Group 14 Jerrod Stock David Villers.  Location: between Tacoma and Gig Harbor, Washington  Total Length: 5,939 ft.  Longest Span: 2,800 ft.  Width:

Slides:



Advertisements
Similar presentations
Replacement of the Queens Approach Bronx-Whitestone Bridge
Advertisements

Understanding Skewed Bridge Behavior
Chapter-2 Parts of Steel Bridge.
Engineering Terms Engineers design all structures with enough strength to withstand the force and load that will be placed upon them. Generally loads are.
BRIDGES! July
What do I need to know to build one ……….. Types of Bridges Arch Bridge Beam Bridge Suspension Bridge Cable Stays Bridge Combination Bridge.
The Tacoma Narrows Bridge(s) Click to continue…. The original Tacoma Narrows Bridge was built between November 1938 and July 1, 1940.
ACI “Standard Specifications for Tolerances for Concrete Construction and Materials” gives (2) tolerances for suspended slabs on metal deck: Thickness.
By : Prof.Dr.\Nabil Mahmoud
ENG-1010 Lecture 16 Bridge Design.
What is a wave?  Take a moment to answer this question with the students at your table.  As a group, create a definition and give an example of a wave.
CEA UNIT 3 TERMS & DEFINITIONS. BEAM A structural member, usually horizontal, that carries a load that is applied transverse to its length.
Chapter 34 Bridge Construction.
Bridge Engineering: Lessons from Rome to Tacoma
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
Resonance and Bridge Construction Engineers have always pushed the frontiers of bridge construction with both materials and design. Sometimes they push.
Reconstruction of the Eads Bridge Highway Deck
EAS 140 Engineering Solutions Lecture #27 How Engineers Learn from Failure.
 The biggest difference is the distance they can cross in a single span.  A modern arch can safely span up to 800 or 1,000 feet.  While a suspension.
Learning Standards 5. Construction Technologies Construction technology involves building structures in order to contain, shelter, manufacture, transport,
I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.
Enhanced Oil Recovery using Computerized Hydraulic Lift Systems
Suspension Bridge Design
London’s Bridges Are Not Falling By Ricky Smetana.
BRIDGE DESIGN SAIF HAROON BY Post-Doctoral Research Associate
The Tacoma Bridge, Past to Present By: Raquel Escatel May 12, Presentation.
The Collapse of Tacoma Narrows Bridge: The Ordinary Differential Equations Surrounding the Bridge Known as Galloping Gertie Math 6700 Presentation Qualitative.
‘Galloping Gertie’ The Tacoma Narrows Bridge Failure November 21, 2006 Max Walker Robby Poshusta Robby Poshusta Jan Kubicka Jan Kubicka Aaron Aslin Aaron.
Hays Street Bridge Rehabilitation Patrick Sparks, P.E. Approaches to Historic Bridge Rehabilitation Case Study #1 1.
There are many types of bridges including:
Opened to traffic: July 1, 1940 Collapsed: November 7, 1940 Lewis Cluck - lxc Advanced Requirements Engineering – SE 6361.Z01 Oct. 26, 2012.
TOPIC: “SUSPENSION BRIDGE” Branch:CIVIL 2ND YEAR,3RD SEM
BRIDGE BUILDING.
Beam Bridge consists of a horizontal beam supported at each end by piers. The weight of the beam pushes straight down on the piers. The farther apart.
Bridges & Forces.
Introduction to a pit installation
BRIDGE BASICS THERE ARE THREE MAIN TYPES OF BRIDGES: BEAM BRIDGE
I. Truss Bridge Gussets Background
By : Lisa Runt. Types of Bridges Beam – the simplest type of bridge. It is made of two or more supports which hold up a beam. Arch – weight is carried.
Akashi Kaikyo Bridge. Quick Facts Nicknamed the “Pearl Bridge” Nicknamed the “Pearl Bridge” Located over the Akashi Straight in Japan Located over the.
International Partnership Day.  An SPMT is used for transporting massive structures that are too large or heavy for normal trucks  The SPMT consists.
A swinging cable and wooden plank bridge in a New Zealand rain forest.
Group 7 Ethics Presentation Group Members: Adam Burky Maxx Chancey John Dixon Chris Martinez Alex Pingley.
Tornadoes.
Tacoma Narrows Bridge “The Galloping Gertie”. Why was it built? Commissioned in 1937 to cross the Tacoma Straits of Puget Sound Commissioned in 1937 to.
There are basically 4 different types of bridges: Arch bridge Suspension bridge Beam bridge Cable-stayed bridge An engineer would choose the correct bridge.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
Bridge Designs Bridges are often built over huge landmasses or bodies of water. Their design depends on their function and location. We will take you through.
The Millennium Bridge London. Background  It is located between Southwark Bridge and Blackfriars Bridge.  1 st Bridge to be built over the river Thames.
Group 7.  Designed by Sir Thomas Bouch  Completed in February 1878  Longest spanning bridge in the world at the time ( 2 miles)  Built to span the.
Tacoma Narrows Bridge Collapse
Why we got it wrong: Tacoma narrows bridge 1940
 Opened to traffic July 1 st 1940  Third largest suspension bridge in the world  Bridge nicknamed Galloping Gertie.
Bridges.  A bridge provides passage over some sort of obstacle: a river, a valley, a road, a set of railroad tracks... Etc…  The type of bridge used.
Bridges and Loads Modified by Matthew Silbernagel.
The Engineering Disaster of Tacoma Washington Bridge Collapse of 1940 Kevin Russell and Ricky Jones 10/11/11.
Chapter-2 Parts of Steel Bridge. contents Bearings Horizontal and transversal wind bracing Classification of bridges.
Bridges There are basically 4 different types of bridges: Arch bridge
Applying and applying the knowledge for Design solution
Tacoma Narrows Bridge & Aeroelastic Fluttering
Engineering and Natural Disasters
Replacement of Vechicle Bridge over Spring Creek Centre County, PA
Bridge Engineering: Lessons from Rome to Tacoma
Board of Commissioners Meeting
Your Inspection Business Name Goes Here.
STRUCTURAL FAILURES-CAUSES AND REMEDIES:
Wind Destruction By Gavin Smith and Charlie Wilmeth.
The Great Belt East Bridge
Engineering Technology Program
Presentation transcript:

Group 14 Jerrod Stock David Villers

 Location: between Tacoma and Gig Harbor, Washington  Total Length: 5,939 ft.  Longest Span: 2,800 ft.  Width: 39 ft.  Clearance: 195 ft.  Construction: Sept. 27, 1938  Opened: July 1, 1940

 Original plan made by Clark Eldridge - $11 million.  Redesigned by Leon Moiseiff with drastic modifications - $7 million.  Significant Modifications: 25 ft. deep trusses replaced by 8 ft. deep girders.  Bidding contractors complained about revised foundation piers. Original plans were shown, and they agreed.

 “Creative Techniques” were used → packing girders with dry ice.  One death during construction.  “As soon as floor forms were started, oscillation occurred.”  Nicknamed “Galloping Gertie”

 Tie-down cables from girders to 50-ton concrete blocks → snapped after installation.  Pair of inclined cable stays connected main cabled to deck at mid-span → ineffective.  Hydraulic buffers between towers and deck floor system → seals damaged when bridge was sand-blasted before painting.

 Washington Toll Bridge Authority hired Professor Frederick Farquharson.  Conducted wind-tunnel tests on 1:200-scale bridge and 1:20-scale deck section models.  2 Solutions:

 November 7, 1940 – 40 to 45 mph winds  7AM – Bridge begins transverse vibrations (3 ft. amplitude).  10AM – North cable collar loosens; violent torsional oscillations begin (28 ft. amplitude).  10:30AM – Bridge begins cracking.  11:10 AM – Center span collapses.

 One fatality:

 aV4 aV4

 Convinced contractors to bid by showing plans for foundation piers that weren’t part of decided design.  Moisseiff’s design was new and hadn’t been modeled and tested:  8 ft. girders meant shallow roadway sections → bridge deck was insufficiently rigid.  Flat outward facing surfaces of girders weren’t aerodynamic.

 Rejected initial conventional design based solely on cost.  Chose unproven design which had insufficient research. Combined Ethical Issue:  Opened bridge to public despite:  Oscillations which they knew would have to be fixed.  Early failure of vibration control systems.

 Used a standard and proven design rather than the new “elegant” design.  Halted new design acceptance until a scale model was built and passed testing.

 Shut bridge down or delayed opening until permanent solution was reached.  Replace hydraulic buffers to help stable bridge for construction of permanent fix.  Expedite Professor Farquharson’s research.  Then expedite implementation of determined solution.

 Safety of users  Mechanical parts could cause injury:  Motors, gears, springs.  Prevention: Inner workings of devices are in sealed location. Necessary user input devices are away from moving parts.  Predictability of projectiles Prevention: Both automatic timed shut off and manual stop button.

?