Item 5.h - Authorization to Advertise the Repairs to the Glorietta Bay Pump Station Project for Bid.

Slides:



Advertisements
Similar presentations
MBTA Groundwater Action Plan Dr. Steve J. Poulos, P.E.
Advertisements

City of Olympia | Capital of Washington State Percival Landing Update Land Use Committee Meeting March 27, 2014.
Permanent Protection System Opinion of Probable Cost May 2010 Courtesy USACE Photograph Courtesy USACE.
BOLTON RESERVOIR 2012 BOLTON RESERVOIR CLEANING AND INSPECTION.
T ROOPER W. S MITH, P.E. F REESE AND N ICHOLS, I NC J OLLYVILLE R D., B LDG 4, S UITE 100 A USTIN, TX MINIMIZE YOUR FOOTPRINT AND YOUR MAINTENANCE.
The Town of Discovery Bay Community Services District Wastewater Treatment Plant Master Plan NOVEMBER 9, 2011.
CMOM: Where are we since 2005? Ann McCready-Gliha Cuyahoga County Sanitary Engineering SPUG February 16, 2011.
City of Los Angeles Venice Dual Force Main Project
0 Scoring Community Development Block (CDBG)Grants Water/Sewer Apps April 8, 2013 SEIRPC CDBG Scoring Committee.
Advertisement GFD Duties –Plan, coordinate, and direct all activities of the Department –Responsibility for the operation of all phases of the Department.
Flow Equalization Tanks Presented by Keith Surface.
ADM – Mankato MN - Concrete Repair Remove Unsound Concrete.
Confined spaces Confined spaces inventory. The Inventory Description of the confined space Location Openings (location, size, shape) Contents of the space.
CE 3372 Water Systems Design
Ranney Collector Construction
The City of North Bend Sanitary Sewer System
11 City of Hallandale Beach Water, Wastewater and Stormwater Facilities Plan Public Meeting.
Phase Difference = Phase Difference = 0.05.
SEA LEVEL RISE IN MIAMI BEACH MIAMIBEACH. Seawall Construction.
SEA LEVEL RISE IN MIAMI BEACH MIAMIBEACH. Seawall Construction.
THE SCOPE OF THIS PROJECT IS LIMITED TO THE FRONT AND REAR PORCHES AND IS DEFINED AS FOLLOWS: FRONT PORCH REMOVE EXISTING PORCH RAILINGS, STAIR RAILINGS,
Tim Sikma City of Novi Case Study: CMOM Program in the City of Novi, MI Are You Ready for the Next Big Storm? Michelle LaRose, P.E. Orchard, Hiltz & McCliment,
ATTACHMENT C Photographic Report. Photo 1 - Influent Pipe to Wastewater Treatment Plant Photo 3 - Influent Flume for Flow Metering Photo 2 - Chart Recorder.
Norco Tank T/A Meeting  Review current contracting strategy & options for improved strategy  Review details of 2008 & projections for 2009 forward.
1 Underground Asset Management Jonathan Mongie. 2 Asset Management ► Improved Asset Condition l Increased System Efficiency ► Prolonged Asset Life l Reduced.
1 II. Sewer Networks and Facilities Topic. II. 12. Detention (Retention) Basins: Kinds and Structures. Sewerage Pumping Stations Detention Basins: Kinds.
Sanitary Engineering Lecture 14
Urban Storm Drain Design: Pump Station Design. Purposes To lift stormwater to higher elevation when discharge of local collection system lies below regional.
METRO WASTEWATER RECLAMATION DISTRICT CAPITAL IMPROVEMENTS PROGRAM
Network Appurtenances Major operations within a water transport and distribution systems are: 1. Transmission. 2. Storage. 3. Pumping.
20/5/20021 CEN/TC 12 and ISO TC67 SC4 Plenary meeting CEN/TC 12 and ISO TC67 SC4 Plenary meeting.
1 Public Hearing User Rate Adjustments April 8, 2008.
CE 3372 WATER SYSTEMS DESIGN LECTURE 23: SANITARY SEWERS (USING SWMM)
Public Information Meeting Wastewater Treatment January 26, 2016.
Components of Water Networks Eng. Mona Al-Gharbawi Eng. Ayman Al-Afifi
March 3, 2016 Discovery Sewer/RWQCB LSM Vallecitos Water District Regional Water Quality Control Board (RWQCB) Lake San Marcos February 10, 2010.
City of McCall Sanitary Sewer I&I Study Community Stewardship for Economic Benefits Nathan Stewart, PE, City Engineer Matt Neukom, PE, Project Manager.
基 督 再 來 (一). 經文: 1 你們心裡不要憂愁;你們信神,也當信我。 2 在我父的家裡有許多住處;若是沒有,我就早 已告訴你們了。我去原是為你們預備地去 。 3 我 若去為你們預備了地方,就必再來接你們到我那 裡去,我在 那裡,叫你們也在那裡, ] ( 約 14 : 1-3)
Phase II and Compost Facility Upgrade Projects February 16, 2012.
Town of Enfield : Upgrading the Water Pollution Control Facility & Collection System Jay Sheehan, PE Michael Burns, PE.
RESEARCH AND DEMONSTRATION CENTER ON-LOT SYSTEMS AND SMALL FLOW TECHNOLOGIES DELAWARE VALLEY COLLEGE DOYLESTOWN, PA Project Funding Provided by: Pennsylvania.
SOUTH LAGUNA TUNNEL STABILIZATION & SEWER PIPELINE REPLACEMENT PROJECT Providing Quality Water & Wastewater Services To the Coastal Communities.
CE 3372 Water Systems Design
Sun City Lift Station Odor Control Improvements
Winchester Lift Station Odor Control Project
Optimising Sludge Dewatering – Benefits from Shared Water Services
Waste Water Secrets: What Happens After You Flush The Toilet?
Private Septic Systems
L-9 Sewage Pumping Environmental Engineering-II.
Challenges To Sewage Lagoons
Town of Dunn Sanitary District No. 3
Private Septic Systems
The summer of 2018 and all the work that has taken place
Слайд-дәріс Қарағанды мемлекеттік техникалық университеті
.. -"""--..J '. / /I/I =---=-- -, _ --, _ = :;:.
II //II // \ Others Q.
1 C PIPE"' · I - I. 0I0I .. ) sasa /.
I1I1 a 1·1,.,.,,I.,,I · I 1··n I J,-·
Sheryl Stephens Victor Valenzuela

