8-3-05Jens Jørgen Gaardhøje. NBI. ALICE-CR5 1 ALICE Forward Detectors Technical Design Report Editorial team: I.G. Bearden (NBI) H. Bøggild (NBI) C.Holm.

Slides:



Advertisements
Similar presentations
CR7-FMD, 19 March 2007Jens Jørgen Gaardhøje, Niels Bohr Institute 1 Forward Multiplicity Detector FMD 1 FMD 3 FMD 2 Outer ring Inner ring.
Advertisements

ALICE Si-FMD 10/ Jens Jørgen Gaardhøje, NBI, Forward Multiplicity Detector (status and progress) Si-FMD (Forward Multiplicity Detector)
ALICE Si-FMD,T0,V0 25/ Jens Jørgen Gaardhøje, NBI, Forward detector overview Si-FMD (Forward Multiplicity Detector) NBI+INR oSi-strip.
Danish Teachers, CERN, 23 Oct 2007Børge Svane Nielsen, NBI1 The primordial ’soup’ of QUARKS and GLUONS Can we make and study it on earth? M. Turner Natl.
1 500cm 83cm 248cm TPC DETECTOR 88us 1MIP = 4.8 fC = 3 x10 4 e Dynamic : 30 MIP S / N = 30:1 1MIP = 4.8 fC = 3 x10 4 e Dynamic : 30 MIP S / N = 30:1 LATERAL.
Front-end electronics for the LPTPC Outline of the talk:  System lay out  Mechanics for the front-end electronics  End-cap and panels  Connectors and.
TPC DETECTOR SEGMENTATION OF THE READOUT PLANE LATERAL VIEW OF THE TPC
DCS meeting, CERN, 17 June 2002Børge Svane Nielsen, NBI1 Forward Detectors DCS Forward Detectors (FWD): T0- quartz Cherenkov V0 - plastic scintillator.
Forward Detector Meeting, 11 Mar 2003Børge Svane Nielsen, NBI1 Si-FMD status Forward Detector meeting, CERN, 11 March 2003 Børge Svane Nielsen Niels Bohr.
ALICE Si-FMD,T0,V0 12/ Jens Jørgen Gaardhøje, NBI, Forward detector overview Si-FMD (Forward Multiplicity Detector) NBI+INR oSi-strip.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard,
ALICE FMD 11/9 2001Jens Jørgen Gaardhøje, NBI, AGENDA oApproval of agenda and minutes of last meeting oIntegration. L. Leistam ( )
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Thomas Jefferson National Accelerator Facility Page 1 CAM WBS STATUS WBS – Hall B STATUS September, 2012 L. Elouadrhiri.
Muon Tracking FEE R.E. Mischke Los Alamos 10 September, 1999 presentation to the PHENIX Muon Arm Technical Advisory Committee.
Silicon Preshower for the CMS: BARC Participation
Belle-II Meeting Nov Nov Thomas Bergauer (HEPHY Vienna) Status of DSSD Sensors.
J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
ALICE Si-FMD 10/ Jens Jørgen Gaardhøje, NBI, Forward Multiplicity Detector (status and progress) Si-FMD (Forward Multiplicity Detector)
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
1 FEE Installation & Commissioning TPC Meeting, 21 April 2006 L. Musa.
Sensors for CDF RunIIb silicon upgrade LayerR min (cm)1 MeV eq-n cm * * * * * *10.
Hans-Åke GustafssonLHCC review January 31, ALICE meets LHCC referees 31/01/ :00  Milestones report H-A Gustafsson  FMD questions H. Boggild.
Bump Bonding and Thinning of Hybrid Pixel Detectors Kiyoshi Tanida (RIKEN) Johann M. Heuser (RIKEN) PHENIX upgrade workshop, Aug 2002 Contents Bump bonding.
Dahee Kim (Ewha womans university) for MPC-EX collaboration TEST OF MINI-PAD SILICON SENSOR FOR PHENIX MPC-EX.
ALICE Si-FMD,T0,V0 26/ Jens Jørgen Gaardhøje, NBI, Si-FMD oUpdate on Status oConceptual design of FEE and BEE-DAQ chain oTimetable.
LHCC, V0, Sept The V0 detector (Mexico Lyon collaboration)  Segmentation  Simulated performances secondaries / beam-gas  Counters design 1 /
1 SiLC sensors for the LP-TPC Thomas Bergauer Institute for High Energy Physics (HEPHY) Austrian Academy of Sciences, Vienna for the SiLC Collaboration.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
