Session 4 KY Type 1 End Treatment ET-PLUS Slide 6 by Trinity Highway Products SKT-SP Slide 63 by Road Systems.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Build Your Own Future RC2 Serviceability. Build Your Own Future Safety and Ground Rules Before servicing, always remove A/C power from the unit and disconnect.
Assembly Instructions last updated October [NOTE: It is easier to assemble your Earthmaker on a non-skid surface. The Earthmaker can then be picked.
Instructions for making plunger fork tool. Drawing for the trigger assembly.
General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base.
Stable Rise – Fixed Bracket / Stationary Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
TWO (2) Installation principles 1. Cabinets need to be installed straight, plumb, and level. 2. The area you are working in is rarely straight, plumb,
Installation Procedures
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
What is a fastener? A device to locate or hold parts
Session 6 KY Type 4A End Treatment See “Shop Drawings” for Types FLEAT-SP Slide 6 by Road Systems SRT-27 Slide 47 by Trinity.
Optical Manufacturing Solutions 1 Probe Assembly.
Here is the broken line. Step 5: Break loose encasing seal. With bar in vice as show, hit with hammer to break loose. Usually 2 or 3 hits will break loose.
Installation. Indoor Unit Installation Typical Installation.
Click on this image to open the full PDF document.
Session 8 Type IX Crash Cushion CAT-350 Trinity Highway Products.
Gripper Designs By Pragnay Choksi. INTRODUCTION Hands of robots referred to as Grippers No single design is ideal for all applications.
C-Base Transmission Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Trinity Highway Products Properly Installed SRT Post HBA System-Slotted Rail Terminal
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Assembly Instructions Additional documents needed for Assembly: GA Drawings on all Units Header Platform GA Drawings Motor Deck Platform GA Drawing Packing.
Session 4 KY Type 1 End Treatment ET-PLUS Slide 6 by Trinity Highway Products SKT-SP Slide 63 by Road Systems.
MyLock 644D Service Seminar.
Robot Quick Build Session Frame Assembly Instructions Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to Oklahoma.
Stable Rise –Pull and Swivel Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Session 6 KY Type 4A End Treatment See “Shop Drawings” for Types FLEAT-SP Slide 6 by Road Systems SRT-27 Slide 49 by Trinity The KY Type 4A End Treatment.
Session 8 Type IX Crash Cushion CAT-350 Trinity Highway Products
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
TRACK FITTINGS AND FASTENINGS
Pneumatic Arm Assembly Instructions. Contents of Pneumatic Arm Kit Wooden pieces (⅜” cross-section): 1 X 24”; 1 X 21⅛”; 8 X 7½”; 4 X 7⅛”; 4 X 7”; 2 X.
Installation. Indoor Unit Installation Typical Installation.
Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const.
Dimensioning Dimensioning.
Installation. Indoor Unit Installation Typical Installation.
1 FREE CLIMBER 4400 ASSEMBLY INSTRUCTIONS PART NUMBER
Plans for the 2015 Invention Challenge Target Paul MacNeal August 9,
STATE WIDE SIGN GUIDE This guide will demonstrate various sign mounting products and procedures for construction and maintenance.
Peregrine the Martian Lander Assembly Instructions Mission to Mars 2008.
Crashworthiness Simulation of ET2000 Guardrail Extruder Terminal.
Safety Rules for 9 th Grade Shop Radial Arm Saw: Safety Rules Never cut a board that is less than 12 inches long. Always pull the saw using the handle;
Session 7 How Critical is it to Properly Install Guardrail End Terminals???
HOSE ROLLS Straight roll ◦Lay the hose out straight and flat on a clean surface ◦Roll the male coupling over onto the hose to start the roll ◦Form a coil.
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
AVIVA™ ELECTRIC BIKES VIPER ASSEMBLY INSTRUCTIONS Aviva™ - For A New Way Of Life.
1 Equilibrium The Balancing Robot By: Kerry Scharfglass Whiz Kid.
WeldingRod’s Exactly Constrained 3D Printer Plate Identification and Stuffing.
Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Sentek Sensor Technologies Installation of EasyAG 50 and EasyAG 80.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
VIEW SERIES with Sliding Door
30’ Wireless Mast – Self Install
What is TETRIX? If you can dream up a robot design, you can build it with the TETRIX Robotics Design System.
Installation Walkthrough Image Guide
STEP 1: ASSEMBLE ANGLE PLATES
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
Fastener Facts Fastener Facts.
Easy-Cliner Manual Cable Version Assembly Instruction
Fastener Facts Fastener Facts.
STEP 1: ASSEMBLE ANGLE PLATES
Module 6 Antenna Assembly and Look up Angles
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Assembly instructions for M-K all bolt together hoppercone kit.
Horizontal Installation Overview
FIRST Long Island Presented by School-Business Partnerships of Long Island, Inc.
Step-by-step assembly instructions
Where to Use Warning Lines
Presentation transcript:

