Ballast Water Management Engineering Technologies and Opportunities

Slides:



Advertisements
Similar presentations
Ballast water Development of an environmentally friendly technology to
Advertisements

Air Emissions Regulations Update Tripartite meeting 15/16 September 2006; Seoul
USCG Ballast Water Discharge Standard Overview of Notice of Proposed Rulemaking.
Refrigeration & Air Conditioning
US Coast Guard Ballast Water Discharge Standard Final Rule U.S. Coast Guard Environmental Standards Division Washington, D.C.
Lessons Learned from the Application of Risk Management in the Shipment of LNG.
Exchange of Ballast Water at Sea and Onboard Treatment
Corrosion Products Sampler (CPS)
Transport Canada / BMT Fleet Technology / Stantec / EcoStrategic Consultants 1 Canadian Ballast Water / AIS Program April 20, 2006 Vancouver, Washington.
Ballast Water Developments International Chamber of Shipping Tripartite 2008.
1 Reminder: Resistivity (ohms) is the reciprocal to conductivity (micro-Siemens)
Cooling As working temperatures rise, the strength of metals used reduces. This in turn will force manufacturers to use superior metals/alloys, which can.
Aquatic Invasive Species and Ballast Water Management Nicole A. Dobroski Marine Invasive Species Program California State Lands Commission.
Disease Control Products for Stored Potatoes
Ballast Water Risk and Management Randall Marshall WET Coordinator WA State Dept. of Ecology P.O. Box Olympia, Washington
California Ballast Water Management and Control Program - Update Maurya B. Falkner California State Lands Commission Marine Facilities Division WRP Annual.
JTS SafGen UV-OX Chlorine Dioxide Generator. Background Chlorine dioxide has been used for over 100 years. It is more selective than chlorine or bromines.
Leading the way; making a difference Ballast Water Management Current situation and challenges Oslo, September 25 th 2012 Erik Ranheim Senior Manager Research.
XI. Swimming Pools & Bathing Beaches A. Regulations & B. Design and safety.
1 Air Quality Regulation in California Critical Issues in Greenhouse Gases, Stationary Sources & Mobil Source Emissions January 12, 2007 Jim Flanagan.
South Fork WT Plant Tour 5/1/2007 South Fork WT Plant Tour 5/1/2007.
Safety Standards for LNG Fueled Vessels Marine Chemist Qualification Board Baltimore, MD October 23, 2014 CAPT John W. Mauger Office of Design & Engineering.
POWER PLANT.
US Coast Guard Ballast Water Discharge Standard Final Rule U.S. Coast Guard Environmental Standards Division Washington, D.C.
VOC Management Plan Frequently asked Questions (FAQs) Training Guidance and and understanding the Principles.
Nuke Reading Quiz 1.List two types of neutrons classified according to their kinetic energies. 2.List 2 possible outcomes when a neutron interacts with.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
STEAM HEATING.
Effective Use Of Peracetic Acid to Reduce Effluent Disinfection Byproduct in Water Resource Recovery Facilities Isaiah Shapiro, EIT Dimitri Katehis PhD,
Control of Marine Invasive Species in California Maurya B Falkner California State Lands Commission Marine Facilities Division Capitol Hill Ocean Week.
Performance Standards, Technology Assessment and the Next Steps for California’s Marine Invasive Species Program N. Dobroski, L. Takata, C. Scianni, and.
 1999 Ballast Water Management for Control of Nonindigenous Species Act  2003 Marine Invasive Species Act (MISA) ◦ Develop and recommend bw performance.
Comparison of Indicative Testing Tools for Ballast Water Compliance Assessment Christopher Brown California State Lands Commission Marine Invasive Species.
The Effectiveness of Bromine as a Method to Stop Microbial Invasions via Ballast Water By: Sarah Chmielewski Department of Biological Sciences, York College.
