Www.ieagreen.org.uk Long Term Integrity – Well Abandonment (GHG07/51) Risk assessment studies completed so far have all highlighted wells as a high potential.

Slides:



Advertisements
Similar presentations
Examples of good practice. Examples of Good Practice Use of external UK and/or international external organisations as non-funded partners (target country.
Advertisements

Health impact assessment explained
Pregnancy and complex social factors
Clarifying gold-plating - Better implementation of EU Legislation.
Quality Improvement Program 28 TAC §10.22 Workers’ Compensation Health Care Networks.
SCOH Technical Meeting October 18,  Why the new approach?  Risk-based Project Involvement  Required Project Actions  Compliance Assessment Program.
Child Protection Monitoring & Evaluation Reference Group (CP MERG) Ghazal Keshavarzian CP MERG Knowledge Management Consultant 7 October 2013.
Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
Action Plan Skills Building: Module 2 Defining Action Plan Purpose and Scope January 2013.
RP 65 and other API Activities on Carbon Capture and Storage Co-authors: R. Sweatman, S. Crookshank. M. Parker, S. Meadows, K. Ritter, B. Bellinger Presented.
Wenxin Zhang Department of Civic Design University of Liverpool
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
Use of Biomass with CCS (GHG/07/48) Use of sustainably grown biomass results in near-zero net CO 2 emissions Biomass plants with CCS.
Internal auditing for credit unions Nuala Comerford, Chair IIA Irish Region Committee Pamela McDonald Council Member IIA Credit Union Summer School Thursday,
Reviewing the relevance and effectiveness of the WHO Global Code of Practice on the International Recruitment of Health Second meeting of the Expert Advisory.
What If I Must Go Beyond a Preliminary Assessment? (the example of a USAID EA under Reg. 216) [DATE][SPEAKERS NAMES]
ACADEMIC PERFORMANCE AUDIT
Improving Corporate Governance in Malaysian Capital Markets – The Role of the Audit Committee Role of the Audit Committee in Assessing Audit Quality.
UNESCO/OECD Guidelines on transborder higher education Brussels October Counsellor Jan S. Levy.
The Future of Coal: Assessing risk and ensuring safe storage of CO2 in the subsurface 2009 Mid-America Regulatory Conference Moving toward Advanced Technologies.
Renewable Energy Policy: A Local Government Perspective Alison Johnson for PEC624: Dissertation.
Liaison activities with other organisations (GHG/07/46) EPRI CCS-CDM working group CSLF Financing CCS (joint IEA GHG – IEA CCC) Det.
DPG HEALTH MEETING USAID CONFERENCE ROOM 6 NOVEMBER 2013 International Health Regulation (2005)
1 International Working Forum on Regulatory Supervision of Legacy Sites (RSLS) Technical Meeting Amel MELLOUK – ASN / DRC Jérémie VALLET – MEDDE/MSNR Regulatory.
Building the Pipeline Infrastructure (GHG/07/49) Cost curve studies for North America and Europe completed to date indicate that you.
COMMITTEE FOR CO-OPERATIVES AND NPO SECTORS OF ICAI. The Institute of Chartered Accountants of India (Set up by an Act of Parliament) New Delhi.
Portfolio Committee Presentation Government printing Works Audit and Compliance 07 May 2013 Presented by: Chief Executive Officer.
Global AMR Surveillance | 3 December |1 | AMR surveillance: Roadmap for a global programme AMR surveillance: Roadmap for a global programme.
Brussels, 4 June 2010 Introduction I. HOTREC – an umbrella II. HOTREC Fire safety Project.
Regulatory Perspective on Development of
Design FRAME problem solving with the engineering design process F R A M E TEXAS TECH UNIVERSITY T-STEM Center © 2009 Texas Tech University T-STEM Center.
How To Build a Testing Project 1 Onyx Gabriel Rodriguez.
A Comparison of 42 Local, National, and International HIA Guidelines Andrew L. Dannenberg, MD, MPH Katherine Hebert, MCRP Arthur M. Wendel, MD, MPH Sarah.
© Crown copyright Met Office Requirements, objectives and desired outcomes for the Workshop Stuart Goldstraw, CBS IOS ET-SBO Chair, 24 th April 2013.
BPK Strategic Planning: Briefing for Denpasar Regional Office Leadership Team Craig Anderson Ahmed Fajarprana August 11-12, 2005.
The TERMPOL Review Process RDIMS# Presentation Outline  What is TERMPOL?  The Purpose of TERMPOL  How TERMPOL Works  Benefits of TERMPOL 
Slide 1 An Alfred McAlpine plc company. Thursday, 04 October 2007 Land Management Guidance (v2) Philippa Towler.
Disaster Recover Planning & Federal Information Systems Management Act Requirements December 2007 Central Maryland ISACA Chapter.
1 Overview on Present Database System of EIA for Sustainable Development of Nepal - Dipak Adhikari - Media Forum for Research and - Development (MFRD),
BSBPMG508A Manage Project Risk Manage Project Risk Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG508A.
INTERGOVERNMENTAL PANEL ON CLIMATE CHANGE (IPCC) The IPCC on Carbon dioxide Capture and Storage Heleen de Coninck (IPCC WG III on Mitigation) DEFRA/IRADe.
Remediation of Seepage from Geological Storage (GHG/07/43) Aim of study was to: Identify remediation approaches and techniques that.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
Medical Provider Network: Provider Re-credentialing Karen Jost Health Services Analysis Program Manager October 23, 2014.
California Integrated Waste Management Board Tire Flow Study Along the California-Mexico Border Region Special Waste Committee Meeting California Integrated.
Managing Smoke and Emissions. A new system for managing smoke and emissions in Victoria that will provide for coordinated: Investment Service delivery.
2015 Pipeline Safety Trust Conference November 20 th, 2015 | New Orleans, LA API RP 1175 Pipeline Leak Detection Program Management – New RP Highlights.
Guide to Options Comparison Revision of the SAFEGROUNDS Guidance James Penfold, Quintessa SAFESPUR, 4 October 2007.
Summary of the current status of studies Reports published since the last ExCo meeting Studies underway Studies about to start Other.
PD 8 OSFI Capital Update Stuart Wason Senior Director Actuarial Division OSFI CIA Appointed Actuary Seminar September 18, 2009.
BSBPMG508A Manage Project Risk Manage Project Risk Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG508A.
Industrial safety 0. Highlights Communication Management Evaluation Investigation Practice/implementation Development 1.
Internal Controls For Municipalities Vermont State Auditor’s Office – August 2008.
Major Project Governance Assessment Toolkit Mark Ritchie, University of Edinburgh Pauline Woods-Wilson, Lancaster University Project and Change Management.
John James Tintera, PG #325 Texas Alliance of Energy Producers Injection Well Regulatory Update April, 2016.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Health in All Policies - Health Impact Assessment and other approaches
DEP Legacy Well Emissions Study
Building the Foundation of Compliance
Financial Provision Protecting the Environment and the Public Purse
Building the Foundation of Compliance
Can SEA influence regional planning? The case of indonesia
QUALITY DEVELOPMENT IN COLOMBIA AND LATIN AMERICAN
Health Impact Assessment in Michigan
Change Assurance Update
Regulatory Changes and Industry Engagement
CEOS Organizational Matters
Umweltbundesamt, Austria
Role of Evaluation coordination group and Capacity Building Projects in Lithuania Vilija Šemetienė Head of Economic Analysis and Evaluation Division.
Portfolio Committee on Communications
Presentation transcript:

Long Term Integrity – Well Abandonment (GHG07/51) Risk assessment studies completed so far have all highlighted wells as a high potential risk for seepage Range of wells involved Injection, production abandoned wells Ultimately, all wells will need to be closed so they do not pose a future seepage source Expect injection and production wells to be completed to best practise Studies identify problems with well completions and gas seepage Recognised by Industry as an issue New API code developed

Long Term Integrity – Well Abandonment Abandonment procedures for wells in regions Developed and reinforced over time Likely that the CO 2 plume will spread over are that includes wells completed at different times Abandonment standard of old wells will be to a lower technical standard than newer ones Regions like Texas and Alberta there may be technical issues and significant financial costs involved to remediate all wells before a project starts Need to help guide future practise on well abandonment

Study Aims and Objectives Aim of study is to review well abandonment practises in regions where CCS will be deployed Objective: Highlight areas of concerns over long term integrity in current abandonment practises Help develop new guidelines Identify how best to remediate old abandoned wells

Outline Scope of the Study - 1 Well abandonment status Establish a high level regional data set to allow ease of assessment of issues such as: Good/bad record keep Good/bad abandonment procedures High/low population density Screening tool to highlight regions of concern Review of Abandonment Practise Examine potential problems with long term sealing potential in existing procedures

Outline Scope of the Study - 2 Guidelines/recommended practise for new abandonment practise Issues to consider include: Use of CO 2 resistant cements Plugging only across permeable zones or completely to surface Area of Influence Areal extent of plume in different formations will impact on different numbers of wells Can we develop a risk ranking methodology for wells to assess which to remediate first and those to monitor?

Study Outcomes Recommendations on reinforcement of current regulations on well abandonment Feed into Well bore Integrity network Peer review Will need close co-operation with industry and regulatory bodies to be successful Achieve this through network

Long Term Integrity – Well Abandonment Committee is asked to: Approve proceeding with the study Suggest possible contractors Suggest expert reviewers for the study report Resources: Financial – Average Management – Average