Egress & Core strategies

Slides:



Advertisements
Similar presentations
By Aaron Doughty. Determine Space Requirements Location Amenity and Service Requirements Parking Number of employees/ offices etc Survey the Market/ Selection.
Advertisements

Unitech Unihomes 2 : Sector 117, Noida. Being developed by Unitech, Unihomes a 70 acres project site close to the heart of Noida, is the address you have.
Abcdabcd Low Rise Buildings The Built Environment in which we live is composed of:- Buildings Travel systems Services Disposal & Treatment Systems. The.
Introduction to Lateral Force Resisting Systems
CORE DESIGN.
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
COMMERCIAL LEASING 101 Cheryl W. Hamm, CCIM, GRI.
Basics of leases.
Lecture 33 - Design of Two-Way Floor Slab System
Civil Engineering & Architecture 2.3 Residential Design.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
Building Core Elements and Design
Designing Tall Buildings: Why is it different
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
GEOG 442 Day 7: Commercial and Industrial Users (with a bit on Institutional)
Blue Prints.
High Rise Structural Systems
 Downtown (City/Urban) Areas  Neighborhood Shopping Centers  Community Shopping Centers  Regional Shopping Centers  Super Regional Shopping Centers.
Session Plan Chapter Nine: – Retail and Office properties as an investment alternative – Discuss two retail and two office cases – Mini-Case on the DCF.
1 PLANNING YOUR NEW RADIO FACILITY Don Mullally WILL-AM-FM-TV University of Illinois.
Foundations of Real Estate Management BOMA International ® Module 1: Real Estate Administration Leasing and Marketing ®
PERFORMANCE & CODE ANALYSIS TIMBer Inc. ·Brooke Fedder · Marie Rottschaeffer· Izzie Molinuevo· Tena Pettit·
Knocking The Rust Off The Rust Belt Calfee, Halter & Griswold LLP, The Calfee Building, 1405 East Sixth Street, Cleveland, Ohio Cleveland | Columbus.
A Building Area: (sf) 32,000 sf Cost per Square Foot: $62.50/sf Construction Cost $20,000,000 Date of Substantial Completion: May 2006 Location of.
1 Module 8 STATION AREA PLANNING. 2 Module 8 Station Area Planning Key Concepts and Definitions Station Area Planning Process 1.Define the Station Area.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
Chapter 22 Leases and Property Types REAL ESTATE FIN 331.
World Trade Center 7 Building Performance Assessment.
505 Congress Street South Boston R E C REATE, LLC Tim Johnson, Jennifer Balkcom, Scott Nguyen, Arvind Pai, Alison Novak, Charu Singh Re-imagining the Boston.
Reading Structural Drawings
Wall and Ceiling Construction
RAHINAH IBRAHIM Stanford University Architect CRAIG LONG Kansas University Engineer JORGE FUENTES Stanford University Construction Manager ROXANNE ZOLIN.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Alkek Expansion Pre-Submittal Conference October 5, 2006.
Code Analysis. Identify the relevant codes  Local building code  Local accessibility code (or ADA)  Local fire code (or the NFPA)  Mechanical, electrical.
Wall and Ceiling Construction
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Stability systems in high rise buildings - Neo Bankside, Southbank, London - The Gherkin (Swiss Re Bank) 30 St Mary Axe, London Maryam & Elisavet.
Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
1130 Connecticut Ave. Washington, DC * 218,750 SF Bldg *25% Vacancy * Built 1986 * Rent = ~$46/SF * Office Building * Valuation =~$91M.
Project Introduction  New high-tech classroom and lab facility  Area : 30,000sq.ft.  Function –To provide a home for innovative courses that take a.
ID 234 Building Codes Fall 2012 Means of Egress Chapter 4.
Computer Associates International, Regional Office
FLAT SLAB Flat slab are also known as beamless slab, is a type of slab in which the flooring slab is directly supported on columns without the agency of.
200 Minuteman Drive New Design for Additional Floors and Vibration Sensitive Equipment Brent Ellmann Structural Option Dr. Linda Hanagan - Consultant.
ID 234 Building Codes Fall 2011 Means of Egress Chapter 3, part II.
Mayor’s Office on Disability City and County of San Francisco Discussion of Common Design and Construction Errors.
Building Classification Systems and Criteria By Norm Miller, University of San Diego and Anthony Guma, while at CoStar, Click on the sound icon.
Chapter 6 Commercial, Office, and Industrial Property Management.
Office Property Analysis
Structural Engineering: Skyscrapers
Skyscrapers.
CONDOMINIUM TOWER & PARKING
Total Fitness Gym By Student Architect Jhonatan Rubio
CMGT 380 Green Building Practices and LEED Certification
Lucas Pettinati Rafael Monzon Andreas Dinopoulos
Pre-Contract Cost Control
Managing Office Property
Mississippi Riverbank Project (Final Presentation) May 14, 1999
1 Semester Project Design A Multi Story Office Building
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
Located at Tufts University in Boston, Massachusitts
Table of Contents: 1. Historical background about the tall buildings. 2. Lateral Resisting Systems. 3. Using Technology in high rise building design.
Masonry Bearing Walls.
Literature Case study Literature case study consists of reading everything you can find on the subject. You can refer books in a library, use Google to.
LIFT,ESCALATOR AND MOVING WALKS
Northwest Office Center – 4334 NW Expressway
Presentation transcript:

Egress & Core strategies Building Planning… Egress & Core strategies

Example, multi-tenant office bulding Key issues Return on investment Clear circulation/wayfinding Maximize value of perimeter glass/views Allow for street level retail High net to gross ratio (what’s that?)

Net: What you can rent… Face of wall to face of wall The higher the net assignable square footage (NASF) the higher the income Also used to compare efficiency between concepts Gross: everything else Stairways Lobby Toilets Custodial Mechanical/electrical Wall thicknesses Amenity spaces (workout/atrium…)

Some common net to gross ratios Administrative buildings 67/33 Auditorium buildings 70/30 Courthouse 61/39 Hospital 55/45 Office buidling 75/25 (80/20 common) Science building 60/40 Warehouse 93/7 The larger number is usually the net…those functions that are the reason to build the building The smaller number is the net…those functions that serve the above.

… even star architects watch it very closely between schemes

Public/employee sequence dominates…but doesn’t locate elevators Lobby/Reception/directory/security retail retail Double loaded lobby allows two retail tenants Single loaded would allow one larger tenant Challenge might be identity Entry/vestibule

Other core responsibilities Besides housing egress, access, toilets and HVAC, cores often act as the primary space definition elements on a floor. They also are often used for lateral bracing of the structural frame, with walls reinforced to be shear diaphragms or with “X” bracing or chevron bracing concealed within their enclosing walls

Core location…always center?

Willis Tower, Chicago 53,000 net rentable s.f.

Empire State Designed for Rapid-Building … 2,768,591s.f. in 410 days? 6,752 s.f. per day! Standard Bay sizes Standard Mullion spacing Stone sizes fit to milling equipment Steel sizes fit to transport/lifting equipment

Setbacks change floor plates Meeting zoning required stepping back the building, reducing the number of repeated floors Upper floors consumed by elevators (73 total)

End Core location responds to local conditions…view, climate… What looks problematic?

Lever House, NYC, Gordon Bunshaft, 1952

Multi Core placement for large floor dimensions (<300’)

Sendai Mediateque, Ito atomizes the core

So…if its an office building… Alley Easy Street Adjacent structure High-value corner retail Lower-value streetfront retail Main Street

…but the tail can’t wag the dog The corner retail will produce higher rental costs, but will it compromise the 15 floors of building above it? The street-front retail will tolerate more spatial disruption due to its lower rents, but how much can we intrude on it?

Time to consider the cores coreS?...not just one? Every floor will need Elevator access 2 means of egress (elevators won’t count) Toilets for each gender Some electrical/telecom space Some space for ventilation/hvac Could be a shaft Could be a fan room

A midrise building core men elevators mech egress egress women Will Paton, final study F2011

Basic organization forms You might generate alternatives in more than one Or the site, or inner organization of the clients enterprise might hint at which is most appropriate Ultimately these begin to form a backbone, an armature to hang the building infrastructure upon.

