EURISOL Transition period MYRRHA and

Slides:



Advertisements
Similar presentations
Paris, November 2004 M. Lewitowicz NuPECC meeting Physics case of SPIRAL 2 and EURISOL SPIRAL2 and EURISOL facilities Available Beams Physics Case Conclusions.
Advertisements

EURISOL Peter Butler University of Liverpool
1 NuPECC/ERA-NET, Paris; 27 May 2005 NuPECC LRP & Nuclear Physics ERA-NET Muhsin N. Harakeh NuPECC & KVI.
NuPECC Long Range Plan 2010 Perspectives for Nuclear Physics Research in Europe Guenther RosnerNuPECC Meeting, Bergen, 11/6/101.
EURISOL DS : Status and Future Yorick Blumenfeld CERN-ISOLDE* We acknowledge the financial support of the European Community under the FP6 Research Infrastructure.
ESF Workshop The future of stable beams in Nuclear Astrophysics NCSR Demokritos, Athens, Greece December 14-15, 2007 Organizing Committee S. Harissopulos.
EURISOL DS : Status and Future Yorick Blumenfeld IPN Orsay We acknowledge the financial support of the European Community under the FP6 Research Infrastructure.
NuPECC Long Range Plan 2010 Perspectives for Nuclear Physics Research in Europe Guenther Rosner NuPECC LRP2010 Town Meeting Madrid, 2/6/10 1.
EURISOL User Group Charter –Objectives of the User Group –Organization Next actions in the light of the future of EURISOL.
EURISOL (and the European ISOL roadmap) Yorick Blumenfeld* (CERN) *on leave from IPN Orsay.
1Jean-Luc Biarrotte, SPL/ESS meeting, Lünd, June 30, Accelerator design for MYRRHA J-L. Biarrotte, CNRS-IN2P3 / IPN Orsay.
Alex C. MUELLER Physics with a multi-MW proton source, CERN, Geneva, May Additional Installations for a Nuclear Physics Facility Alex C. MUELLER.
Status of EURISOL Yorick BLUMENFELD We acknowledge the financial support of the European Community under the FP6 “Research Infrastructure Action - Structuring.
DAF Distributed Accelerator Facility (DAF) Transnational Access Nodes: 1.Tandem Accelerator Laboratory, Rudjer Boskovic Institute (RBI), Zagreb, Croatia.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Alex C. Mueller, MANETEURONS PCC-Meeting, Mainz (Germany), April 2006 EURONS 1st annual report: Generalities (I)  With an EC contribution of 14,056,000.
A facility for Nuclear, Atomic, Material and Radiobiology Sciences. Delivering stable (from C to U) and radioactive ions (from He to Xe) in the energy.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
Noyaux CERN- ISOLDE Yorick Blumenfeld.
The Youngsters in Theoretical Nuclear Physics An Ace up France’s sleeve in the RIB competition.
EURISOL – Distributed Facility (DF) Y. Blumenfeld, M. Lewitowicz, P. Van Duppen, A. Maj Background : EURISOL RTD : EURISOL Design Study.
Heavy Ion Accelerator for RIB KoRIA in International Science & Business Belt S. W. Hong Sungkyunkwan University S. W. Hong Sungkyunkwan University Nov.
Activities of Superconducting RF Accelerators at Nanjing University Sun An Proton Linear Accelerator Institute Institute of Energy Sciences, Nanjing University.
CERN NuPAC meeting Dec 2005 The future of ISOLDE: accelerated radioactive beams Peter Butler 1.HIE-ISOLDE 2.EURISOL.
10-Year Vision: expanded RIB program with: three simultaneous beams increased number of hours delivered per year new beam species increased.
Mats Lindroos INTC Agenda 09:00 Introduction by the Chairman, J. Äystö 09:05 Report by the ISOLDE Technical Coordinator, M. Lindroos 09:25 Report by the.
Building the Europe of Knowledge Proposals for the 7 th Research Framework Programme
A Plan to Construct a Rare Isotope Accelerator Facility KoRIA S. W. Hong Sungkyunkwan University (SKKU) On behalf of Conceptual Design Project Team S.
SPL, a driver for EURISOL? Yorick Blumenfeld* Isolde-CERN * On leave from IPN Orsay We acknowledge the financial support of the European Community under.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
1 Status of the EU-FP7 funded Integrating Activity “European Nuclear Science and Applications Research” (ENSAR) Marek Lewitowicz (GANIL) on behalf of Muhsin.
Status of the EURISOL Design Study Yorick Blumenfeld IPN Orsay.
NuPECC Mapping Studies FINUPHY/EURONS I3 EURONSFINUPHY/FP5 EURONS/FINUPHY Meeting, Funchal (Portugal), 7-9 February 2005 NuPECC Report 2002 “Impact, Applications,
News from ESS Cristina Oyón, Mats Lindroos, Steve Peggs November 2009.
Copyright © 2014 SCKCEN Production of medical radioisotopes at MYRRHA Lucia Popescu SCKCEN
European Isotope Separation On-Line Radioactive Nuclear Beam Facility A preliminary design study of the next- generation European ISOL RNB facility GANIL,
Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Coseners meeting Sept Future of European ISOL Peter Butler.
UK Research in Nuclear Physics P J Nolan University of Liverpool.
Copyright © 2015 SCKCEN ADS accelerator developments presently on-going for MYRRHA and possibly for the Chinese-ADS Dirk Vandeplassche 1 Eucard-2 — APAE.
The RIA Users Organization (RIAUO) Witold Nazarewicz (Tennessee) EURISOL Week, CERN, November 2006 History The Mission Organization Activities Perspectives.
Trends in Heavy Ion Physics Research, Dubna, May Present and future physics possibilities at ISOLDE Karsten Riisager PH Department, CERN
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
SECONDARY-BEAM PRODUCTION: PROTONS VERSUS HEAVY IONS A. Kelić, S. Lukić, M. V. Ricciardi, K.-H. Schmidt GSI, Darmstadt, Germany  Present knowledge on.
ENSAR : European Nuclear Structure and Application Research Maria J. G. Borge.
The International Workshop on Thin Films. Padova 9-12 Oct of slides Present Status of the World- wide Fusion Programme and possible applications.
DF ALTO IN2P3 DF ISOLDE CERN SPES INFN SPIRAL2 GANIL MYRRHA SCK-CEN … COPIN EURISOL – Distributed Facility (DF) Initiative H. Savajols – Convenor.
Summary: Physics Opportunities for ISOLDE and n_TOF Peter Butler.
A. FaccoEURISOL DS Orsay, 3 Feb 2005 Task 7 Proton Accelerator “The objective of the Proton Accelerator Task is the design a 5 mA CW, 1 GeV proton linac.
The Belgian Research Initiative on eXotic nuclei – BriX network BriX Days Oostende, March 25-26, 2013 Funded by the Interuniversity Attraction Poles Programme.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
European Small-Scale Accelerator Facilities S. Harissopulos: NuPECC Strategy Meeting, Darmstadt, January 16, 2016.
EURISOL: European Collaboration towards the ultimate ISOL facility Yorick Blumenfeld IPN – Orsay We acknowledge the financial support of the European Community.
PH Department News Discussion with management
Jefferson Lab Overview
The Future of EURISOL Results from the Design Study
The RIA Users Organization (RIAUO)
for the EURISOL Steering Committee
Sébastien Bousson (CNRS-IN2P3-IPN Orsay)
Targets & conversion to secondary radiation summary
Progress of BRIF and CARIF
Nuclear Physics in France
BEAM INTENSITIES WITH EURISOL
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
EffiCAS Efficient Facility for Ions at CAS
Report on HIE-ISOLDE Status
Mats Lindroos for The ISOLDE team
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

EURISOL Transition period 2009-2013 MYRRHA and ISOL@MYRRHA Piet Van Duppen K.U.Leuven and ISOLDE-CERN on behalf of the EURISOL Project Office EURISOL Transition period 2009-2013 MYRRHA and ISOL@MYRRHA

EURISOL What is EURISOL? Multi-user capabilities Up to 150 AMeV for 132Sn 3 x 100 kW targets (REX-ISOLDE, SPIRAL ~ few kW HIE-ISOLDE ~ 10kW, TRIUMF ~ 50 kW) 1 x 4 MW converter (fission) target (SPIRAL-2 ~ 200kW, SPES ~ 100 kW) 3 x post-accelerators: 150 A.MeV 132Sn for secondary fragmentation 1-5 A.MeV Coulomb barrier nuclear physics ~ 1 MeV nuclear astrophysics ~ keV ground states, solid-state physics, etc. Cost: 1.3 B€ 3 235U Design Study finished: ~400 person-yrs, ~ 33M€ - (documents/report available on www.eurisol.org) LINAC: H, D, He and A/q=2 ions up to 1 A GeV

The “Transition” Period (2010-2013) update/shape the physics case/instrumentation perform further R&D for RIB production/acceleration contact with funding and political bodies EURISOL on the ESFRI list and EURISOL Preparatory Phase The EURISOL project office: Overall coordination of EURISOL related actions Yorick Blumenfeld (chair), Alberto Facco, Marek Lewitowicz, PVD The EURISOL collaboration: MoU between all laboratories interested in EURISOL (in preparation)

