “trigger” levels that can be used to carve up the site based on gross activity information Makes use of nonparametric approach with no assumptions about linear correlation Use paired information to do the analysis

Pioneering Science and Technology Office of Science U.S. Department of Energy 13 ASAP Process for Michigan Site Step 1: Complete Gamma Walkover Step 2: Develop Relationship between Gamma Walkover Data and Cleanup Criteria Paired gross activity to RadInSoil measurements collected at 49 sites Established trigger levels for 5-pCi/g cleanup criterion: 1,800–2,500 cpm

Pioneering Science and Technology Office of Science U.S. Department of Energy 14 ASAP Process for Michigan Site Three areas: likely clean, likely contaminated, and uncertain based on available data Step 3: Divide Site on Basis of Trigger Levels Average data over 100 m 2 using moving window averages on gamma walkover data

Pioneering Science and Technology Office of Science U.S. Department of Energy 15 ASAP Process for Michigan Site Step 4: Remediate and Rewalk Verification of “uncertain” areas with in situ HPGe Selective removal of “hot” spots across site Rewalk with gamma walkover surveys and reshoot with HPGe to confirm clean Note: The site was not cleaned up to background but was brought into compliance with state guidelines: 5 pCi/g Ra-226 averaged over 100 m 2.

Pioneering Science and Technology Office of Science U.S. Department of Energy 16 The Michigan Case Had Positive Results Excellent agreement between off-site confirmatory sample results and on-site analytics Reduced disposal costs  possibly as much as $36,000 less Significant analytical cost savings  about a 90% savings using in situ analytical capabilities Compressed time line because remediation was integrated with characterization

Pioneering Science and Technology Office of Science U.S. Department of Energy 17 For more information: Final report available from: Download in PDF format from “ More information available from: Bob Johnson Karen P. Smith , ext. 267 Consistent with Triad approach being recommended by the USEPA: