LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013.

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

Going towards LHC Run2 CRYOGENICS 5 th Evian Workshop 2-4 June 2014 SESSION 4 - Systems 2 - Status and commissioning plans (HW perspective) Krzysztof Brodzinski.
February 2009 Summary of Chamonix 09 Steve Myers.
Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Upgrades and Activities of 13kA EE systems during LS1 Bozhidar Panev TE-MPE-EE
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
LS1 Injectors K. Foraz on behalf of N. Gilbert, S. Mataguez, D. Hay & D. McFarlane LSC 24 th May /05/2013LSC – EN-MEF-OSS1.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
India-CERN Meeting in Mumbai (Visions for Future Collaborations) Steve Myers Director of Accelerators and Technology CERN.
Partikeldagarna, Göteborg 21 September 2007 LHC: Status and Plans Lyn Evans.
Critical spares LHC Performance Workshop Roberto Saban editor with contributions from A.Ballarino, Ch.Darve, G.Fernqvist, J.Íñigo-Golfín, K-H.Meß, V.Mertens,
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
The CERN Roadmap Frédérick Bordry
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
Injectors & LHC report K. Foraz on behalf of OSS members 01/11/13LSC - EN-MEF-OSS1.
Quality Assurance Overview Ranko Ostojic 12 Nov 2012.
Injectors & LHC report K. Foraz on behalf of OSS members 01/08/2013LSC - K. Foraz1.
D. Delikaris, TE-CRG, LSC 25th Meeting Page 2 October 18 th, 2013 LS1 Committee (LSC)- 25 th Meeting D. Delikaris, TE-CRG Cryogenics activities.
TE-CRG Activities D. Delikaris, TE-CRG.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
L. Tavian, TE/CRG, LSC Page 2 February 21 th, 2014 LS1 Committee (LSC) L. Tavian TE-CRG.
TE-CRG Activities A. Perin, on behalf on the Cryogenics Group.
YETS & LS2 Works EN-EL / Power distribution
K. Foraz on behalf of OSS members
Framework Schedule from EYETS 2016 to LS2
YETS & LS2 Works EN-El on LHC / Power distribution
SMACC Tenth report [15 min] 13/09/2013
EYETS David Hay EN-OSS.
Injector De-cabling Project
K. Foraz on behalf of OSS members
LIU – EVM status and next steps
Update of cryogenic activities
The LHC - Status Is COLD Is almost fully commissioned
LS1 Committee January 24th, 2014
Long Shutdown for the LHC: Vacuum Beam Pipes
LHC Dipole Diode Insulation Consolidation Review (I) INTRODUCTION
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
YETS & LS2 Works EN-EL / Power distribution
Overview & baseline of LS2 and roadmap for CRG
TE-MSC activities in SPS during YETS
Status of the BLHC ….work in progress! Mike Lamont CERN/AB 18/01/2008
K. Foraz on behalf of OSS members
LHC status Benoit Salvant (Beams department, Accelerator and Beam Physics group) for the LHC complex teams With many thanks for their inputs to J. Boyd,
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
SLHC-PP kick-off meeting, CERN 9 April 2008
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Aziz AMAMOU EACM – 21th May 2019
Cryogenic management of the LHC Run 2 dynamic heat loads
Presentation transcript:

LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013

2 LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013 ► Access system installed ► Cabling complete ► Beam dump replacement in progress ► New dump installed ► Re-installation of the BTM & BTY lines ► Maintenance of the different equipment on schedule ► Already preparing for LS2: cranes renovation, new cable trench Booster 27/09 01/11 15/11 29/11 PSB beam dump

3 LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013 Booster

4 LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013 PS ► Access system ► Ventilation renewal progressing well ► Dismantling is finished ► Automation test in progress ► Septum 16 shielding ► Piling work is complete ► Formworks going on ► Cabling campaign (and it starts with de-cabling !!) ► Magnet maintenance in progress ► 6/7 main units are being overhauled in the workshop ► Renovation of the power house is in progress 6th MU being consolidated in workshop TT2 decabling CV cabling works Septum 16 shielding - formworks

5 LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013 PS Mainly due to delay for the start of magnet maintenance – no impact on the end date

6 LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013 ► BA1 - Irradiated cabling campaign ► Progressing very well ► slightly ahead of schedule ► TT10 – repair of the vault on going ► Beam supports in place ► Installation of protective mesh in progress ► Refilling of the primary circuits started ► Septa replacement in BA23 in progress ► Kickers conditioning in progress ► Magnet exchange ► Cabling and optical fibers campaign on going SPS BA1 -irradiated cabling campaign TT10 vault SPS magnet exchange

7 LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013 SPS

8 LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013 Physics Beam commissioning Shutdown Powering tests FMAMJJASONDJFJFMAMJJASOND MA beam to beam available for works 16 th Feb. 4 th December LS 1 from 16th Feb to Dec. 2014

9 LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December th LHCC Meeting (25 th September 2013)

10 LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December Done % done

11 LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013 Reasons for splice repairs ►In average 31% of the splices in the sectors 56, 67, 78, 81 and 12 have been redone for different reasons. ►In sectors 12 and 23 the number of redone splices is significantly influenced by magnet replacements (72 splices in 12 and 36 splices in 23 redone after magnet replacement). Sector 56Sector 67Sector 78 Sector 81Sector 12Sector 23* Number of splices Repaired (%) **36** R-8 excess >5 µΩ (%) Geometrical (%) Other (%) Reasons for splice repairs in the different sectors (*updated ; **about 30% without magnet replacements). Courtesy of C. Scheuerlein

12 LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013 SMACC Dashboards Superconducting Magnets and Circuits Consolidation (SMACC). 3 weeks

13 LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013 Top ten R-8 outliers (*updated ) Dipole splice*R-8 (µΩ)Quad splice*R-8 (µΩ) QBBI.B24R7-M3-Ext-R77.5QQBI.20L8-M1-Ext-L116 QQBI.22L8-M3-Ext-L52.6QBQI.27R1-M1-Int-L54.8 QBBI.A14L8-M3-Int-R49.9QBBI.B18R2-M1-Int-L52.5 QQBI.16R8-M3-Int-R47.4QBBI.B25L8-M1-Int-R51.4 QQBI.22R7-M3-Int-L43.3QBBI.B31R1-M1-Int-L45.9 QQBI.19L1-M3 Ext-L41.8QQBI.30L8-M1-Int-L44.5 QBQI.32R7-M3-Int-L41.6QEBI.11L1-M1-Ext-L43.7 QBQI.31R6-M3-Ext-L40.6QBBI.B16R6-M1-Int-L41.7 QBBI.B27R7-M3-Ext-R39.1QBQI.19R1-M2-Ext-L41.4 QQBI.30R7-M3-Ext-R39.0QBQI.32R1-M2-Int-R41.3 SectorMax R-8 RBMax R-8 RQ µΩ (QBQI.18L6-M3-Ext-L) 30.4 µΩ (QBQI.26L6-M1-Int-L) µΩ (QBQI.31R6-M3-Ext-L) 41.7 µΩ (QBBI.B16R6-M1-Int-L) µΩ (QBBI.B24R7-M3-Ext-R) 116 µΩ (QQBI.20L8-M1-Ext-L) µΩ (QQBI.16R8-M3-Int-R) 43.7 µΩ (QEBI.11L1-M1-Ext-L) µΩ (QBQI.21L2-M3-Ext-L)54.8 µΩ (QBQI.27R1-M1-Ext-L) 23* 31.5 µΩ (QBQI.10R2-M3-Int-L)52.5 µΩ (QBBI.B18R2-M1-Int-L) Highest R-8 values of dipole and quadrupole splices per sector. Courtesy of C. Scheuerlein

14 LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013 ► Arc subsectors all tested: 20 internal helium leaks identified ► 14 identified to component (for repair). ► For 6 leaks not identified to component, further tests to be performed in phase 2. ► QRL ► 2 existing internal leak known ► 5 new internal leaks – under investigation LHC Preliminary leak tests Winter stop

15 LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013 Repair plan for QRL compensators

16 LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013 DFBA gimbal bellows status DFBAO Status: DFBAI (lower gimbal) in-situ repair completed in S45 DFBAF (lower gimbal) ready for in-situ repair in S34 DFBAK (in S56) (upper gimbal) under repair in B112 workshop DFBAO (in S78) (upper gimbal)  meeting on 5/12 for decision (in-situ or workshop) DFBAK Thanks to EN-MME, TE-MSC, TE-VSC, EN-HE & EN-MEF!

17 LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013 SMACC Progress report DFBA  DFBAK shuffling module has been transported to workshop according to RP rules Courtesy TE-CRG, TE-MSC, TE-VSC, EN-HE, EN-MEF, EN-MME and …

18 LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013 Maintenance Courtesy of Roberto Saban 400 kV & 66 kV circuit breakers 18 kV & 3.3 kV circuit breakers BeforeAfter Electricity Distribution Equipment

19 LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013 Maintenance Cooling and Ventilation Equipment Lack of maintenance for several years … … mud inside a heat exchanger Replacement campaign of the membranes of one-way valve or of flexible sleeves Three years mechanical maintenance of motors and pumps. Several critical situations found (e.g. shaft damaged at the connection with the impeller ) Courtesy of Roberto Saban

20 LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013 Major overhauling of cryoplants Aerzen Electrical Motors (66 units 3.3 kV) (54 units 400 V) Compressors (75 units) Courtesy of Laurent Tavian

21 LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013 LS 1 : major overhaul of LHC cryo compressors Capacity slide valve and support P6 Damaged slide bearing seat (QSCB-4-CP1) Courtesy of Laurent Tavian

22 LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013 Conclusion So far, LS1 is on schedule for beams in January 2015 for LHC

23 LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013 Expectations after Long Shutdown 1 (2015) Collisions at 13 TeV c.m. 25 ns bunch spacing Using new injector beam production scheme (BCMS), resulting in brighter beams. Number of bunches Intensity per bunch Transverse emittance Peak luminosity Pile up Int. yearly luminosity 25 ns BCMS × µm1.6×10 34 cm -2 s -1 ~43~42 fb -1 β * ≤ 0.5m (was 0.6 m in 2012) Other conditions: –Similar turn around time –Similar machine availability Expected maximum luminosity: 1.6 x cm -2 s -1 ± 20% –Limited by inner triplet heat load limit, due to collisions debris Courtesy of the LIU-PS project team Batch Compression and Merging and splitting (BCMS)

24 LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013 ~300 fb -1 “Baseline” luminosity

25 LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013 Only EYETS (19 weeks) (no Linac4 connection during Run2) LS2 starting in 2018 (July)18 months + 3months BC (Beam Commissioning) LS3LHC: starting in 2023 =>30 months + 3 BC injectors: in 2024 =>13 months + 3 BC LHC schedule beyond LS1 Run 2Run 3 Run 4 LS 2 LS 3 LS 4LS 5Run 5 LHC schedule approved by CERN management and LHC experiments spokespersons and technical coordinators Monday 2 nd December 2013