Session 4 KY Type 1 End Treatment ET-PLUS Slide 6 by Trinity Highway Products SKT-SP Slide 63 by Road Systems

How do you know which version of a Proprietary Guardrail End Treatment KY is Using? Go to the KYTC Div of Design Home Page On the lower right click on Standard Drawing Brings up: Standard Drawings Active Sepia List Approved Shop Drawings - Click The drawings show the version PLUS, SP, 27 etc. Basic Info – very useful

y-Designhttp://transportation.ky.gov/Highwa y-Design Design Home Page Standard Drawings Lower Right

Standard Drawings Active Sepia List Approved Shop Drawings Click

Approved Shop Drawings Click “Alternate 1 Trinity ET Plus”

Approved Shop Drawing “Alternate 1 Trinity ET Plus”

The ET-Plus KY Uses is 50’, 7 SYT Post & 1 HBA Post The Title Block Details which ET-Plus Model KY is using

ET-Plus Parts List You can learn a lot just looking at the Parts List and the Drawing

Standard Drawing RBR-020 Guardrail End Treatment Type 1

Standard Drawing RBI-004 Installation of Guardrail End Treatment Type 1

Installation Instructions for Proprietary Guard Rail End Terminals This Std Draw Note appears on each Proprietary End Treatment used in KY - “The Manufacturer SHALL furnish two (2) sets of shop plans to the contractor with each installation” Each Proprietary End Treatment “see shop drawings” Added to Sect of 2012 Std Specs: “Proprietary end treatments SHALL be installed according to the manufacturer’s assembly or installation instructions” SHOULD NOT LET THE CONTRACTOR BEGIN INSTALLATION BEFORE SUPPLYING YOU WITH THESE SHOP PLANS & INSTALLATION INSTRUCTIONS – Both you and the contractor need these documents to properly do your jobs of installing and inspection propriety guardrail end terminals

Type 1 Trinity – ET-Plus /products/etplus.html /products/etplus.html

Type 1 ET-Plus Standard Drawing Note “The Manufacture Shall Furnish Two (2) Sets of Shop Plans to the Contractor with Each Installation” For the ET-Plus this is on line at /pdfs/ETPlus-Manual.pdf Call if you do NOT Understand Manual /pdfs/ETPlus-Manual.pdf This Manual is cumbersome and somewhat hard to follow

products/pdfs/ETPlus-Manual.pdf

ET-Plus - Absorbs Energy by Extruding the Rail Thru Impact Head and Knocking Down Post

Hit ET-Plus with SYT Post that Bend (Yield) upon Impact

ET-Plus m/products/etplus.html m/products/etplus.html Energy Absorbing End Treatment 50 feet long Post 1 - HBA Post (Hinged Break-Away) Post SYT Post (Steel Yielding Terminal) Has a Strut between Post 1&2 No Tube or Soil Plates Standard Guardrail begins at Post 9

ET-Plus m/products/etplus.html m/products/etplus.html Do Not attach Guardrail to Post 1 Under no circumstances shall the guardrail within the ET-Plus Pay Limit be Curved – see Installation Instructions

ET-Plus Installing HBA Post-Bottom Post 1 Install the Bottom of the HBA Post such that the LARGE HOLE 13/16” is placed downstream (away from the Impact Head)

ET-Plus Installing HBA Post-Top Post 1 Align the Holes of the Post Plates (either side of Ears) on the Top and Bottom Post Insert a 3/8” x 2” Hex Head Bolt through the 7/16” hole in the Post Plates (Ears) with washer and lockwasher under the 3/8” Nut (one bolt assembly on each side of Post) Note 3/8” Bolts can be installed with nuts inside or outside of Post Plates

ET-Plus Installing HBA - Top Post 1 Are Lock Washer & Washer on??

ET-Plus Installing HBA Post-Top Post 1 On the side opposite the Strut - Insert a ¾” x 2 ½ ” Hex Head Bolt through the 13/16” hole in the Post Plates with washer and lockwasher under the ¾” Nut Note ¾ ” Bolts can be installed with nuts inside or outside of Post Plates DO NOT install the ¾” Bolt on the Strut Side until installing the Strut

ET-Plus Installing HBA Post - Top Post 1 Are Lockwasher & Washers on??

Final Base of Post 1 From ET-Plus Shop Drawing

Final Base of Post 1 Washer but does not have Lockwasher

Washer & LockWasher

ET-Plus Post 2 – 8 SYT Post If properly Graded, drive all the 6’ SYT Post to the optimum depth where centers of the 4 Yielding Holes through the Flanges are at the Ground Line Note: Post 2 does NOT have an offset block Note: Post 3-8 receive 8” offset blocks

ET-Plus Installing the Strut Post 1 Place Angle Strut on the Flange of the HBA Post 1 with ¾” Hex Head Bolt placed through the top and bottom Post Plates and connect with a ¾” Washer and Lockwasher under the ¾” Nut. Note: Strut can be placed with one of the leg flat or leg edge on the ground Note: Strut can be installed on traffic side or field side of the Post

Installing the Strut Post 1 Again where is the Washer & Lockwasher??

ET-Plus Installing the Strut Post 2 Place 2 – 7/16” Hex head Bolts with Washer into the two Slotted Holes of the Strut Place a Lockwasher and Nut on the ends of each of the Inserted Bolts Tighten Nuts to snug position

ET-Plus Installing the Strut Post 2 Washers are Important Incorrect - Loose Fit Without Washer & Lockwasher Correct Tight Fit With Washer

ET-Plus Install Offset Blocks & Rail Panels Post ’ or 12’6” Rail Panels are acceptable Splice the rail Panels with 8 - 5/8” x 1 ¼” HGR Splice Bolts and Nuts Do NOT connect Rail Post 1 NO Offset Post 1 or 2 Post 3-8 Insert 5/8” x 10” HGR Bolt thru Rail Panel, 8” Offset Block and SYT Post Connect with 5/8” Round Washer and HGR Nut

Post 2 No Offset Block Post 3-8 8” Offset Block Composite or Wood

ET-Plus Installing Rail Panel to Post 2 NO Offset post 2 Insert 5/8” x 1 ¼” HGR Bolt through the Rail Panel and SYT Post 2 Connect with 5/8” Round Washer and HGR Nut

ET-Plus Installing Rail Panel to Post 2

ET-Plus Installing the Cable Anchor Assembly Secure Cable Anchor Assembly to the Rail by Inserting the Square Protruding Hooks/Lugs into Square Holes in Rail Panel toward Post 1. Secure by pulling the Bracket toward the Impact head insuring the Hooks/Lugs are well Seated into the Square Holes.

Protruding Hooks /Lugs on ET-Plus Cable bracket

ET-Plus Installing the Cable Anchor Assembly Cable Bracket

Protruding Hooks /Lugs on ET-Plus Cable bracket Post 1

ET-Plus Installing the Cable Anchor Assembly Slide one end of Cable into the Cable Anchor Bracket and the other end into Post 1 Place a 1” Washer and Hex Nut on the Bracket End near Post 2 and tighten until at least 2 Threads are showing Place Bearing Plate on Impact Side of Post 1 where Cable extends through Post 1 Bearing Plate must have Long Dimension (5”) Up

Bearing Plate with Tabs on both sides to keep Bearing Plate Oriented with 5” UP

ET-Plus Installing the Cable Anchor Assembly Place 1” Washer and Hex Nut on the end of the Cable extending through Post 1 Restrain the Cable with locking pliers at the end of the Cable being tightened Tighten the Hex Nuts on the Cable Ends until TAUT – it is considered TAUT when Cable does not deflect more than 1” when pressure is applied

Tighten Anchor Cable – Using Vice Grips

ET-Plus Installing the Cable Anchor Assembly Shank portion of Anchor Cable MUST BE positioned so it bears on the bottom edge of the web of the HBA Post (Post 1) Shank portion of Cable must also be centered Horizontally so the Bearing Plate bears uniformly on both Fingers of Post 1

Shank Portion of the Cable Bears on Bottom Edge of HBA Post

ET-Plus Installing the Cable Anchor Assembly

47 What happened here??? Impacting Vehicle NOT Contained

What happened here??? WHAT is on the ground & WHY?

