JAB Plastic Products Corp. Technical Information.

Slides:



Advertisements
Similar presentations
ODOT Structure Project Manager Seminar Concrete Decks
Advertisements

Concrete Construction Part 1
1 Chapter 7 Length of flange Introduction As the bending moment decreases towards the support, the flange plate may be varied and a smaller flange.
Chp12- Footings.
Design of Slabs-on-Grade
Design of Concrete Structure I
Reinforced Concrete Design-8
Lecture 9 - Flexure June 20, 2003 CVEN 444.
Concrete Box Culverts (CBC)
Tests to Verify Low Strength Concrete ACI Georgia Chapter Virgil D. Skipper Seminar June 2009 Robert Jenkins, P. E.
VOBUG Conference August 3 rd, 2010 Nashville, Tennessee Robert LeFevre, P.E. Adam Price, P.E. Tennessee Department of Transportation Structures Division.
Overview Waffle Slab.
Engineering Perspectives on First Year of New Reactor Construction Mohamed Shams, Ph.D., PE Structural Engineering BC US NRC, Office of New Reactors July.
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Reinforced Concrete Design
Subpart R Steel Erection
PowerPoint ® Presentation Chapter 4 Flatwork Flatwork Applications Site Preparation Concrete Reinforcement Flatwork Procedures Joint Control Bleedwater.
Reinforced Concrete Flexural Members
Shear and Diagonal Tension
Lecture 15- Bar Development
1 Design and drawing of RC Structures CV61 Dr. G.S.Suresh Civil Engineering Department The National Institute of Engineering Mysore Mob:
Chapter-7 Bond Development Length & Splices
Lecture Goals Slab design reinforcement.
ONE-WAY SLAB. ONE-WAY SLAB Introduction A slab is structural element whose thickness is small compared to its own length and width. Slabs are usually.
Chp.12 Cont. – Examples to design Footings
Bridge Engineering (7) Superstructure – Reinforced Concrete Bridges
Masonry Wall Bracing A Simplified Approach To Bracing Masonry Walls Under Construction Produced by the Masonry Bracing Task Force.
Chapter 33 Foundation Systems.
The Good, the Bad, and the Ugly 2 May 2008 Sacramento, CA Alan Macnab
Concrete Quality Assurance: How Concrete is Specified and Supplied To Meet Construction Specifications Prepared By: Prof. Marcia C. Belcher Construction.
CM 197 Mechanics of Materials Chap 14: Stresses in Beams
Lecture Goals Doubly Reinforced beams T Beams and L Beams.
Proportioning of Concrete Mixtures
Reinforced Concrete Design II
EXAMPLE 9.2 – Part IV PCI Bridge Design Manual
REINFORCED CONCRETE Reinforced concrete is a composite material which utilizes the concrete in resisting compression forces, and steel bars and/or.
March 13, 2007 DRILL Architecture Styles and Vocabulary QUIZ tomorrow
Footings.
Code Comparison between
Placing Quality Concrete
COLUMNS. COLUMNS Introduction According to ACI Code 2.1, a structural element with a ratio of height-to least lateral dimension exceeding three used.
Introduction to Columns
SHEAR IN BEAMS. SHEAR IN BEAMS Introduction Loads applied to beams produce bending moments, shearing forces, as shown, and in some cases torques. Beams.
Lecture 21 – Splices and Shear
Chapter 12 Concrete Construction Part 3 1CE 417, King Saud University.
University of Palestine
Plain & Reinforced Concrete-1 CE-313
Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)
Umm Al-Qura University Department of Civil & Structural Engineering
Reinforced Concrete Design
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
Chapters Project title : Hirbawi Center A building lies in the east side of Tulkarm, this building consists of five stories of ( m 2 ) A building lies.
Session 15 – 16 SHEET PILE STRUCTURES
Sampling and Testing Concrete Mixes MATERIAL TESTING LABORATORY
Mechanical Properties of Materials
Reinforcement Information - Code
By Dr. Attaullah Shah Swedish College of Engineering and Technology Wah Cantt. Reinforced Concrete Design-6 Shear Design of Beams.
PILE FOUNDATIONS UNIT IV.
Concrete Inspection Construction Inspection for Field Office Activities.
5. FERROCEMENT.
Design and Control of Concrete Mixtures CHAPTER 11
Reinforced Concrete Design
Lecture - Design of Columns
Reinforced Concrete Design. Compressive Strength of Concrete f cr is the average cylinder strength f’ c compressive strength for design f’ c ~2500 psi.
Direct Design Olander vs. Heger
UTILITY VAULTS: THE PRECAST ADVANTAGE
Reinforced Concrete Design-I Design of Axial members
Competency: Design and Draw Foundation Plans
Competency: Design and Draw Foundation Plans
ACPA 2014 Pipe School – Houston, TX
Presentation transcript:

JAB Plastic Products Corp. Technical Information

WHAT DO CURRENT DESIGN CODES, STANDARDS AND MANUALS OF PRACTICE REQUIRE?

