PROJECT STATUS UPDATE Hyatt Modernization Program

Slides:



Advertisements
Similar presentations
Superior Turbine Solutions, Inc. Steam Path Capabilities Rotor Repair
Advertisements

Grant County PUD Plant Upgrades at Wanapum and Priest Rapids Dams
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 10 1 All you always wanted to know about.
Joe Killins & Associates, LLC Pipelines & Risk Based Management How Safe is Safe?
Environmental Drilling By: Josh Humphreys October 8,2006.
2013 C&MS Section 500- Structures Changes from 2010 to 2013 Construction and Materials Specifications in Structures Items.
V SpecialServices. Note: The following slides were taken directly from the “What’s New in ProgressBook v.14.7” PowerPoint distributed by SoftwareAnswers.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Presentation to Barclay Owners November 21, 2013 Window Replacement Project Information Session.
John Breslin Celtic Explorer - Generating Engine Alignment Problems John Breslin.
Federal Aviation Administration Project Status Update: R90 Tracon, STL ATCT, MCI ATCT, mold and moisture issues Presented to : CSA Terminal and Technical.
© 2012 Delmar, Cengage Learning Ordering Parts, Short and Long Blocks, and Engine Assembly Chapter 55.
February 17-18, 2010 R&D ERL Ady Hershcovitch R&D ERL Beam Dump Ady Hershcovitch February 17-18, 2010 Beam Dump.
RELIABILITY IN A HIERARCHICAL MANAGEMENT. 1 LITERATURE REVIEW & METHODS THE RESULTS OF THE PRESENTATION CONTENT 2 3 INTRODUCTION AND OBJECTIVE.
MACHSEAL 101. Design Information Stationary rotary face seal that utilizes axial spring force to positively mate the optically flat seal face against.
Heavy Engineering & Reclamation Specialists. Baker & Provan Capability Heavy Engineering –Reclamation Specialists –Machining, –Fabrication, –Assembly.
Component Rebuilds John Richards Cashman Product Support Representative Lyle Kibbe Cashman Service Supervisor A Guided Tour Through Cashman Equipment.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
1 Xenon Detector Xenon Detector Group. 2/22 Contents  Construction Status Cryostat PMT mounts  PMT Pisa PMT test PSI PMT test Trouble report  Neutron.
Senior Design: Validation of Design December 15, 2008.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Steve Lefler - Principal Engineer Duke Energy
Tank Consultants, Inc West 21st Street Tulsa, Oklahoma Telephone Fax
ITIL Problem Management Tool Guide Gerald M. Guglielmo ITIL Problem Manager CD-doc
Preliminary studies for Muon shield modification to accommodate LCLS II Alev Ibrahimov December, 2010 BSY.
Fermilab Cavity Refurbishment Status J. Reid M. Slabaugh November 19, 2014 J. Reid 1.
1 Before and After The Appearance Program; enhances your company image contributes to your fleet vehicle safety communicates a professional advantage.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
Petroleum Engineering 406 Floating Drilling
ANSI-ASQ National Accreditation Board FQS Accreditation for forensic testing agencies Bob Cruse RMC Denver Co., September
NTOF11 Collaboration Meeting Non-Design Issues for the Mercury Jet Target P.T. Spampinato V.B. Graves T.A. Gabriel Princeton University April 29-30, 2005.
Griner Drilling Service
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Detail and Assembly Drawing
An Engineering Comparison of Post and Lintel Construction Method to Roman Arch Construction Method. Presented by: Autographs will be provided at a later.
2008 NAPHSIS Annual Meeting Celebrating 75 Years of Excellence Orlando, FL June 1 st – 5 th, 2008 The Kentucky Vital Records EVVE Experience.
FAILURE ANALYSIS Sources of failure - - Sources of failure - - Material Related Failures. Deficiency in Design. Service Related Failures. Environmental.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Welding Inspection and Metallurgy
Jason Tarrant / November 2008 MICE Target Mechanical Design l Jason Tarrant – STFC l Introduction »Investigations into target shaft failure »Current suspicions.
HYUNDAI FORGING January 11, Manufacturing process in HYUNDAI FORGING Ha Hong-Gyu.
Grid Operations Report To ERCOT Board Of Directors December 16, 2003 Sam Jones, COO.
Presentation for: 2009 FIMS/Real Estate Workshop Prepared by: Mark Gordy, Headquarters (EES) Facilities Information Management System Data Quality and.
MNM Fatal Falling Material Accident Falling Material Accident April 11, 2012 (North Carolina) April 11, 2012 (North Carolina) Sand & Gravel Operation.
Sub Committee 6 Ballot resolution Summary June 2012 Mike Briggs.
CLAIMS MANAGEMENT. PRESENTATION OUTLINE INTRODUCTION TYPICAL CLAIMS AGAINST OWNER TYPICAL CLAIMS AGAINST CONTRACTOR CRITICAL PATH METHODS UTILIZATION.
3 rd Party Registration & Account Management SMT Update To AMWG February 23, 2016.
1 Equipment Maintenance Service Maintenance Form.
Presented By: Aaron Goodwin Mike Pyrkosz April 15, 2004 Aquarium Wave Generator Project # A Design Review.
Engineering Operations Outage Status: New shielding of HHFW/in-vessel components has been completed. Fit-ups of OH bus lead upgrades to reduce error fields.
CLIC Permanent Magnet Quadrupole update 27 th January 2011 Mechanical Engineering status update N. Collomb1.
Ross Parkman PE Ryan Wester PE Central Chiller Plant Experience Big Ten and Friends Mechanical and Energy Engineering Conference October 1, 2013.
Table Discussions 2015 SE Meeting. Scenario #1-Project Completion A $1 million bridge replacement project has a completion date of August 1 th. This date.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
3 rd Party Registration & Account Management SMT Update To AMWG March 22, 2016.
JSC UZBEKENERGOTAMIR A specialist enterprise with more than 45 years of experience in overhauling an maintenance. 1.
Agenda ‒ Cost Management ‒ Cost Budgeting ‒ Cost Control Learning Goals 1.Cost Control 2.Earned Value Management.
Approaches to Historic Bridge Rehabilitation Case Study #3
Making a Large DI Casting with Foam
OBJECTIVES Discuss how to diagnose problems with disc brakes.
Pavement condition index calculation
C Air Compressor Up-fit and Plumbing Guide For LDI B3
4th Annual Construction Law Summit
Detail Drawings and Assembly Drawings
RELIABILITY Reliability is -
Presentation transcript:

PROJECT STATUS UPDATE Hyatt Modernization Program Pump-Turbine Refurbishment, Units 2, 4, and 6 January 11, 2006 Farshid Falaki, PE

Hyatt Powerplant Pump/Turbine Refurbishment CV=+$99,012 SV=+$801,304 CPI=1.007 SPI=1.06 CSI=1.07

Hyatt Powerplant Pump/Turbine Refurbishment FY 99/00 FY 00/01 FY 01/02 FY 02/03 FY 03/04 FY 04/05 FY 05/06 FY 06/07 FY 07/08 Total Origin Engr Cost $154,000 $448,000 $192,000 $452,000 $450,000 $493,000 $329,000 $196,000 $0 $2,714,000 Cont Pay $655,000 $3,585,500 $14,997,000 Est. $1,107,000 $4,035,500 $4,078,500 $3,914,500 $3,781,500 $17,711,000   Latest $94,421 $255,855 $258,522 $277,663 $618,067 $1,031,000 $1,168,500 $292,599 $20,000 $4,016,627 $1,540,271 $5,500,000 $5,000,000 $1,425,379 $13,465,650 $2,158,338 $6,531,000 $6,168,500 $1,717,978 $17,482,277 $1,785,387 $622,153 $3,912,068 Actual $2,755,427 $5,154,575 $9,450,273 Cost $4,540,814 $5,776,728 $13,362,341 Note: Actual costs are shown up to December 22, 2005. Latest estimate is based on Project Detail, Rev 5 dated 1/12/2005.

Hyatt Powerplant Pump-Turbine Refurbishment – Contract schedule Work Item Original Date Actual Date Notice To Begin Work 11/05/2001 11/07/2001 Complete Model Testing 10/23/2002 12/12/2003 Begin Disassembly of 1st Unit 10/01/2004 Complete Installation of 1st Unit 03/25/2005 06/03/2005 Begin Disassembly of 2nd Unit 09/01/2005* 10/03/2005 Complete Installation of 2nd Unit 03/15/2006* Begin Disassembly of 3th Unit 10/03/2006* Complete Installation of 3th Unit 03/15/2007* Close Contract 09/15/2007* * Revised schedule for 2nd and 3th units.

Hyatt Powerplant Pump/Turbine Refurbishment – Unit 2 After disassembly, all components were shipped to GE facilities for repair and refurbishment. Work is being performed both in the field and in the various manufacturing shops. After sand blasting the unit, several cracks were discovered on the stay vanes/stay rings and on the casing. Cracks on the stay vane/stay rings: On November 4, 2005, the Department discovered several cracks that were mostly shallow except for a few that seemed to have propagated through the entire thickness of the stay ring. Based on our investigations, the cause of these cracks were shrinkage porosity that probably occurred during the original casting. These cracks were excavated to the depth of 2 inches and repairs were completed on 11/19/2005.

Hyatt Powerplant Pump/Turbine Refurbishment – Unit 2

Hyatt Powerplant Pump/Turbine Refurbishment – Unit 2 Cracks on the casing: On November 21, 2005, GE Hydro began to replace the drum head due to discovery of cracks on the weld. However, numerous cracks were found behind the drum head on the spiral case. This was the first unit with these types of defects on the casing. Due to the specialized nature of welding T-1 steel, the Department requested that the same GE subsidiary repair these cracks as had repaired previous cracks found around spiral case access doors. This was mutually agreed up on since GE indicated that they do not have the expertise in-house to repair these type of cracks. WSI completed the repair of the cracks on December 14, 2005.

