Presentation is loading. Please wait.

Presentation is loading. Please wait.

Mats Lindroos for The ISOLDE team

Similar presentations


Presentation on theme: "Mats Lindroos for The ISOLDE team"— Presentation transcript:

1 Mats Lindroos for The ISOLDE team
ISC and INTC 26-27/11 Mats Lindroos for The ISOLDE team Mats Lindroos

2 INTC open meeting Successful start of the ISOLDE-REX post accelerator
Unique method for charge breeding Low contamination Applicable to all isotopes produced at ISOLDE Possible that ISOLDE REX becomes a CERN facility Scientific evaluation by INTC Resources? An estimated 340 shifts of physics at ISOLDE in 2001 Successful operation of HRS in low resolution mode Solid state physics output limited No implantation facilities at HRS Possible solution to be presented at next INTC Mats Lindroos

3 INTC open meeting Report on GPS front end status
To be re-commissioned after Easter 2002 Report on planned shutdown work No stable beams January to March (inclusive) 2002 NO Solid state laboratory as part of consolidation project Mats Lindroos

4 ISOLDE collaboration Candidates for new physics group leader discussed
Audit of budget 2001 Budget for 2002 presented Collaboration ready to contribute 60 kCHF to solid state lab 60 kchf: ISC + 60 kchf: CERN + 60 kchf: solid state physics community? Mats Lindroos

5 CERN budget Mats Lindroos

6 ISC Budget 2001 2002 2003 2004 140(140) 25(3) 175 50(2) supressed
Emittance meter 140(140) HRS 25(3) 175 Noble gas trap 50(2) supressed New front end 150(150) RFQ cooler 50(0) 150 Tape station 100 RILIS 107(61) 113 Mats Lindroos


Download ppt "Mats Lindroos for The ISOLDE team"

Similar presentations


Ads by Google