A New Concept for Resolving the Ballast Water Management Problem - Buoyancy-control Type Ballast-free Ship - Makoto Arai Dept. of Systems Design for Ocean-Space,
Batteries The purpose of the battery is to act as a reservoir for storing electricity.
: The Great Ships Initiative. Presentation Overview GSI objective and its four program elements Overview of GSI Management & Implementation Research Services.
1 WATER as A Resource. Drinking Water 2 Water Contamination  How do we know what is “clean water?” In other words, how do we know if water is “safe”
Physical vs. Chemical Change In a physical change the substance involved remains the same substance, even if the state has changed. In a chemical change.
6/5/2016 PEO Aircraft Carriers Aerosol Can Evacuation & Compaction Unit SBIR Topic N
US Coast Guard Ballast Water Discharge Standard Final Rule
Alternative Ballast Water Exchange Areas Workshop June 20-22, 2006 Seattle, Washington Maurya B Falkner California State Lands Commission Marine Facilities.
U. S. Coast Guard ANS Program Update September 10, 2003 ANSTF Western Regional Panel Mtg Presented by LCDR Kathy Moore Chief, Environmental Standards Division.
PSPC and the BW Convention Tokyo Tripartite Meeting, 2010.
2015 Biennial Report on the California Marine Invasive Species Program Marine Invasive Species Program California State Lands Commission February 20, 2015.
Proposed Amendments to Title 2, Division 3, Chapter 1, Article 4.7 Performance Standards and Assessment Protocols for the Discharge of Ballast Water for.
2011 Update: Ballast Water Treatment Technologies for Use in California Waters N. Dobroski, C. Scianni, and L. Takata Marine Invasive Species Program Marine.
Regional Action Plan for Sustainable Transport of Dangerous Goods along the Mekong River October 2014 Bangkok, Thailand 1 Background of the Regional.
PORT OPERATIONS AND THE ENVIRONMENT. Port construction and operation are compulsory development activities with potentially massive economic, social and.
Oregon Ballast Water Program Rian v. Hooff Department of Environmental Quality Portland, Oregon Pacific Ballast Water Group Meeting April 2014 Portland,
MODULE 9 BALLAST WATER MANAGEMENT ON SHIPS Views expressed in this presentation are those of the author and should not be construed as necessarily reflecting.
Olivia Ortega International Business and Logistics Graduating Class of 2010 California Maritime Academy.
Developing Ballast Water Regulations Presentation by Gerard McDonald to the 9th Asia-Pacific Heads Of Maritime Safety Agencies Forum April 2006.
 FPSO — floating production, storage, and offloading systems; offloading of the crude oil to a shuttle tanker;  These are typically converted or newly.
Ballast Water and Marine Invasive Species Prepared By: Mike Schwab.
Biological Pollution: Ballast water Invasive Aquatic species Jamyung Kim Marine Environmental Research Laboratory.
Dabney P. Hegg Senior Professional Staff U.S. Senate Committee on Commerce, Science and Transportation.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
What to Expect in the Maritime Policy in the 111th Congress
Fednav’s experience with bwts in the great lakes
ROCKET TESTING TYPES OF TESTS
Risk Assessment should include:
Marine Environmental Awareness Course
Environmental Compliance
Transportation of oil BY DR. GHULAM ABBAS.
Transportation of oil BY DR. GHULAM ABBAS.
Energy Conservation Through the Removal of Bio-film
Ballast Water Convention
CONSTANTA MARITIME UNIVERSITY FACULTY OF MARINE ENGINEERING Engineering programmed: Marine Engineering (Bachelor’s Degree) THE STUDY OF BALLAST SYSTEM.
Click to add Text Ballast Water and Invasive Species Md. Badyuzzaman.
Presentation transcript:

Ballast Water Management Engineering Technologies and Opportunities Spencer Schilling President Herbert Engineering Corp.

Overview Shipboard Ballast Operations Typical Ballast System Components AIS and Ballast Water Shipboard Ballast Water Management Solutions Exchange Treatment Treatment Technologies : Engineering Challenges

Shipboard Ballast Operations Why is ballast used? Maintain seaworthy condition when lightly loaded Draft, trim, stability, bending moment, shear force, slamming, propeller immersion, motions

Shipboard Ballast Operations How is it handled? Loading condition is assessed and ballast allocated to remain within safe operational limits Ballast movements coordinated with cargo operations Impact on Crew Provides for vessel safety Controls vessel motion for better comfort Requires daily management of ballast and maintenance of systems and tanks

Typical Ballast System Components Simple liquid storage/handling system Tanks, piping, valves, pumps Vents, overflows, sounding tubes, level indicators Remotely operated Sea chests and overboard discharges

Ballast System – Design Considerations Total ballast volume – 6,000 to >100,000 m3 Flow rates – 200 to 5000 m3/hr Head requirements – up to 30m In service flexibility (# tks, pipe, valves, …) Ballast Exchange Options Partial Ballast Conditions Control systems

What are AIS? Aquatic Invasive Species (AIS) are organisms transported by human activities to a region where they did not occur historically and have established reproducing populations in the wild. (Ref. Dobroski, ‘Aquatic Invasive Species and Ballast Water Management’)

How do we manage AIS? Prevention – Best line of defense, vector management Eradication – Costly and often impossible, over $6 million to eradicate Caulerpa (algae) from two small southern CA embayments Species management once established – restrict local movement, control populations in sensitive habitats if possible (Ref. Dobroski, ‘Aquatic Invasive Species and Ballast Water Management’)

How do they get here? Many mechanisms (vectors) capable of transporting AIS around the world Aquaculture, live seafood shipments, bait, pet store trade, intentional release Commercial ships responsible for up to 80% of introductions in coastal habitats Includes ballast water and vessel fouling (Ref. Dobroski, ‘Aquatic Invasive Species and Ballast Water Management’)

Ballast Water and AIS Species are introduced upon ballast water discharge in recipient regions (Ref. Dobroski, ‘Aquatic Invasive Species and Ballast Water Management’)

Ballast Water Management Options in California Retain all ballast on board the vessel Ballast water exchange Discharge to an approved shoreside treatment facility (currently no such facilities in CA) Use of alternative, environmentally sound CSLC or USCG approved method of treatment (Ref. Dobroski, ‘Aquatic Invasive Species and Ballast Water Management’)

Ballast Water Treatment Standards Organism Size Class California1,2 IMO Regulation D-21 Washington Organisms greater than 50 µm in minimum dimension No detectable living organisms < 10 viable organisms per cubic meter Technology to inactivate or remove: 95% zooplankton 99% bacteria and phytoplankton Organisms 10 – 50 µm in minimum dimension < 0.01 living organisms per ml < 10 viable organisms per ml Organisms less than 10 µm in minimum dimension Escherichia coli Intestinal enterococci Toxicogenic Vibrio cholerae (01 & 0139) < 103 bacteria/100 ml < 104 viruses/100 ml < 126 cfu3/100 ml < 33 cfu/100 ml < 1cfu/100 ml or < 1cfu/gram wet weight zoological samples < 250 cfu/100 ml < 100 cfu/100 ml < 1 cfu/100 ml or < 1 cfu/gram wet weight zooplankton samples [1] See Implementation Schedule (below) for dates by which vessels must meet California Interim Performance Standards and IMO Ballast Water Performance Standard [2] Final discharge standard for California, beginning January 1, 2020, is zero detectable living organisms for all organism size classes [3] Colony-forming-unit Implementation Schedule for Performance Standards (Ref. Dobroski, ‘Aquatic Invasive Species and Ballast Water Management’) Ballast Water Capacity of Vessel Standards apply to new vessels in this size class constructed on or after Standards apply to all other vessels in this size class beginning in < 1500 metric tons 2009 2016 < 1500 – 5000 metric tons 2014 > 5000 metric tons 2012

Treatment Technology Challenge Achieve desired kill rate Work at high flow rates and with large volumes Work with water of varying salinity, temperature, nutrients, clarity Do not introduce other personnel/environmental hazards Provide mechanism/process for testing/monitoring Do not disrupt ship operations/schedule Fit in limited space and survive ship conditions (vibration, pitch/roll motions,...) Use available power Do not add to ship maintenance Be economical to buy, install, use and maintain

Treatment Technology Solutions Chemical Biocides (“Active Substances”) Chlorine (Generated on Board) Ozone (Generated on Board) Proprietary Chemicals (some delivered pre-mixed) Mechanical Separation - Filters Physical Change to Ballast Water Environment Irradiate (UV light) Deoxygenate Heat