UNIFORM BUILDING CODE (UBC) 1997 UBC, VOLUME 2 – STRUCTURAL ENGINEERING DESIGN PROVISIONS Chapter 19, Section – Placing Reinforcement Chapter 19, Section – Spacing Limits for Reinforcement Chapter 19, Section – Concrete Protection for reinforcement Same requirements as for the International Building Code (IBC)

INTERNATIONAL BUILDING CODE (IBC) Section – Bar Support: Reinforcement bar shall be accurately placed and adequately supported before concrete is placed, and shall be secured against displacement within tolerances. Section – Tolerances: For Slab depth, d  8 inches; d, ± 3/8 inch concrete cover, – 3/8 inch For Slab depth, d > 8 inches; d, ± 1/2 inch concrete cover, - 1/2 inch Tolerance for Cover shall not exceed minus 1/3 the minimum concrete cover required by the approved plans or specifications.

IBC REQUIREMENTS, CONT. Section – Minimum space between bars in slab must comply with ACI 318, Section 7.6. S min. horizontally or vertically = One Bar Diameter or 1 inch Section – Minimum concrete cover for non pre-stressed cast in place concrete: Concrete permanently expose and cast against soil – 3” Concrete expose to soil or weather: For #6 through #18 Bar – 2” For #5 & W31 or D31 or smaller – 1½”

IBC REQUIREMENTS, CONT. Concrete not expose to weather or in contact with soil: For slab - #11 bar or smaller - ¾ inch Standard Specification, Division I – Design, Section 8.21 provides a minimum distance between reinforcement bars: AMERICAN ASOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO)

For bridges’ cast in place concrete slab: S min. = 1½ Bar Diameter or 1½ Max. Diameter of Coarse Aggregate or 1½ inches Standard Specification, Division I – Design, Section 8.22, Minimum concrete covers: Concrete expose to soil or weather: Primary reinforcement – 2” Stirrup, tie-up, spiral - 1½” AMERICAN ASOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO), CONT.

Standard Specification, Division I – Design, Section 8.22, Minimum concrete covers: Concrete slabs exposed to mild climates: Negative reinforcement – 2” Positive reinforcement - 1” Concrete slabs without positive corrosion protection and frequently exposed to deicing salts: Negative reinforcement – 2½” Positive reinforcement - 1” AMERICAN ASOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO), CONT.

Standard Specification, Division I – Design, Section 8.22, Minimum concrete covers: Concrete slab not expose to weather or in contact with soil: Primary reinforcement – 1½” Stirrup, tie-up, spiral - 1” Standard Specification, Division II – Const., Section 9.6, Placing and tie-up of reinforcement bars – requires: Tie-up all reinforcement bar intersection around the perimeter of the steel mat. AMERICAN ASOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO), CONT.

Tie-up every two (2) feet maximum center to center or at any other intersection, the greater of the two, for the rest of the bar intersections. Section – “reinforcement bar could be supported on any approved mechanism. Use sufficient supports to maintain the steel bar in position in order to keep the distance between bars and forms or the slab surface within tolerance - ¼ inch of specified on plans or specifications. The weight of workers and equipments must be supported against the forms not against the reinforcement bars. AMERICAN ASOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO), CONT.

CONSTRUCTION INSPECTION MANUAL FOR REINFORCED CONCRETE STRUCTURES BY THE AMERICAN CONCRETE INSTITUTE (ACI SP-2 (99)) STANDARD PRACTICES FOR REINFORCING STEEL DETAILING BY THE CONCRETE REINFORCING STEEL INSTITUTE (CRSI) MANUALS OF STANDARD PRACTICES IN THE CONSTRUCTION INDUSTRY

Steel rebar shall be firmly supported in place. Reinforcement supports shall be of adequate capacity and sufficient chairs be placed at the right locations to support the reinforcement steel and the construction loads at which it will be subject to prevent the sagging of the steel and reducing the distance between the steel and the forms or earth base. Allows the use of plastic chairs among other materials. Do not use rocks, wood blocks or other materials not approved for rebar support. MANUALS OF STANDARD PRACTICES IN THE CONSTRUCTION INDUSTRY

