1 Ranney Collector Construction

2 Ranney Collector Overview
Pump Station Central Reinforced Concrete Caisson Horizontal Well Screens

3 Collector Well Construction
Primary Phases of Collector Well Construction Caisson Construction Lateral Projection Screen Installation and Development Performance Testing

4 Caisson Construction STEP 1 STEP 2 STEP 3 L1 L1 L2 Grade Grade Grade

5 Initial Caisson Lift with Cutting Shoe,
Toledo Bend Reservoir

6 Inner and Outer Forms

7 Caisson Lift with Ports,
Lake Havasu City

8 Clam Shell Excavation, Louisville

9 Clam Shell Excavation, Lake Havasu City

10 Floor Reinforcing, Iowa City

11 Completed Caisson

12 Collector Well Construction
Primary Phases of Collector Well Construction Caisson Construction Lateral Projection Screen Installation and Development Performance Testing

13 Lateral Projection Grade SWL Caisson Lateral A Lateral B Ports

14 Hydraulic Jacking Machine

15 Lateral Projection, Iowa City

16 TYPICAL BORE PILOT Minimize Friction Remove Material
Provide Horizontal Bore

17 Projection Pipe and Sand Line

18 Laterals Installation
Bore Pilot & Projection Pipe Centered On Port Assembly

19 Projection Pipe Advancement
Lateral Installation Projection Pipe Advancement

20 Projection Pipe Advancement
Lateral Installation Projection Pipe Advancement

21 Collector Well Construction
Primary Phases of Collector Well Construction Caisson Construction Lateral Projection Screen Installation and Development Performance Testing

22 Screen Installation Grade SWL Caisson Lateral A Lateral B
(Wire-Wrap Screen) (Wire-Wrap Screen)

23 Wire-Wrapped Screen

24 Wire-Wrapped Screen

25 Development By Overpumping
Q Grade SWL Caisson Pump Laterals

26 Development By Surging

27 Sand Content Measurement

28 Collector Well Construction
Primary Phases of Collector Well Construction Caisson Construction Lateral Projection Screen Installation and Development Performance Testing

29 Performance Testing, Sonoma County

30 Top Slab Installation

31 Conceptual Design and Yield
Ranney Collector Conceptual Design and Yield

32 Equations to Quantify Yield

33 Input Parameters / Design Assumptions
T = 482,600 gpd/ft S = 0.313 K = 5602 gpd/ft sq B = 86 feet A = 700 feet Zi = 75 feet Laterals – 10 to 12 Lateral Radius – 0.5 ft Lateral Length – 200 ft Caisson Radius – 8 ft Pumping Level – 15 ft above laterals

34 Conceptual Design

35 Yield With Recharge

36 Yield Without Recharge

37 Characteristics of Ranney System
$12.6 to $16.0 million for Total System 100% of Construction and Maintenance On Shore Yield Remains High When River Migrates Pilot Testing to Confirm Yield