Chlorine NaCl + H2O + 2e NaOCl + H2 Generate Chlorine / Sodium Hypochlorate (bleach) with electrolytic cells on board Add solution when taking on ballast, maintain levels during voyage Lethal in hours >80% chance can meet IMO 2004 criteria Systems designed but limited testing to date High dosage levels can promote steel corrosion Concern about chemical residuals

Ozone Ozone generator on board using high voltage AC current Applied at uptake or discharge Lethal in 5-15 hours Short half life limits corrosion and makes safe at discharge <60% chance can meet IMO 2004 criteria Systems designed but limited testing to date

Proprietary Chemicals Pre-Mixed proprietary chemicals introduced at metered dosage rate when taking on ballast Chemicals degrade over time, designed to be safe at discharge Lethal in 24 hrs >80% chance can meet IMO 2004 criteria Full size testing ongoing High dosage levels can promote steel corrosion Concern about chemical residuals Example Peracetic Acid C2H4O3 acetic acid, hydrogen peroxide with sulfuric acid catalyst. Produced on shore, delivered to ship in chemical tanks

Mechanical Separation Filters and Cyclones Filters for larger organisms Done at uptake and/or discharge ‘Lethal’ at time of treatment <80% chance can meet IMO 2004 criteria Full scale testing on going

Filtration with Backflush Ballast Water Treatment SNAME Northern California Section Meeting Filtration with Backflush 50 microns is the practical lower limit Automatic backflush is required to allow for unattended operation Backflush process reduces the net flow rate and increases the system pressure drops External backflushing pump is required Probably not practical for bulkers and tankers with high flow rates and volumes . The target particle size for the filter stage, as mentioned earlier, is in the 50 to 100 micron size range. Prototype testing aboard a barge indicated that 50 microns is probably the practical lower limit for shipboard use (Parsons, Harkins 2000). Testing has also demonstrated the following: a 5-10mm (3/16” to 3/8”) prescreen upstream of the filter is required to protect the finer screens automatic backflush capability is required to allow for unattended operation – However, the backflush process can reduce the net flow rate and increase the system pressure drops. Real in-service experience has shown that the reduction in flow rate can be quite different than test-bed values. a pressure sustaining valve is required downstream of the filters to maintain the pressure differential between the discharge chamber and backflush chamber backflush timing in service can vary greatly from system test-bed values filter performance is enhanced if left in “wet lay-up” between ballast operations handling filter screens by crew for larger units must be addressed

Filtration with Backflush Ballast Water Treatment SNAME Northern California Section Meeting Filtration with Backflush Can remove most of the larger life forms A 50 micron screen will remove most or all of the zooplankton and some of the phytoplankton and dinoflagellates. Filters of a practical size are not effective against bacteria and viruses Useful in reducing turbidity (suspended solids)

Ballast Water Treatment SNAME Northern California Section Meeting Cyclonic Separation figure

Ballast Water Treatment SNAME Northern California Section Meeting Cyclonic Separation Can remove solids heavier than the sea water and larger than about 50 microns About 5% to 10% of the total flow rate is removed in the sludge discharge Pressure drop is about 0.8 bar plus backpressure valve at 1.2 to 1.5 bar A few important installation notes regarding shipboard installations of hydrocyclones: They should be installed as vertical as possible with the inlet at the top. They can be inclined if overhead space limitations exist, but performance may suffer as they approach a horizontal orientation. A 3/16” to 3/8” screen mesh is recommended at the sea water in intake to remove very large organisms. Gravity filling of tanks through a hydrocyclone will not work because the gravity head can not push solids overboard. They are particularly applicable on the ballast intake cycle where the separated particles can be discharged with a small percentage of the pumped water back into the harbor of origin. They have the advantage of being scalable to even the largest ballast pumping rates found on ships. Either a single very large unit or a bank of smaller hydrocyclones in parallel can be used to achieve the desired throughput. It is also may be possible to arrange units in series and optimize each for a different particle size or density. Note, total throughput to ballast tanks is still limited by pump capacity, increased system pressure, and volume of diverted sludge.