In general, support horizontal bars at every 5 or 6 feet. Tie-up intersected steel bar at a maximum of 2 or 3 feet or every other intersection. To prevent corrosion and to avoid any surface stains use plastic chairs or stainless steel chairs. MANUALS OF STANDARD PRACTICES IN THE CONSTRUCTION INDUSTRY

STANDARD TESTS PERFORMED ON JAB SNAP-ON & SUPPORT SYSTEM. TEST #1 (COMPRESSION)

Figure 3 – Arrangement Used during the Compression Test

Load vs. Displacement Curve for 1.5" Chair and # 3 Rebar

Load vs. Displacement Curve for 1.5" Chair and # 4 Rebar

STANDARD TESTS PERFORMED ON JAB SNAP-ON & SUPPORT SYSTEM. TEST #2 (SEGREGATION)

Core Sample - Chair 1.5” Core Sample - Chair 2.5” Core Samples

STANDARD TESTS PERFORMED ON JAB SNAP-ON & SUPPORT SYSTEM. TEST #3 (SLAB BENDING)

For the test, three (3) reinforced concrete slabs with measurements of ten (10) feet long, four (4) feet wide and four (4) inches thick were built. The objective of the test was to locate the chairs within the slabs in similar conditions to which they will be subjected in everyday use, and load test the slabs to determine if the use of the JAB plastic chairs results in localized cracks or fissures around the chairs or the development of any unexpected crack patterns along the width of the slab. The three (3) specimens built for testing differ from each other in the amount of steel or steel ratio used. For slab number 1, four (4) - #3 rebar were used. For the slab number 2, five (5) - #3 rebar were used. For slab number 3, seven (7) - #3 rebar were used. Based on these parameters, slab #1 should support under service load conditions, 20 pounds/ft 2 of live load in addition to its own weight, slab # pounds/ft 2 of live load and the slab # pound/ft 2 of live load. SLAB BENDING TEST

Figure 9 – General View of Slab forms, chairs and rebar before pouring concrete Figure 9 illustrates a general view of the specimens showing the location of the plastic chairs and the steel before pouring the concrete. The concrete used for these tests was pre-mixed. The maximum size of the coarse aggregate was ¾” nominal diameter. The average of six (6) cylinders, concrete compressive strength (f’c) was 2,310 psi at 28 days. This f’c was inferior to those normally specified in common construction for structural members (e.g. 3,000 psi).

Figure 10 – Block load application sequence used during the testing Figure 10 shows markings drawn to identify the sequence and the location of the blocks upon the slab. It was designed to simulate a uniform distributed load after all concrete blocks were in placed.

Figure 11 - General View of the Load applied to Slab 1 Figure 12 – Crack Pattern on the Central Zone of Slab 3 Figure 11 shows one of the reinforced concrete slabs during the loading procedure. Before starting the test, various blocks of 6” x 8” x 16” were weighed and an average weight was calculated to compute the number of blocks needed for each specimen. With an average weight of 30 pounds, 27 blocks were located over slab #1, 40 blocks were located over slab #2 and 54 blocks were located over slab #3 to simulate the corresponding live loads of approximately 20 pounds/ft^2, 30 pounds/ft^2 and 40 pounds/ft^2, respectively. Figure 12 illustrates the cracks pattern observed during the tests. On each of the slabs, cracks begin to appear after 20 blocks have been placed on the slab. The cracks appear on or near the center and extended all over the width of slab. No crack concentrations were found around the chairs or along the slab where the chairs were located. No crack patterns different from what normally can be found in reinforced concrete slab with steel wire or cement mortar (“limbers”) rebar supports subject to bending were observed. The difference found between each one of the specimens was not in the crack pattern but in the amount of cracks found along the width of the slab and the measurement (width) of the crack. The difference was expected since the load applied was doubled from slab #1 to slab #3.

STANDARD TESTS PERFORMED ON JAB SNAP-ON & SUPPORT SYSTEM. TEST #4 (FILTRATION)

Figure 13 – Arrangement Used during the Filtration Tests Figure 14 – Bottom View of Concrete Slab alter 10 days

With the objective of evaluating if placing the JAB plastic chairs instead of the metallic or mortar supports could contribute to develop a localized filtration condition in the slab, a test was specifically designed to evaluate the effect of the plastic chairs in the filtration pattern. The test consisted in maintaining 1.5 inches of water on the surface of slab for ten (10) days. During this period of time, the filtration pattern was visually observed, evaluating specifically if the water filtration was somehow increased or different around the zones where the plastic chairs were located. Figure 13 shows the arrangement used for the tests. Figure 14 shows that after 10 days of maintaining the top portion of the slab submerge in water, no filtration marks were noticed around the location of the chairs nor along any of the cracks under the slab. The daily observation made under the slab during the preceding 9 days concurs with the final observation at day 10 of the test. Slab Filtration Test