Deploying infrastructure Building planning is a design stage where the infrastructure elements of the building are located in ways that meet the appropriate codes and delineate space for the primary functions of the building

Put these somewhere…in a way that makes the primary functions better Elevators Stairways Entry/Lobby Toilets Mechanical/Systems spaces Circulation elements, corridors, egress paths

Know the land From a building planning perspective, this might mean answering these questions Where do we enter? Where should trash and deliveries go? Does the building have to be phased or planned for an addition? Which orientation or orientations have the highest value? Which have the lowest?

Know a few things about the code …how to get out in a fire …how to arrange exits …how big they have to be …

Egress Promoter P.T. Barnum is said to have charged people 25 cents to enter a darkened room and “See the Egress.” Once in the darkened room, the people could only see a dim light over a door with a sign on it saying “This way to the Egress.” Upon opening the door and walking through they found themselves on the street! Egress is the term applied to the various means (corridors, stair enclosures, stairs) to be used as a means of escape in the event of a fire or other disaster in the building.

Some key IBC Definitions Area of Refuge: Area where persons unable to use stairways can remain temporarily to await instructions or assistance during emergencies Corridor: An enclosed exit access component that defines and provides a path of egress travel to an exit. Exit: That portion of a means of egress system which is separated from other interior spaces of a building by fire resistance rated construction and opening protectives as required to provide a protected path of egress travel between the exit access to the exit discharge including exit doors, exit enclosures, exit passageways

How Many People? The IBC offers the choice of two processes for determining the number of people (occupants) in the building. The first method is to determine the actual number of people in the space. This is easier to do in a building with fixed seating (auditorium) than in say an open office space where, the density varies over time. The second method is to refer to the Maximum Floor Area per Occupant table, find your use type, divide the number of gross square feet per occupant in the table into your project’s gross square footage to arrive at the number of occupants in the building, or per floor.

Occupant load table …excerpted So our Business Occupancy would take the program area (40,000 s.f.) and divide it by 100 s.f. to determine we have 400 occupants

Egress convergence 100 As the occupants from a floor above exit through lower floors, they don’t impact the exit size for the floor the pass through, but the exit size cannot get smaller. But when exits converge at a floor, like the ground floor where they leave the building, the occupant load for the ground floor must take into account the occupant load of the floor immediately above. First floor, 10,000 s.f. = 100 occ + 100 from second, 200 occupants 100 100 100 + 100

How wide does that make the exit? The IBC reads “The total width of the means of egress in inches shall not be less than the total occupant load served multiplied by” .3 for stairs in unsprinkled buildings .2 for corridors, other egress components in unsprinkled buildings .2 for stairs in sprinkled buildings .15 for other components in sprinkled buildings So our top floor stair in our unsprinkled example could be no less than 100 x .3 or 30 inches…not nearly wide enough to meet minimums of the IBC or ADA So the code continues to read “nor less than specified elsewhere in this code” so it let’s itself out of an apparent contradiction

Stairways Two required Fully enclosed with 2 hour fire rated construction Minimum stair width 48” Max stair width without intermediate railing = 5’ Minimum headroom 80” from nosing line Max height between landings = 12’-0” Max riser 7” Min tread 11” Within 3/8 of same dimension for all steps Minimum depth Of Landing, 48” Max intrusion of door on landing = 7”

Stairways…cont’d Handrail height 34” - 38” Handrails required both sides. 1-1/4 to 2” dia, 1-1/2” from wall (clear) Handrails must extend 12” beyond top riser, and one tread (11”min) beyond bottom tread 12” 11”

2 exit spacing Exits cannot be closer than 1/2 the maximum diagonal distance of the floor plate 80 feet Diagonal is 100’ long so 1/2 diagonal is 50 feet 60 feet

2 exit spacing So in this example, the exit stairs could not be placed closer than 50 feet apart Maximum travel distances would be for this type ‘B’ building 200 feet without sprinklers 250 feet with sprinklers What would be the maximum stair spacing in a sprinkled type ‘B’ building? So stair entries must be 50 feet apart, minimum 80 feet 50 feet 60 feet

