1 Computer Associates International, Regional Office
Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April 15, 2003

2 Presentation Outline Background Information
Existing Structural Conditions Design Criteria Redesign Construction Management Lighting Design Conclusions and Recommendation Acknowledgements SETH R. TAKOCH STRUCTURAL OPTION

3 Location 15min. Off Beltway 35mins. Outside D.C Wood Oak Dr.
Baseball Field

4 Background Information
Function: Computer Associates Int. Regional Headquarters Size: 233,000 sq. ft. – 6 floors Rentable Office Space: 207,000 sq. ft. Architectural Features: Precast Concrete Façade with Glass Curtain Wall Six Story Glass Enclosed Atrium Adjacent Day Care Facility

5 Project Team Owner – Computer Associates International
Arcitect – Davis, Carter, Scott Structural Engineer – Smislova, Kehnemui, & Associates. General Contractor – Clark Construction Developer – Tishman Speyer Properties Mechanical – GHT Limited Plumbing – GHT Limited

6 Existing Structure Flat Slab Construction Concrete Structure
30’ x 30’ Bays 9” Thick Slab Thickness 10’ x 10’ x 5-1/2” Drop Panels 24” x 24” Conc. Columns

7 Existing Structure Wind Loads are Transferred by Diaphragm Action of Façade Transferred to Framing by Tributary Area 8 Frames N-S and 9 Frames E-W Concrete Frames Resist Lateral Forces Short and Long Frames Floor Slab Adds Resistance due to Diaphragm Action

8 Design Limitations 50 psf 22 psf 30 psf Old Code – BOCA 96
New Code – IBC 2000 Local Zoning Ordinances Similar Square Footage Minimal Architectural Changes Floor-to-Floor Heights LIVE LOADS PER IBC 2000 LOAD TYPE LOAD ROOF ( RAIN ) 50 psf ROOF ( SNOW ) HIGH ROOF 22 psf ROOF (SNOW) LOW ROOF 30 psf OFFICES, CUBICLES ASSEMBLY, STAIRS 100 psf MECHANICAL 150 psf CORRIDORS 80 psf

9 Proposal To Redesign a Feasible and Desirable Alternative Structural System and to Incorporate Construction Costs and Schedule Length Into My Solution Time = Money … Money = Time $$$$

10 Possible Faming Alternatives
Composite Steel Construction Non-Composite Steel Construction

11 Steel Construction Code – IBC2000 LRFD Analysis Parameters
30’ x30’ Typical Bays Fy = 50ksi ASTM A992 Steel F’c = 3ksi Normal Weight Concrete Shear Studs - 3-1/2”high, ¾” diameter (composite) 22 gage Metal Deck

12 Composite Steel Construction
Gravity Analysis – RAM Determined Beam Sizes Determined Column Sizes 2 Story Column Lengths 26’ – 28’ Tall Ranging from W10’s to W12’s Beam Sizes W12x14 Spaced at 6’ o.c. Girders as Deep as a W21’s

13 Non-Composite Construction
Gravity Analysis – RAM Determined Beam Sizes Determined Column Sizes 2 Story Column Lengths 26’ – 28’ Tall Using W12’s Beam Sizes W12x14 Spaced at 6’ o.c. Girders as Deep as a W24’s

14 Depth Comparison Composite Steel Average – W12’s Critical Depth – W21
Composite Saves 20 Tons of Steel Non-Composite Steel Average – W12’s Critical Depth – W24 Advantage – Composite Steel Construction

15 Lateral System Shear Wall to Resist Lateral Loading
Based on Critical Wind Loading and Torsion 2 – 60’ Long Shear Walls Reinforced to Resist Forces Deflection of h/400

16 Design Reinforcement Based on the Following
Wall Floor Shear Bending 1 12" 8 - #11 2 6 - #11 3 6 - #9 4 12" 4 - #9 5 12" 2 - #9 6 12" 1 - #9 12" 12" 12" Reinforcement Based on the Following Vn =  (2f’c bd + Avfyvd/s) Mn = Asfy (d-a/2)

17 Construction Management
` Address Two Main Issues Cost Comparison Project Duration

18 Construction Management
` Total Building Cost D4 Cost Total = $27,678,667 20-25% Accurate Range of $34.6 million to $20.8 million Not Very Accurate $ / sq. ft.

19 Construction Management
` Total Building Cost Means Building Construction Cost Data Separate Estimates for Steel and Concrete 10 -15% Accurate More Precise Than D4 Steel Framing = $96.74 / sq.ft. Concrete Frame = $98.45 / sq.ft. Difference = $1.71 / sq.ft. = $410,400

20 Construction Management
` Cost Comparison D4 Cost = $115.33/sq.ft. = $27,678,667 Means Steel = $96.74/sq.ft. = $23,217,600 Means Concrete = $98.45/sq.ft. = $23,628,000 Percentage Savings Using Steel = 1.7% Savings

21 Construction Management
` Scheduling Means Data to Calculate Duration Primavera Utilized to Schedule Sequences Total Duration Steel Erection = 376days Total Duration Concrete Placement = 847 days

22 Construction Management
` After Scheduling Concrete – 260 Days

23 Construction Management
` After Scheduling – 150 Days

24 Construction Management
` Savings Advantage Composite Steel Construction Time Advantage Composite Steel Construction Composite Design is Considered One of the Most Economical Methods of Floor Construction for an Office Building

25 Construction Management
` Crane Sizing On Site 3-1/2 Months Tower Crane Placed Through Atrium Liebherr 200HC Hook Radius – 197ft. Capacity – 5,070# Satisfies Critical Lift of

26 Lighting Design Design of Lighting of Daycare Facility
Minimum Footcandles of 30fc Fluorescent Luminaries 120’ x 56’ Space to Illuminate 2’ x 4’ Fixtures with 3” Louvers Spaced on a 16’ x 8’ grid Specification From Lithonia Workplane of 2-1/2 ft.

27 Lighting Design Designed Using Luxicon Renderings on April 15, 2003
At 9:00 am with Daylighting At 1:30 pm with Daylighting At 5:00 pm with Daylighting Without Daylighting

28 Lighting Design 9:00 am

29 Lighting Design At 1:30 pm

30 Lighting Design At 5:00 pm

31 Lighting Design Without Daylighting

32 Lighting Design The Lighting Design Meets Required Parameters of 30fc

33 Conclusion In Conclusion, Composite Steel Construction is a Better Alternative to Non-Composite Construction. Composite Steel is a Viable Alternative to a Two-Way Flat Slab System

34 Shout Outs’ My Family My Friends The AE Student Body
The Entire AE Faculity Smislova, Kehnemui, & Associates, P.A. Computer Associates The ‘U’ And All Of Those Out There That Stuck With Me

35 ? Questions