دکتر سید مجید اسما عیل زاده
Hidden Capacity How Proper Maintenance and Cleaning of Sewer Systems Can Have Huge Benefits! Presentation by the Jersey Water Works CSO Committee For the.
Execute Purchase Order South Shore Water Reclamation Facility Building 359 Odor Control System Repairs Commission Agenda Item #8.
Conveyance Operation and Maintenance (O&M) Manual
Change Order Request Contract S02013C01 SSWRF RAS System Improvements Restore ED’s Original Delegated Authority Approve Changes in TPC Commission.
Authorizing ED to Reject Bid for Contract P01005C10

Authorize ED to Execute Purchase Order
Commission Agenda Item #2

Presentation transcript:

Item 5.h - Authorization to Advertise the Repairs to the Glorietta Bay Pump Station Project for Bid

Glorietta Bay Pump Station Inflow from NAB (pumped) Inflow from the Cays (pumped) Gravity Flow from the Shores

Glorietta Bay Pump Station Repair/Maintenance Needed – Pump rails – Pump(s) Station has 4 pumps; one is a redundant pump One is currently non-operational and can’t be removed because the lifting handle has deteriorated – Interior piping – Sludge removal – Lining/Structural repairs

Recommended Action Authorize staff to advertise the pump station repairs including: (wet-well by-pass not required) – Repair of rail system – Repair of pump(s) – Removal of built-up sludge – Evaluation of liner and structure – Evaluation of the discharge piping – Work to be completed by May 31, 2013 Phase II of the project would be repairs to the concrete and wet well liner (wet-well by-pass required) – Work would not commence until after summer 2013

Photos of the Wet Well

Photos of the Wet Well (cont.)