Dead End Corridors Dead End 20 feet A corridor not ending in an exit is considered a dead end corridor Dead end corridors are limited to 20 feet in length in most occupancies. In occupancy group B with a sprinkled building, the dead end can be extended to 50 feet long. Ends in an exit Not a dead end

On your way to the exit... DO NOT plan the egress path to exit through another tenants space DO NOT plan the egress path to exit through storage spaces, kitchens, mechanical rooms…or other high hazard occupancies. But exiting through a non hazardous accessory space is acceptable, as long as there is a clear path discernable to the exit.

Where do we enter? Prominence Number of entries Security Types Public Employee Service Shipping/receiving

A 150x250 site Alley Easy Street Adjacent structure Main Street

Zoning setbacks Alley Easy Street Adjacent structure Main Street

Where do we enter? Alley Easy Street Possible Service Adjacent structure Possible Service Barrier! No view! Possible employee entry Best public/ employee entry Main Street

Now you need the insight If the employees have to clock in, change clothes, and report to the workspace, then the lockers/lunchroom/timeclock need to be near their entrypoint If they just walk in and go to their workstation, there’s no need for this

Now you need the insight If there is a public/retail first floor, the street-fronts become high value, so putting employee or utility functions there would be counterproductive If the business ships and receives high volumes of product, then the side-street and alley become high value. Regardless, we need to keep in mind, trash storage, backup generators, and misc. delivery

Example, multi-tenant office bulding Key issues Return on investment High net to gross ratio (what’s that?) Clear circulation/wayfinding Maximize value of perimeter glass/views Allow for street level retail

Public/employee sequence dominates…but doesn’t locate elevators Lobby/Reception/directory/security retail retail Double loaded lobby allows two retail tenants Single loaded would allow one larger tenant Challenge might be identity Entry/vestibule

If its an office building… Alley Easy Street Adjacent structure High-value corner retail Lower-value streetfront retail Main Street

…but the tail can’t wag the dog The corner retail will produce higher rental costs, but will it compromise the 15 floors of building above it? The street-front retail will tolerate more spatial disruption due to its lower rents, but how much can we intrude on it?

Time to consider the cores coreS?...not just one? Every floor will need Elevator access 2 means of egress (elevators won’t count) Toilets for each gender Some electrical/telecom space Some space for ventilation/hvac Could be a shaft Could be a fan room

A midrise building core men elevators mech egress egress women Will Paton, final study F2011

A minimal stair 48 inches between handrails 1.5” handrails (each side) that are 1.5” from the walls So a single run of stairs is 54” wide If the stair runs between 12 foot floors, 12x12=144” of rise divided by max riser 7.0 = 20.5 risers, say 21 at 6.8” or just over 6 and ¾ inches. always one less tread than riser so 20 risers at min dimension of 11 inches so 20x11inches = 220 inches or 18 feet 4 inches of horizontal run, add 6-5 foot landings at the top and bottom if doors open into the stairs) (and, not counting the ARA), the overall inside of the straight run stair is 31’2” x 5’4” wide. now work out a dual run stair.

Building Planning… Part II Core strategies

Other core responsibilities Besides housing egress, access, toilets and HVAC, cores often act as the primary space definition elements on a floor. They also are often used for lateral bracing of the structural frame, with walls reinforced to be shear diaphragms or with “X” bracing or chevron bracing concealed within their enclosing walls

Core location

Core location

Lever House, NYC, Gordon Bunshaft, 1952

Core location

Sendai Mediateque, Ito atomizes the core

Considering cores… Alley Easy Street Adjacent structure High-value corner retail Lower-value streetfront retail Main Street

A minimal stair 48 inches between handrails 1.5” handrails (each side) that are 1.5” from the walls So a single run of stairs is 54” wide If the stair runs between 12 foot floors, 12x12=144” of rise divided by max riser 7.0 = 20.5 risers, say 21 at 6.8” or just over 6 and ¾ inches. always one less tread than riser so 20 risers at min dimension of 11 inches so 20x11inches = 220 inches or 18 feet 4 inches of horizontal run, add 6-5 foot landings at the top and bottom if doors open into the stairs) (and, not counting the ARA), the overall inside of the straight run stair is 31’2” x 5’4” wide.

