EURISOL DS : Status and Future Yorick Blumenfeld CERN-ISOLDE* We acknowledge the financial support of the European Community under the FP6 Research Infrastructure.

Similar presentations


Presentation on theme: "EURISOL DS : Status and Future Yorick Blumenfeld CERN-ISOLDE* We acknowledge the financial support of the European Community under the FP6 Research Infrastructure."— Presentation transcript:

1 EURISOL DS : Status and Future Yorick Blumenfeld CERN-ISOLDE* We acknowledge the financial support of the European Community under the FP6 Research Infrastructure Action - Structuring the European Research Area EURISOL DS Project Contract no. 515768 RIDS. The EC is not liable for any use that can be made of the information contained herein. * On leave from IPN Orsay

2 EURISOL DS LatestTechnical Achievements Managerial achievements Proposals for the Future

3 = 0.3 = 0.78 Ion sources RFQ 176 MHz HWRs 176MHz Elliptical ISCL 704 MHz 1 GeV/q H-, H+, 3 He++ 1.5 MeV/u 100 keV 60 MeV/q140 MeV/q >200 MeV/q D+, A/q=2 Charge breeder Low- resolution mass-selector UC x target 1+ ion source n-generator = 0.065 = 0.14 = 0.27 = 0.385 QWR ISCL 88 MHz 3 QWRs ISCL 88 MHz 8 HWRs ISCL 176 MHz Spoke ISCL 264 MHz 20-150 MeV/u (for 132 Sn) To low-energy areas Secondary fragmentation target A possible schematic layout for a EURISOL facility 4-MW target station = 0.47 3-spoke ISCL 325 MHz High-resolution mass-selector Bunching RFQ To medium-energy experimental areas = 0.65 Elliptical ISCL 704 MHz = 0.09, = 0.15 H- H+, D+, 3 He++ 9.3- 62.5 MeV/u2.1-19.9 MeV/u To high-energy experimental areas RFQs Charge selector One of several 100-kW direct target stations

4 Spoke cavities development @ IPN Orsay 2 prototypes at =0.15 and =0.35 fabricated and successfully tested at 4.2 K. This technology is the basis for the 3-Spoke required by the Driver linac Spoke cavity tuner EURISOL Task 8: Sébastien Bousson – IPN Orsay

5 Liquid Hg converters Coaxial Guided Stream Windowless Transverse Mercury Film

6 Off-line test in Hg loop at IPUL Mats Lindroos

7 Liquid mercury converter Mats Lindroos The CGS design The WTMF design

8 New Target Concept

9 17 th September 2007 100kW Targets

10 T. Stora CaO344 online Apr 2007 Experimental data O: Open F: Closed 35Ar E. Bouquerel, L. Penescu, E. Barbero, D. Carminati, R. Catherall, B. Crepieux, J. Lettry, S. Marzari, E. Noah, T. Stora, R. Wilfinger Closed valve leak rate : 0.3% Ratio 34 Ar : 95% (OO)/(OF+FO) 35 Ar : 83% Symmetry : 34 Ar : 94% (FO)/(OF) 35 Ar : 92% Ion source efficiency : (FO or OF) Ar : 5.1% (OO) Ar : 4.9%

11 17 th September 2007 ISOL targets and ion sources 4 4 Targets 4 4 Ion-sources 1 1 Front-end Target materials (30): Refractory oxides and carbides (Al 2 O 3, SiC) Solid metals (Ta, Nb, Mo) Molten metals (Pb, La, Sn). ISOLDE UC x pressed pellets HfO 2 felts m m nm/sub- m SiC m High density UC x L. Tecchio for Task 4 Ion sources (>5): Surface FEBIAD, ECR RILIS Ta foils

12 17 th September 2007 100kW oxide target design Prototype test preparation at TRIUMF Proton E=0.5 GeV, Pmax= 50 kW wobbling envisaged

13 Liquid metal loop Mats Lindroos Diffusion chamber Irradiation cell Heat exchanger EM pump To be tested at IPUL

14 MUST2 + TIARA Testing Instrumentation Concepts for EURISOL Task 10 : Physics and Instrumentation Robert Page

15 EURISOL has a stable Design, validated by worldwide experts During the final year, the work is concentrated on prototype building and testing

16 Management Achievements EURISOL User Group: Angela Bonaccorso, chair. First workshop Jan. 2008; Charter established; election of executive committee: 27candidates for 8 seats, 354 voters. Site Investigation Panel : A. Shotter, G. Cuttone, D. Geesaman, A. Mueller, S. Myers. 3 meetings. Will report to steering committee in November Third annual report accepted for scientific part. Comments on financial part received last week. Review panels organized for MMW converter and post accelerator. Production of brochure for General Public Next Town Meeting March 30-April 1 2009 in Pisa. Defining strategy for the future of EURISOL

17 Proposal for the Future of EURISOL EURISOL has made use of EC instruments: 5th framework RTD and 6th framework DS. Major advances have been achieved and a large community with varied technical expertise has developed and must continue to be nurtured Full engineering report necessary before Pre- construction phase: No (evident) EC instrument for funding. We (the EURISOL DS MB) propose to form a EURISOL collaboration consisting of laboratories interested in participating in the continuing effort.

18 Role of the EURISOL Collaboration Follow the scientific and policy recommendations of NuPECC Promote and Coordinate the R&D to further EURISOL, including work at intermediate generation facilities Solicit support of the funding agencies, in particular through the NuPNET Eranet, and explore other funding opportunities (EC, intercontinental…) Interact with the EC >> entry on the ESFRI list. Goal : Produce an engineering report for the facility Support the EURISOL User Group; organize Town Meetings Has been endorsed by NuPECC, thank you!

19 Multi-Community Design Study on High Power Targets : Neutrinos, Neutrons and Ions Establish limits for Liquid metal and solid target technology Study common infrastructure and collect data for licensing work Computer studies of cavitation and bubble development, determination of shock fronts and studies of the beam/pressure pulse Off-line studies at liquid metal target laboratories such as IPUL in Latvia, SNS in Oak Ridge and J-Parc in Tokai Beam tests to study cavitation and mitigation at high instantaneous beam intensity facilities such as ISOLDE and AGS In-beam tests at a high power facility of new concepts Under Discussion

20

21 Organization of the EURISOL Collaboration Collaboration board representing participants >> Elects collaboration chairperson and appoints project leader. Project office supported by a modest collaboration fee (~5000 E/year/lab). Engineering work coordinated by project leader and funded by funding agencies (+ other), preferably coordinated by NuPNET. Work divided into work packages

22 EURISOL Work Packages (3-5 years) Management (Project Office) RIB production: Specific prototyping and tests –Neutron converter in beam –Fission target in n flux –New target materials; liquid metal direct target –Novel beam splitter system… Prototyping at intermediate facilities; linked to EUR- ISOL Net in ENSAR Documentation and licensing Infrastructure Updating the science case : coordinated by EURISOL User group

23 Requests Very approximate price tag: 2M/year for 4 years. We would like the support of NuPECC to implement this plan (and welcome your suggestions). Collaboration launched by the EURISOL Steering Committee in Nov. 2008 Startup should be in fall 2009