Hyatt Powerplant Pump/Turbine Refurbishment – Unit 2

Hyatt Powerplant Pump/Turbine Refurbishment – Unit 2

Hyatt Powerplant Pump/Turbine Refurbishment – Unit 2

Hyatt Powerplant Pump/Turbine Refurbishment – Unit 2 Drum Head Third Party Repair Casing Crack Heat Treatment

Hyatt Powerplant Pump/Turbine Refurbishment – Unit 2 Drum Head Grouting Drum Head Stiffeners

Hyatt Powerplant Pump/Turbine Refurbishment – Unit 2 On November 7, 2007, GE completed the as found measurement of the unit. On November 11, 2005, GE Hydro started in-place machining of the spiral case and completed the machining on November 22, 2005 and removed the machining equipment. On December 5, 2005, GE Hydro informed the Department that the lower wicket gate mounting flange is out of level by 0.035 inches. It seems that GE inadvertently used an out of caliber measuring instrument causing error in many of their readings.

Hyatt Powerplant Pump/Turbine Refurbishment – Unit 2 On December 16, 2005, GE Hydro re-installed the machining equipment (after all repair welding on the casing was completed) and re-machined the spiral case machined surfaces. This issue is impacting the schedule since GE was not able to provide the stack height to Lachine manufacturing facility for refurbishment of turbine components in Canada until all field machining was completed and verified. This has delayed the delivery of the turbine components from mid December 2005 to mid January 2006. Based on GE’s latest schedule, the Unit completion date has been changed from 3/15/06 to 4/7/06.

Hyatt Powerplant Pump/Turbine Refurbishment – Unit 2 Machining O-Ring Surface Machining Weld Seal In Draft Tube

Hyatt Powerplant Pump/Turbine Refurbishment – Unit 2 After disassembly, GE Hydro provided the shaft run-out, shaft coupling bore, and chord measurements. Due to excess run-outs, Department directed GE to correct shaft coupling bore misalignment and chord misalignment. All shafts (except for generator shaft) were shipped to Hitachi Canadian Industry in Saskatoon for shaft string correction work. After detailed measurement of each shaft in the shop, it was determined that majority of the dimensions were within IEEE 810 standards. It is believed that the excess TIR problems on the shaft are associated with poor design of the thrust collar installation on the shaft.

Hyatt Powerplant Pump/Turbine Refurbishment – Unit 2

Hyatt Powerplant Pump/Turbine Refurbishment – Unit 2 Polishing Intermediate Shaft, 12/14/05

Hyatt Powerplant Pump/Turbine Refurbishment – Unit 2 The runner for unit 2 was mostly manufactured in Norway and shipped to Lachine, Montreal to be completed. In Norway, GE had performed numerous NDTs on the runner utilizing ultrasonic testing (UT) method. The tests showed 24 m of defects on the runner. 10 Meters of the alleged defect was excavated prior to shipping the runner to Canada; however, no defects were detected. In Lachine, the excavated area was repaired. Due to numerous false indications by UT tests, GE decided to use RT rather than UT to perform NDTs. As the result of RT tests, GE found 5 inches of defects, which the defected area was excavated and repaired.

Hyatt Powerplant Pump/Turbine Refurbishment – Unit 2 Second Runner – Repairing Defects after RT Examination

Hyatt Powerplant Pump/Turbine Refurbishment – Unit 4 After partial failure of the coating on unit 4, GE was asked to proceed with re-coating of the entire spiral case and repair the coating in the draft tube as warranty work. Department issued a clearance on unit 4 on November 28,2005 for sand blasting and coating. Department directed GE to replace the original EnduraFlex coating in the spiral case with Chesterton to eliminate the problems associated with transition between two dissimilar coatings. The coating was completed on December 21, 2005.

Hyatt Powerplant Pump/Turbine Refurbishment – Unit 4 Spiral Casing Coating, 9/29/05

Hyatt Powerplant Pump/Turbine Refurbishment – Unit 4 Spiral Case New Coating, 12/16/05 Spiral Case After Sand Blasting

Hyatt Powerplant Pump/Turbine Refurbishment The Department conducted Unit 4 field performance tests in turbine mode and pump mode on 10/26/05 and 10/29/05 respectively: Guaranteed weighted efficiency of the unit in turbine mode at the head of 615 feet: 92.2% Guaranteed pump-turbine efficiency in the pump mode at the head of 592 feet and 1870 cfs : 90.9% The preliminary test results of unit 4 field performance tests are as follows: The weighted turbine efficiency at the head of 615 feet: 91.52% The pump efficiency at the head of 625 and 1635 cfs: 89.44% Contract specifications allows 1.5% allowance for instrument uncertainty. The above test results are shown without adding instrument uncertainty allowance.

Hyatt Powerplant Pump/Turbine Refurbishment QUESTIONS?