Ballast Water Treatment SNAME Northern California Section Meeting Cyclonic Separation Effectively remove the large vertebrates and invertebrates Not effective in reducing zooplankton density, but it does reduce live densities Not that effective in reducing bacteria, viruses, or phytoplankton

Physical Change to Environment Ultraviolet (UV) Light Ballast Water Treatment SNAME Northern California Section Meeting Physical Change to Environment Ultraviolet (UV) Light Inactivates living organisms by causing DNA mutations Proven effective against zooplankton, phytoplankton, bacteria and viruses. Need pretreatment to reduce size of organisms and exposure time Can be used on intake and discharge Ultra violet light in wavelengths from 200 to 280 nm can effectively inactivate bacteria, viruses, and other living organisms. The inactivation is caused by DNA mutations induced through absorption of UV light by DNA molecules. For disinfection of water (removal of human pathogens and viruses) the US FDA requires that all parts (each volume element) of the product receive a UV radiant exposure of at least 400 J/m2 (40 mWsec/cm2) at a wavelength of 254 nm. (USFDA 2000). UV irradiation has been the subject of laboratory testing on a range of marine organisms as well and found to be most effective in the wavelengths from 250 to 260 nm. Used on intake and discharge in case of organism regrowth

Ultraviolet (UV) Light Ballast Water Treatment SNAME Northern California Section Meeting Ultraviolet (UV) Light Can be automatically controlled and monitored Long history in the marine industry and demonstrated low maintenance requirements Basic technology is readily available on the market Turbid materials in the ballast flow attenuate and scatter the UV radiation Pre-filtration used to reduce attenuation/scatter of UV radiation and therefore improve efficiency of UV

Physical Change to Environment Deoxygenate Inert gas generated on board When mixed with water, lowers Oxygen and pH Lethal in 4 to 6 days >80% chance can meet IMO 2004 criteria Full scale testing on going, some systems approved by IMO Reduces corrosion, but can require closed tank vent system to maintain low oxygen atmosphere.

Physical Change to Environment Heat Treatment Heat water to threshold temperature (42 degC) Lethal in hours to days Requires large amount of energy and can be difficult to generate heat in port when ME not running <60% chance can meet IMO 2004 Criteria Full scale testing on going Heat promotes corrosion

Combined Systems Cyclonic + UV System (courtesy Optimar/Hyde Marine) Ballast Water Treatment SNAME Northern California Section Meeting Combined Systems Cyclonic + UV System (courtesy Optimar/Hyde Marine)

2- Stage Treatment Cyclonic Separator + UV

3 - Stage Treatment Filter + UV + Chemical 50 micron filtration remove large particles remove sediments UV light inactivate living organisms reduced efficacy with cloudy water Catalysts activated by UV energy producing oxidizing chemicals increases efficacy of UV in cloudy water

Life Cycle Costs Acquisition Installation Operating Maintenance $ ? 250 m3/hr 5000 m3/hr $100k to $400k $400k to $1800k Installation $50k to $125k $200k to $800k Operating $0.02/m3 to $0.45/m3 7000 m3 $140 $3,150 70,000 m3 $1,400 $31,500 Maintenance $ ?

Safety Issues Handling and storage of chemicals, radiation and other equipment meant to kill living organisms New risks to personnel and the environment IMO G9 Procedures considering eco-toxicology, human health and ship and crew safety (MEPC.126(53)) Local, State, National water quality regulations

Regulatory Compliance and Testing Organism Size Class California1,2 Organisms greater than 50 µm in minimum dimension No detectable living organisms Organisms 10 – 50 µm in minimum dimension < 0.01 living organisms per ml Organisms less than 10 µm in minimum dimension Escherichia coli Intestinal enterococci Toxicogenic Vibrio cholerae (01 & 0139) < 103 bacteria/100 ml < 104 viruses/100 ml < 126 cfu3/100 ml < 33 cfu/100 ml < 1cfu/100 ml or < 1cfu/gram wet weight zoological samples Stricter standards Testing is time consuming Lab results may not scale well to full size Functional testing and equipment certification “Type Approval”, or In service testing (“end of pipe”) for continuous monitoring

Need for Engineered Solutions Develop treatment technologies (Entrepreneur stage) Design testing methods and process for type approval or continuous monitoring Automatic ballast water analyzers (bug counters) Ship design adjustments and system integration Regulatory development/evaluation

Ballast Water Management Engineering Technologies and Opportunities Spencer Schilling President Herbert Engineering Corp.