The “Transition” Period (2010-2013) The EURISOL User Group and the EURISOL Network in ENSAR: EURISOL User Group will federate scientific community and update physics case; elected executive committee: A. Bonaccorso, chair EURISOL Network focuses on R&D at current facilities and fund workshops and town meetings; 105 k€; leader Y. Blumenfeld Task1: R&D coordination (Y. Kadi) Task 2: Physics & Instrumentation (A. Bonaccorso) Workshops/topical meetings – town meetings: Catania 9-11 December 2009 – Nuclei in the r-process region (~40 part.) (http://www.df.unipi.it/~angela/top_all_19dic.pdf) - Valencia 21-23 February 2011 – N=Z region (~70 part.) - Lisbon Fall 2012: town meeting and topical meeting on light nuclei - CERN, Geneva: June 27-28, 2011: EURISOL-NET on R&D coor. - 2013: topical meeting - 2014: Final town meeting

The “Transition” Period (2010-2013) The EURISOL work package in TIARA: - Define/Prepare R&D platforms for EURISOL (270 k€, S. Bousson – Orsay) Requests to NuPNET: R&D through National Funding Agencies (see also S. Gales: NuPECC meeting Paris): - Three proposals submitted: Accelerators – Charge Breeding – Target-Ion Sources systems (requested 1.25 M€) Workpackage 9: Test Infrastructure and Accelerator Research Area

Timescale for EURISOL 2010-2013 : Transition period; contacts with funding agencies and political bodies 2013 : Application to be included in ESFRI list (support from NuPECC) 2013 : Call for preparatory phase 2014-2017 : EURISOL Preparatory Phase 2017-2019 : Preparation of TDR 2020-2025 : Construction 2025 : First Beam

Timeline for European ISOL RIB facilities 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Existing ISOL facilities REX-ISOLDE, SPIRAL, EXCYT, ALTO, JYFL, … Construction+ commissioning HIE-ISOLDE SPES SPIRAL2 2nd generation ISOL facilities RIBs from 2nd generation ISOL facilities ESFRI List EURISOL Collaboration MoU EURISOL Preparatory Phase Construction + Commissioning TDR RIB Adapted from M. Lewitowicz and P. Butler

Courtesey Lucia Popescu (SCK•CEN, Belgium) MYRRHA at SCK•CEN Copyright © 2011 SCK•CEN Courtesey Lucia Popescu (SCK•CEN, Belgium)

MYRRHA - Concept Total investment (estimation 2009): 960 M€ Sustainable fission energy: Accelerator Driven System (ADS) Fast neutron spectrum: neutron irradiated silicon Health care: production of radioisotopes for nuclear medicine Fundamental research: ISOL@MYRRHA

MYRRHA Project Schedule 2010-2014 Front End Engineering Design 2015 Tendering & Procurement 2016-2018 Construction of components & Civil engineering 2019 On site assembly 2020-2022 Commissioning 2023 Progressive start-up 2024- Full exploitation The project MYRRHA supported by the Belgian government (March 2010) on the ESFRI roadmap (Nov. 2010) on the “European Sustainable Nuclear Industrial Initiative – ESNII” roadmap (Nov. 2010) on the NuPECC roadmap (Dec. 2010)

ISOL@MYRRHA Pre-Conceptual Design protons: 2-4 mA, CW, 600 MeV 2 gap Spoke 352 MHz 5 cell Elliptical 704 MHz Beam splitter 17 MeV 100 MeV 200 MeV 600 MeV ~ 100-200 mA, ~DC ISOL@MYRRHA Ruggedized target: e.g. Ta, UC/C Sustainable 1+ ion source: RFQ cooler and buncher Pure and intense RIBs of ~50-60 keV Low-resolution mass separator High-resolution mass separator

Facility Characteristics based on proven technology (largely based on experience at ISOLDE and TRIUMF) can deliver: pure RIB: selective ionization, chemistry, M/DM > 10.000 intense RIB (x100 compared to the present ISOLDE ‘standard’ RIB) RIB of good ion optical quality optimal experimental conditions/lay-out/support (green-field facility!) extended beam times with stable operation complementary to ISOL and In-Flight facilities => unique possibilities for experiments that: need very high statistics involve many time consuming systematic measurements hunt for very rare events have an inherent limited detection efficiency

ISOL@MYRRHA Project at SCK•CEN ISOL@MYRRHA is an integral part of the MYRRHA project Delivery of the proton beam by MYRRHA Support by ISOL@MYRRHA in house group at SCK•CEN Building an international users group Workshops on R&D for RIB production and the physics case (update) Search for national and international support: ~40 M€ - ISOL@MYRRHA consortium More information: http://isolmyrrha.sckcen.be 2020 Assembly & Installation 2017-2019 Manufacturing of components & construction 2016 Awarding contracts 2021-2022 Commissioning 2012-2015 Front End Engineering Design ISOL@MYRRHA 2023 - Exploitation 2011 Pre- Conceptual