Stairways Two required Fully enclosed with 2 hour fire rated construction Minimum stair width 48” Max stair width without intermediate railing = 5’ Minimum headroom 80” from nosing line Max height between landings = 12’-0” Max riser 7” Min tread 11” Within 3/8 of same dimension for all steps Minimum depth Of Landing, 48” Max intrusion of door on landing = 7”

Stairways…cont’d Handrail height 34” - 38” Handrails required both sides. 1-1/4 to 2” dia, 1-1/2” from wall (clear) Handrails must extend 12” beyond top riser, and one tread (11”min) beyond bottom tread 12” 11”

Other core responsibilities Besides housing egress, access, toilets and HVAC, cores often act as the primary space definition elements on a floor. They also are often used for lateral bracing of the structural frame, with walls reinforced to be shear diaphragms or with “X” bracing or chevron bracing concealed within their enclosing walls

Considering cores… Alley Easy Street Adjacent structure High-value corner retail Lower-value streetfront retail Main Street

Chicken or the egg? What sets the core-to-skin distance?

How far is it from the core to the skin?

Know your typology…what’s that mean?

typology meets client culture…meets market…

Client Culture, Organization, and Form

Market needs inform

Modularity…common denominators… Planning grids Structural grids Lighting grids Power grids Mechanical grids

Built from the most common…and smallest acceptable unit of space

10’ Minimum skin to core? 14’ 6’ 10’

10’ 10’ 10’ Minimum structural? 14’ 6’ 10’

Check structural capability Steel Frame Cast-in-Place Concrete Frame Precast Frame

Steel R.O.T. p.356 Depth of Girders = 1/15 span (width=1/3 to 1/2 depth) Depth of Beams 1/20 span (depth of slab included in composite structures) Depth of bar joists 1/20 span (spacing 2 to 10 feet depending on decking / concrete thickness) Depth of decking and concrete for floors 1/24th of span (2 1/2 to 7 inches typical) Depth of decking for roof 1/40 th of span (1 to 4 inch decking available)

Bay proportions…are long girders better? 20’ Here the girders are spanning 40’ and are framing into the columns and carry the secondary floor beams. This requires W30x108 girders And W16x26 beams With a 5 1/4” slab over the beams that’s 6,400 pounds of steel in this bay 40’ 16” 30” 14” for ductwork, lights...

Site-Cast-Concrete Systems…Basic flavors Basically, there are 4 types of slabs an architect chooses from when considering a system for a project. Slabs are usually flat, can be reinforced to span one way or two ways. Their span usually depends on their depth, but there is a point where the extra concrete in the depth works against the slab due to its weight. Joist slabs usually can span farther and carry heavier loads because they eliminate concrete not contributing to the slabs strength. (hence the joists) All diagrams from Allen “Architects Studio Companion”

One way flat slabs…will it work? The one way slab spans between beams or columns. It requires a structural bay (spacing between columns in both directions) that is within 20% of being square. It is usually used for light loading applications where it’s thin structural depth gives a low floor to floor height. When heavily loaded it requires the beams below the slab, It is more desirable to NOT have these beams as they take additional labor to form and pour. Costs 25x25 6” 40psf load about $13.80 per sq.ft. 25x25 6” 125psf load about $17.20 per sq.ft. Span min 6’ Span max 18’ R.O.T. Slab depth 1/22th of span Postten rot Slab depth 1/40th of span Min thick for 2hr = 5” Min thick for 3hr = 6 1/2”