ALICE Rad.Tolerant Electronics, 30 Aug 2004Børge Svane Nielsen, NBI1 FMD – Forward Multiplicity Detector ALICE Meeting on Rad. Tolerant Electronics CERN,
PHOBOS Silicon Sensors Production W.T. Lin Dept. of Physics, National Central University Chung-Li, Taiwan Introduction Design and Production of Si-Sensors.
RWA, 8/12/2006 Present Preliminary Production Plan All still preliminary, as we are re-establishing production. January 9 th,2007: –Delivery of 2 ring.
Current status of the silicon strip sensor development in Korea
Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague CALICE ECal Status Report.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
FWD DETECTORS ALICE FORWARD DETECTORS workshop. AGENDA Tuesday, March 11th, 2003 at R Introduction and main deadlines, Jens.
1 J.M. Heuser – CBM Silicon Tracking System Roadmap for the development of STS module demonstrators Concept Common interfaces/dimensions Some technical.
29/ Jens Jørgen Gaardhøje, NBI, Forward Detectors TDR FMD, T0, V0 Editorial team: I.G. Bearden (NBI) H. Bøggild (NBI) C.Holm (NBI)
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
Status of Hamamatsu Silicon Sensors K. Hara (Univ of Tsukuba) Delivery leakage current at 150V & 350V number of defect channels wafer thickness & full.
ALICE Si-FMD,T0,V0 25/ Jens Jørgen Gaardhøje, NBI, Forward detector overview Si-FMD (Forward Multiplicity Detector) NBI+INR oSi-strip.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
17th March 2005Bernardo Mota / CERN - PH TPC FEE Status and Planning CERN, 7th March 2005 Content  Introduction  Status and Milestones  PASA, ALTRO.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
CBM Silicon Tracking System. Microstrip Detector Module Assembly and Test V.M. Pugatch Kiev Institute for Nuclear Research GSI (CBM experiment), Darmstadt.
Solid State Detectors for Upgraded PHENIX Detector at RHIC.
Si sensors for LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,
The DAMPE STK G. Ambrosi INFN Perugia. The DAMPE Detector Mass: 1480 Kg Power: 600 W Data: 16 Gbyte/day Liftime: 5 years 2.
August DESY-HH VFCAL Report W. Lohmann, DESY Infrastructure for sensor diagnostics FE Electronics Development Sensor test facilities Laser Alignment.
ALICE SSD 20 May Yalta G-J Nooren ALICE SSD status.
Dec
Albuquerque 1 Wolfgang Lohmann DESY On behalf of the FCAL collaboration Forward Region Instrumentation.
July 20, 2007Anita Topkar, BARC PSD Production: Present Status Dr Anita Topkar BARC.
ADC values Number of hits Silicon detectors1196  6.2 × 6.2 cm  4.2 × 6.2 cm  2.2 × 6.2 cm 2 52 sectors/modules896 ladders~100 r/o channels1.835.
The ALICE Forward Multiplicity Detector from Design to Installation.
Performance of the PHENIX NCC Prototype Michael Merkin Skobeltyn Institute of Nuclear Physics Moscow State University.
Sensors Pixel dimension 300 x 300 μm2 Standard p-in-n sensors
“Test vehicle” in 130nm TSMC for CMS HGCAL
Testsystems PXD6 - testing plans overview - by Jelena NINKOVIC Hybrid Boards for PXD6 - by Christian KOFFMANE Source measurements on DEPFET matrices using.
Børge Svane Nielsen/JJG
T1 Electronic status Conclusions Electronics Cards:
CMS RPC Endcap RE1 Status Report
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
AIDA KICK OFF MEETING WP9
Calice Tile-HCal and Tail-catcher/Muon Tracker
Globus-M2 will be constructed by the end of 2015
Status of Hamamatsu Silicon Sensors
Presentation transcript:

8-3-05Jens Jørgen Gaardhøje. NBI. ALICE-CR5 1 ALICE Forward Detectors Technical Design Report Editorial team: I.G. Bearden (NBI) H. Bøggild (NBI) C.Holm (NBI) J.J. Gaardhøje (NBI), ch J.Y. Grossiord (Lyon) T. Malkiewicz (Jyvaesk.) B.S. Nielsen (NBI) G. Paic (Mexico) W. Trzaska (Jyvaeskyla)

8-3-05Jens Jørgen Gaardhøje. NBI. ALICE-CR5 2

8-3-05Jens Jørgen Gaardhøje. NBI. ALICE-CR5 3 FMD ’inner’ protype before dicing 2 sectors of 512 strips Test structures on 6” wafer Hamamatsu

8-3-05Jens Jørgen Gaardhøje. NBI. ALICE-CR5 4 Bonding pads and bias resistors

8-3-05Jens Jørgen Gaardhøje. NBI. ALICE-CR5 5 ALICE-FMD inner sensor

8-3-05Jens Jørgen Gaardhøje. NBI. ALICE-CR5 6 First 3 inner sensors delivered at NBI-Feb 2005 TDR Specs: Full depletion voltage V Measure: full depletion voltage: V. TDR specs: thickness = 310 μm μm Measure: t= 323 μm +- 1 μm

8-3-05Jens Jørgen Gaardhøje. NBI. ALICE-CR5 7 First test of FMD inner Si sensors TDR Specs: < 3 μA Measure: < 0.3 μA < 0.3 nA /strip Full-depletion voltage: 75 V Measure: < 2.5 pF/strip (bulk) 168 hr long-term stability test of leakage current at 200V

8-3-05Jens Jørgen Gaardhøje. NBI. ALICE-CR5 8 FMD Hybrid card w. 8 x (128 ch) preamplifiers

8-3-05Jens Jørgen Gaardhøje. NBI. ALICE-CR5 9 VA_ALICE 128 ch preampl

8-3-05Jens Jørgen Gaardhøje. NBI. ALICE-CR5 10 Test of FEE card with 8 VA_ALICE preamplifier chips

8-3-05Jens Jørgen Gaardhøje. NBI. ALICE-CR5 11 FEE card test results I MIP  e-  3.5 fC Gain 20 mV/fC => 20MIP  1.4 V TDR: C=0pF => N=310e-, C=25pF => N=410e- Measure: C=0pF : N=200e- Expect for C=25pF: N~300e- => S/N= 22400/300=75.

8-3-05Jens Jørgen Gaardhøje. NBI. ALICE-CR5 12 RCU-USB test at NBI with PC&TPC-FEE card

8-3-05Jens Jørgen Gaardhøje. NBI. ALICE-CR5 13 FMD milestones adjusted to new ALICE installation schedule Production of VA_ALICE chipdone Delivery of prototype hybrid cards done Delivery of prototype Si sensors Feb-05done Prototype digitizer boards produced April-05 Lab tests Si-FEE-Digitizer-RCU Jun-05 Rad. hardness studies of FEE&digitizer May-05 Place Si production order Jun-05 Delivery Si & FEE Nov-05 Bonding at CERN Dec-05 Mechanics RB26 completed Feb-06 Full system test with DAQ Dec-05 Sector (half ring) rad. testJan-06 Detector assembly RB26 Mar-06 Detector assembly RB24 Jun-06 Ready for installation RB26 May-06 Ready for installation RB24 Sep-06