JAB SNAP-ON & SUPPORT SYSTEM INSTALLATION PROCEDURES REBAR QUANTITY AND INSTALLATION PATTERNS SHOULD BE AS INDICATED BY THE JAB PLASTIC CHAIR QUANTITY CALCULATOR, BUT FOR THE MOST PART THE FOLLOWING RESTRICTIONS APPLY: –TO AVOID SAGGING OF THE REBAR, LOCATE CHAIRS AT A DISTANCE NOT GREATER THAN: FOR #3 OR 3/8” BARS - 2 FEET CENTER TO CENTER FOR #4 OR ½” BARS - 3 FEET CENTER TO CENTER FOR #5 OR 5/8” BARS - 4 FEET CENTER TO CENTER –FOR BIGGER BAR NUMBERS, CHAIRS SHALL IN NO EVENT BE LOCATED FARTHER APART THAN 5 OR 6 FEET CENTER TO CENTER –TO ELLIMINATE THE USE OF TIE-UP WIRES, LOCATE PLASTIC CHAIRS AT A DISTANCE OF 2 FEET OR LESS CENTER TO CENTER IN BOTH DIRECTIONS

JAB SNAP-ON & SUPPORT SYSTEM INSTALLATION PROCEDURES, CONT. ALWAYS VERIFY THAT REBARS ARE LOCATED AT THE RIGHT POCKET FOR PROPER GRIP. THE GRIP PROVIDED BY THE SNAP-ON FEATURE OF THE CHAIR IS STRONG ENOUGH TO KEEP REBAR IN PLACE, THEREFORE EXCEEDING CODE REQUIREMENTS. ALWAYS VERIFY THE REQUIREMENTS OF THE CRSI STANDARD PRACTICE OR STEEL DETAILING MANUALS FOR PROPER LOCATION OF THE CHAIRS –THERE ARE SPECIFIC AND DIFFERENT REQUIREMENTS FOR EACH TYPE OF STRUCTURAL SLABS AND SLAB ON GRADE

PRODUCTS AVAILABLE FOR DELIVERY NOW! HEAVY DUTY 1.5” INCHES HIGH FOR #2, #3 & #4 REBARS & 6x6-10x10 WIRE MESH HEAVY DUTY 2.5” INCHES HIGH FOR #3, #4 & #5 REBARS

PRODUCTS AVAILABLE FOR DELIVERY NOW! HEAVY DUTY.75” INCHES HIGH FOR #3, #4 & #5 REBARS DOUBLE MAT SYSTEM FROM 2” TO 8” FOR #3, #4, #5, #6, #7 & #8 BAR SIZES

PRODUCTS AVAILABLE FOR DELIVERY NOW! STANDARD CROWN 1 (1.5”,2.0”,2.5” and 3.0”) INCHES HIGH FOR #2, #3, #4 REBARS & 6x6-10x10 WIRE MESH. STANDARD CROWN 2 (2.0”to 8” INCHES HIGH FOR #3, #4 and #5 REBARS

PRODUCTS AVAILABLE UPON REQUEST FROM JAB PLASTIC PRODUCTS CORP. SINGLE MAT CHAIR FROM.75” TO 8” FOR #3, #4, #5 BAR SIZES DOUBLE MAT CHAIRS FROM 2” TO 14” FOR #3, #4, #5, #6, #7 & #8 BAR SIZES

MEETS CODES/STANDARDS REQUIREMENTS MEETS STANDARD PRACTICE REQUIREMENTS SURPASSES EXPECTED CONSTRUCTION LOADS AVOID CORROSION STAINS PROVIDES REQUIRED TIE-UP REDUCING LABOR INTENSIVE COST COST SAVINGS COMPETITIVE COST JAB Plastic Snap On and Support System. “The new way to improve the old way”

JORGE ALFONSO PRESIDENT CELLULAR PHONE: (210) FAX NUMBER: 1(888) FOR INFORMATION ABOUT OUR PRODUCTS PLEASE CONTACT:

Jab Plastics Chairs Products 1.5” Plastic Concrete Chair 2.5” Plastic Concrete Chair 1/2” Plastic Anchor Bolt Cap 5/8” Plastic Anchor Bolt Cap The new way to improve the old way JAB PLASTIC PRODUCTS CORP. P.O.Box Austin, TX