ET-Plus Installing the Extruder Head Rail feeds out the Extruder Head away from traffic – Arm points away from traffic Push the Extruder Head as far as it will go on the Rail panel, making sure the Rail is in the Channel Chute Place the Extruder head against the HBA Post (Post 1) parallel to the ground

ET-Plus Properly Installed Extruder Head Pushed all the way on

Improper Installation - Extruder Head not Pushed all the way on (very old ET) Would Spear Vehicle

Improper Installation - Extruder Head not Pushed all the way on

ET-Plus Installing the Extruder Head Top and Bottom Flanges on the side of the Extruder Head each has 3 holes – use the hole that best aligns with the holes in top and bottom of the HBA Post & Extruder Head parallel to the rail panels Place a 3/8” washer on a 3/8” x 1 ½” Hex Head Bolt – Insert Bolt through Flange of Extruder Head and Flange of HBA Post Place 3/8” Fender Washer Under 3/8” Nut on the end of the inserted Bolt Tighten until snug

ET-Plus Installing the Extruder Head 3 Holes in Extruder Head Flanges

Fender Washer

Properly Installed Extruder Head

Extruder Head should be Parallel to the Guardrail – Not dipping down like this

Extruder Head should be Parallel to the Guardrail – Not dipping down like these

Energy Absorbing End Treatments STRAIGHT FLARE / NOT CURVED NO CURVES

From the ET-Plus Installation Checklist Extruder Head is pushed on as far as it will go on the rail panel ensuring the panels fully engage with the feeder chute The Extruder Channel is approximately parallel to finished grade Cable Anchor Bracket is locked into place, by pulling the bracket toward Post 1 making sure the Hooks/Lugs are well seated into the Square Holes

From the ET-Plus Installation Checklist Shank portion of Cable Anchor positioned against bottom web of top portion HBA Post 1 Hex Nuts on ends of Anchor Cable are tightened taut (Cable deflects less than 1”) Cable Bearing Plate Oriented such that 5” dimension is up

Properly Installed ET-Plus

SKT-SP Road Systems Sequential Kinking Terminal – Standard Post

SKT-SP Road Systems /SP-Installation-Manual.pdf /SP-Installation-Manual.pdf SKT-SP & FLEAT-SP A very easy to follow “Assembly Instructions” With Drawings and Photos

Approved Shop Drawing SKT-SP 37’ 6” System

Except for 5 Differences the SKT- SP and the FLEAT-SP are Identical Please note: To Avoid duplication the Installation for the Type 1 SKT-SP is Covered with the Type 4A FLEAT-SP of this Training

5 Differences Type 1 SKT-SP Type 4A FLEAT-SP 1. Flare SKT-SP: 12” FLEAT-SP: 48” 2. Extrudes Guardrail SKT-SP Away from Traffic FLEAT-SP Towards Traffic 3. Size of Impact Head & Feeder Chute SKT-SP Longer FLEAT-SP Shorter

5 Differences Type 1 SKT-27 Type 4A FLEAT Cable Fed Inside/Outside Feeder Chute SKT-SP Cable Fed thru Feeder Chute FLEAT-SP Cable Fed Outside Feeder Chute 5. Bolt or No Bolt Connection to Post 3 SKT-SP Guardrail IS Bolted to Post 3 FLEAT-SP Guardrail is NOT Bolted to Post 3

Flare SKT-SP: 12” FLEAT-SP: 48” FLEAT-SP 48” Flare SKT-SP 12” Flare Next to Roadway/Shoulder

Extrudes Guardrail SKT-SP Away from Traffic FLEAT-SP Towards Traffic SKT-SP Away from TrafficFLEAT-SP Towards Traffic

Size of Impact Head and Feeder Chute SKT-SP Longer FLEAT-SP Shorter SKT-SP Longer Impact Head Feeder Chute FLEAT-SP Shorter Impact Head Feeder Chute Feeder Chute Ends

SRT-SP Cable feed inside/thru the Feeder Chute FLEAT-SP cable does NOT

The KYTC Pay Limits for the Type 1 End Treatment SKT-SP is 50’ even though the SKT-SP Shop Drawing says 12’ 6” for the 37’ 6” System KYTC Type 1 Guardrail End treatment Pay Limits 50 Feet Standard Drawing RBR-020 Guardrail End Treatment Type 1 Road Systems SKT-SP Pay Limits 12’ 6”

Manufactures Installation Info SKT-SP Road Systems Installation-Manual.pdf Installation-Manual.pdf ET-Plus Trinity Highway Products pdfs/ETPlus-Manual.pdf pdfs/ETPlus-Manual.pdf Elizabethtown KY Both have a short Section on Repairs

ET-PLUS and SKT-SP Installation manuals ET-PLUSSKT-SP & FLEAT-SP