One way joist slabs Joist Slab Joist band (beam) void To address heavier loading conditions, its necessary to remove the concrete that’s acting as dead weight - working against the slab that comes along with an increase in the uniform thickness of a slab. This one way joist slab does just that, using prefab formwork set on a plywood deck voids are formed between the joists which make the slab lighter, and stiffer. The joists bear into beams (called bands) spanning from column to column. These bands give this system the ability to move columns off the grid, (as long as they still fall under the bands) allowing for more plan flexibility. Costs 25x25 12” 40psf load about $14.10 per sq.ft. 25x25 12” 125psf load about $16.50 per sq.ft. Span min 12’ Span max 45’ R.O.T. Slab depth 1/18th of span Postten rot Slab depth 1/36th of span Min thick for 2hr = 5” Min thick for 3hr = 6 1/2”

Standard Spanning elements Solid slabs Hollow core slabs Double tees Rectangular beam “L” beams “T” beams

Each piece is numbered for location according to the shop drawings. This producer also dates each piece to be certain only fully cured components are installed Castellated joint

Hollow Core slabs Like sitecast slabs, when the depth of a solid slab increases past a certain point, the extra weight of the concrete works against the spanning member. In precast, the hollow core slab, removes unemployed concrete increasing the structural efficiency of the slab. Unlike the solid slab, the hollow core slab is reinforced with prestressing strands in the top and bottom of the slab.

Spanning The hollows are made in different ways by different companies. Some have expanding air cylinders, some use pea gravel laid in the bottom half of the pour. Span max 45’ Widths 2’-0”, 3’-4”, 4’-0”, 8’-0” Span / Depth ratio 1/40 Min produced depth 6” (2” increments) Max produced depth 12” Cost per s.f. topped $12.50 Cost per s.f. untopped $10.50

aka the plank Like the solid slab, the hollow core slab (also known as the hollow core plank) has castellated joints to form shear keys when filled with grout. This helps the planks work together and increases structural efficiency. Like other precast systems when used as floors, the hollow core plank needs a topping slab (2” or so) to level out the camber differences, make a diaphragm for lateral resistance, and make a place for electrical and hot water heating utilities.

Long beams, short planks or long planks short beams? 20’ Long beams, short planks or long planks short beams? One way 8” 3’-4” 2’-8” 40’

40’ 20’ The longer a beam spans, the deeper it must be. While the plank stays pretty much the same. (the number of prestensioned strands increases) In this example, say the beam span is 20 feet, the rule of thumb of d=1/15 s gives 20/15=1’-4” deep. The plank spans 40 feet here and which gives an 12” plank. This makes a 2’-4” deep structural sandwich

40’ 20’ That’s a FOOT thinner! In a 8 story building it gives the owner an extra floor for FREE! So bay size has a LOT to do with structural depth, which has a significant impact on the projects economics! 12” 2’-4” 1’-4”

Beams & floor to floor heights…look familiar? Supporting the spanning member on top of the beam adds to the floor to floor height, but, if the spanning member on top of the beam is a single or double tee, the space between the top flange and bottom of the stem is available for ductwork to pass over the beam with no conflict! Duct Duct Space!

Mechanical Planning Is mostly about providing ventilation …and cooling …with big…noisy…machines You can choose to Centralize or Decentralize the air handling machinery in the building Mechanical Planning Hybrid Centralized: Big vert shafts Decentralized: Mech rooms each floor

If Shafts…plan for trunks Trunk ducts are the main ducts that emerge from the shafts Since they serve large areas of floorspace, they contain lots of air and are bigger than distribution ducts Don’t trap shafts behind elevators and stairs

If Shafts…plan for trunks Plan return ducts to run inboard of supply…supply has to be delivered to the building skin, returns can be interior

Structure & trunk ducts Short span Plan a short structural span next to the core if possible, it makes for a thinner structural section to allow trunk ducts to pass long span

Put it all together… Seeking modularity You’re looking for the common denominators Is the smallest space an increment of the largest? Will the smallest plus a circulation path be modular with the most frequently found space increment? Is the structure an increment of the smallest and largest spaces? Remember.. Grids don’t need to be uniform Core functions can be environmental buffers Smaller grids spacing makes for shallower structure, very helpful if coordinated with maximum ductwork depth Mechanical zones are usually functional, environmental or some combination of the two. Ductwork is best run over circulation spaces, it gives better acoustic isolation.