Upper Level Copy Room Office Sanctuary Pastor’s Study To Epworth House Kitchen-Acolyte Lobby Courtyard Wesley Room Prayer Room Janitor Storage Nursery.

Slides:



Advertisements
Similar presentations
Site Plan Turner, Hickey and Associates 1st Level Floor Plan Administration 6 th Grade 7 th Grade 8 th Grade Special Classrooms Teacher Lounge Multi Purpose.
Advertisements

St Andrews School A Tour Of The School By Daniella.
Welcome To The New Ebenezer Baptist Church Located at 1200 & 1236 Gregg Street & 1921 Lady Street.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
St. Charles Parish Strategic Pastoral Plan for Facility Development
How to get from the Nebraska Parking lot to the Mary Graydon Center.
Current Project Update October 25th 2012 Good Evening!!!
Welcome to the CY Middle School virtual tour! Click here for pictures of the main floor. Click here for pictures of the second floor.
Campus signage – Internal
September 21 Update. Future Main Entrance (looking south)
Smoke Alarm Placement Example #1 Single story house Laundry Garage Living Dining Kitchen Bedroom Bathroom.
Building Plan Presentation The Evangelical Lutheran Church of The Holy Trinity.
Glenvar High School Renovations School Board Presentation
The Kingdom Center Healing Streams Church & PAC Multi-Service Center.
…You Need to Know Emergency Action Plan (EAP) 4 Training Topics…
Church Renovation/ Expansion Proposals Willowdale.
Capital Campaign 2012 John Calvin Presbyterian Church Opening New Doors, Letting Our Light Shine.
Kitchen: fridge resting on debris blocking entrance to utility room.
Feb 27, 2007 Informational Meeting 1 St Paul United Methodist Church Faith Works! “Building for Christ’s Ministry” Informational Meeting February 27, 2007.
East Hall VOLUNTEERS Discovery Room Shop4Science Cafe PORTICO Rotunda Entrance Foyer Rotunda Vestibule West Hall FIRE EXIT REST ROOMS FIRE EXIT REST ROOMS.
UC Santa Cruz Engineering Building 2 69,000 ASF ~$47M.
ADDITION & REMODEL Eugene Field Elementary School.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
Property: Block of Norzagaray-San Justo-San Sebastian Exact address: #251 Calle San Sebastian Viejo San Juan, PR.
1. 1 3/14/11 Church Conference 14-Mar-11 Welcome and Introduction Opening Prayer Presentation of Building Project Motion to Approve Project Vote on Proceeding.
Master Plan Committee Report to Church Council August 26, 2008.
A PLAN TO BUILD AN ELEVATOR October 15, Long-Range Plan –Office-size Elevator –New Fireproof Stairs –Handicap-Accessible Restrooms –Large Multi-purpose.
HOUSING AUTHORITY Kathleen Millar. Floor Plan- level 1.
The White House. Where It Is Located It is located in Washington D.C. in the United States.
…You Need to Know Emergency Action Plan (EAP) 4 Training Topics… 2010.
POV Renovations November 14,2014. Repairing the East Wall.
Hotels April 18 th, context Elements Layout Rooms Amenities Motels.
North Augusta High School Design Development Presentation.
October 26, 2001 Sudbury, Massachusetts The Office of Michael Rosenfeld, Inc., Architects West Acton, MA Lincoln-Sudbury Regional High School.
Family Life Center / Youth Center 201 Music Office 216 – 217 Children’s Classroom 202 – 203 future use 218 Kid’s Klub 204 old sanctuary 219 – 220 Storage.
Learning, Health, and Safety Capital Project Alternates and Change Order
HALL HIGH SCHOOL NEW SCHOOL PROJECT MARCH 28. Main entrance & cafeteria windows Main entrance.
COZYEON Residence Main facilities gallery. Corridor of each floor.
In this map you will be asked a series of yes or no questions to see if you following the right path.
View of Big Wave Project From Highway 1 and North Capistrano Existing View Phase 1 and 2 (2 years from Permit): First 16 Units, Kitchen, Dining, Living,
Option 1 New Construction (10,000 Square Feet) – Secure Entrance / Administrative Offices – Lobby / Connection to Greeno Building – Weight Room Renovations.
Bethany Room Pre-K Sunday School and general storage. Room is very long and has access from each end and from parlor. No closets. INVENTORY – CURRENT USEIMMEDIATE.
Sauriol Bohde Wagner architects and associates, inc Garfield Road Macomb, Michigan ph fx.
A HOUSE.
The Campus 2.06 Acres or 89,734 sq ft of Land 25,058 sq ft Church Building 4,239 sq ft Sanctuary 497 sq ft Balcony 20,322 sq ft Multipurpose.
IN THE EVENT OF FIRE OR YOU ARE DIRECTED TO EVACUATE THIS BUILDING
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
PRINCE Of WALES First Floor Portable 4 Portable 2 To Mini School
H A L L x x X = IN CASE OF FIRE DO NOT ENTER ROOMS x x x x x x x
Penn Medicine Chester County Hospital
Project 105 Report to Congregation
Southwest State University – 2nd Floor Charter Hall (CH)
Fire Department Truth or Consequences Fire Department built a new complex in 2001 at 310 East 9th Street. This complex was setup to house an EOC/Dispatch.
Gaurav’s Office: and (Receptionist)
1 Semester Project Design A Multi Story Office Building
FOLSOM HOUSE 528 East 14th Avenue
Cafeteria Entrance to media center
WELCOME TO WYALUSING PRESBYTERIAN CHURCH.
Cafeteria exit exit Entrance to media lobby 12
Part 1 Introduction You choose to….
WELCOME TO WYALUSING PRESBYTERIAN CHURCH.
RPC Renovation and Addition
WES Renovation Update Photo Gallery
WELCOME TO WYALUSING PRESBYTERIAN CHURCH.
WELCOME TO WYALUSING PRESBYTERIAN CHURCH.
Omnilore at Beach Cities Health District
North Augusta High School – Phase 2A and 2B
Strickland Middle School
N Learning Resources Center To Sim Lab Interior--- Office 115 ELEVATOR
ROOM OUTLINE FOR NORTH AND SOUTH WINGS
Presentation transcript:

Upper Level Copy Room Office Sanctuary Pastor’s Study To Epworth House Kitchen-Acolyte Lobby Courtyard Wesley Room Prayer Room Janitor Storage Nursery Room 14/Headstart Room 13/Bells Room 12/Choir Pre-School Room 11 Kingdom Kids Art Room 10 Kingdom Kids Marketplace Library DrivewayDriveway Male Restroom Elevator Stairs Hallway to SE Entrance Female Restroom East Parking Lot Stairs To Stairs South East Entrance Double Doors Hallway

Upper Level Copy Room Office Sanctuary Pastor’s Study To Epworth House Kitchen-Acolyte Lobby Courtyard Wesley Room Prayer Room Janitor Storage Nursery Room 14/Headstart Room 13/Bells Room 12/Choir Pre-School Room 11 Kingdom Kids Art Room 10 Kingdom Kids Marketplace Library DrivewayDriveway Male Restroom Elevator Stairs Hallway to SE Entrance Female Restroom East Parking Lot Stairs To Stairs South East Entrance Double Doors Hallway

East Parking Lot South Parking Lot East Entrance Stairs Elevator Canopy Sidewalk Up Stairs Sanctuary Office Down Stairs Kitchen Hall Female Restroom Male Restroom South East Entrance You are Here

East Parking Lot South Parking Lot East Entrance Stairs Elevator Canopy Sidewalk Up Stairs Sanctuary Office Down Stairs Kitchen Hall Female Restroom Male Restroom South East Entrance

To Upstairs/East Parking Lot S-16 Storage S 20 Lower Level Elevator Mechan Boiler Simpson Hall S 18 S 19 Storage Elevator Stairs Theater Male RestFM Rest Kitchen Storage Stairs Fellowship Hall Annex You are Here Kingdom Kids Science/Cooking

To Upstairs/East Parking Lot S-16 Storage S 20 Lower Level Elevator Mechan Boiler Simpson Hall S 18 S 19 Storage Elevator Stairs Theater Male RestFM Rest Kitchen Storage Stairs Fellowship Hall Annex Kingdom Kids Science/Cooking