Biorid Task List discussions June 14, 2011 Mike Beebe Paul Depinet Alex Schmitt GTR7-07-10.

Slides:



Advertisements
Similar presentations
Evaluation of the new certification test procedures Christian Gehre
Advertisements

WorldSID debut for UN / WP 29
1 KOREA GTR No.7 2 nd Phase Research Results Dec. 8, 2009 Ministry of Land, Transport and Maritime Affairs, Korea Automobile Testing and Research Institute.
51 st GRSP Session Draft new Regulation on child restraint systems Pierre CASTAING Informal document GRSP (51 st GRSP, May 2012, agenda item.
Injury Criteria Analysis Plan
Objectives of IWG CRS Improve child safety by improved protocol and validated tools IWG CRS take care of protocol Needs advice from WG12 on the tools,
50th GRSP Session Status report of Informal Group on FI Pierre CASTAING Chairman Informal document GRSP (50th GRSP, December 2011, agenda item.
GTR-7 IWG Meeting 3 – Summary of Decisions and Actions Page  1  Harmonised drawings -Most drawings and tolerance agreed. Completion expected June  Upright.
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
Designing a Ergonomic Workstation Engineering Ergonomics Safety Training Office of Engineering Safety Texas Engineering Experiment Station (TEES) & The.
Safety Restraint System
Presentation to the GRSP December 2001 WorldSID Advanced Harmonised Dummy for Side Impact Martin Page C.E.E.S.A.R. (representing LAB) On behalf of the.
Status report GRSP IWG ECRS 53rd GRSP Geneva May 2013 Informal document GRSP (53 nd GRSP, May 2013, agenda item 19)
September 8, 2015 THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER Helios Vocca.
Office of Science Coupling Coil Status S. Gourlay August 1, 2012.
WorldSID 5 th TEG ISO WorldSID 50 th Group Summary of Meetings 16 March 2012 London, UK.
44th GRSP Session Status report of Informal Group on CRS Pierre CASTAING Chairman Informal Document No. GRSP (44th session, December 2008,
EEVC WG20 European Enhanced Vehicle-safety Committee 12 th December, 2006 Slide 1 EEVC WG20 and WG12 Rear Impact Test Procedure Development Programme Presented.
1 SAFESPOT Project SP1 SAFEPROBE , Torino Volvo Integration progress Andreas Ekfjorden Volvo (Sweden) SAFEPROBESAFEPROBE.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
Target 18 Jun H. Kanda. To do list Aluminum cell (Type 2 and 3) –Mirapro: Invoices delivered, invoice for the shorter cell was requested PET pipe.
Introduction to Revision of GTR 7
Short Report Status of GTR No. 7/BioRID TEG
WorldSID 50 th Update Klaus Bortenschlager PDB - Partnership for Dummy Technology and Biomechanics on behalf of the WorldSID Task Group 44 th GRSP Session.
European Enhanced Vehicle-safety Committee Developing an European Interior Headform Test Procedure T. Langner on behalf of EEVC WG 13 19th International.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
Head Restraints Working Group Meeting Paris, France February 1-2, 2005 U.S. FMVSS No. 202 Final Rule Head Restraint IWG Document:HR-1-8.
3 rd Meeting of the IWG GTR No. 7 Draft Status Report of the BioRID TEG Bernd Lorenz (BASt) Chairman Geneva,17 th May 2010 GTR
NSTX TF Flag Joint Status of Design, Analysis, Test Activities & Design Review Preparations C Neumeyer NSTX Team Meeting 7/24/3.
Draft Status Report of the BioRID TEG Bernd Lorenz (BASt) Chairman 51 st GRSP Geneva, 21 st May 2012 Informal document GRSP (51st GRSP, 21–25 May.
WorldSID Update Edmund Hautmann BMW Group On behalf of the WorldSID Task Group 34 th GRSP Session Geneva, December 8-12, 2003 Edmund Hautmann BMW Group.
EECV WG20, Progress, December 2003 EEVC WG20 Rear Impact test procedure(s) and the mitigation of neck injury Progress, December 2003 Informal document.
BioRIDII New Sled Evaluation Data Observations from Ford Safety Lab Tests TEGID-07.
Proposal of the Informal Working Group on Head Restraints GTR Phase 2 JAPAN Informal document No. GRSP (43rd GRSP, May 2008, agenda item.
ES-2 Back Plate/Seat Interaction George Mouchahoir May, 2002.
Tomelleri S.r.l. ® Copyright 2007 © ASTRONOMY AND RESEARCH July 23rd 2008 VST Meeting1.
Clinical Implications from Rear Impact Investigations of a Wheelchair & Occupant Presenter: John Tiernan CEng 1 Co-Authors: Jennifer Walsh 2, Ciaran Simms.
Prep At School | 15 Copy: GN, CU 5 Cut: GN, CU 3 Load: video 2 Set-up: clay, wire, ribbon, spring scale 5 At Home | x xxx.
Scenario use cases Szymon Mueller PSNC. Agenda 1.General description of experiment use case. 2.Detailed description of use cases: 1.Preparation for observation.
QXF Coil working group 2/11/16 Dan Cheng J. DiMarco, C. Hernikl, D. Humphries, S. Myers, X. Wang MQXFA Coil Fiducialization Proposal.
D Day Lesson starter: 1.What was the Holocaust? 2.Name three groups of people that the Nazis were against.
VELO Replacement Girish Patel University of Liverpool.
Vehicle Safety Systems Group. Restraint Systems Standards Committee Doug Stein/David Funnell Seat Belt Systems Standards Committee Mike Haldenwanger Pretensioner.
Chalmers University of Technology Suggestions for new BioRID certification procedures By Johan Davidsson, Chalmers University of Technology GTR
Test Tube Activities at Ohio State (7/29/03) Amphenol/Spectra Strip will send two 10 m long samples of signal cable –With a (round) jacket, shielding –20.
X-Spot Lamp Socket Replacement Procedure
End of Line “Pass Through” Conveyor
new straw end plug: D=10.6 mm straws support frame Levan option
Status of straw production straw module assembling
Transmitted by the IWVTA Informal Group
WorldSID Positioning Sub-Committee Update
DT Infrastructure: LV, HV, Gas
45th GRSP Session Status report of Informal Group on CRS
FIGURE 26-1 A typical airbag system showing many of the components.
Measurement Capabilities of Biofidelic 3.4 Kg Infant Dummy
BioRIDII Repeatability on Production Seat
CLEPA analysis of belt contact width measurement (ref. GRSP/2018/6)
BioRID vs. HIII Develop new “side-by-side” buck
Dynamic criteria Biorid
Q-Dummy Behaviours following used types of pulses
Introduction to Revision of GTR 7
Status of Readout Boards
Standardized Child Passenger Safety Training Program Winter 2004
Limited Streamer Tube Project Summary
National Standardized Child Passenger Safety Training Program May 2004
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
WLTP GTR 15 WLTP-12-18e Report by Drafting Coordinator, Serge Dubuc
National Standardized Child Passenger Safety Training Program May 2004
Introduction to Revision of GTR 7
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

Biorid Task List discussions June 14, 2011 Mike Beebe Paul Depinet Alex Schmitt GTR

PDB Dummy Investigation Project ► June 2011 (need Monthly progress reports) –Humanetics Europe  Perform arm testing with head rest test with standard probe  Ship PDB Dummies & Seats to Ohio for testing ► July 2011 –Humanetics US  Review dummies  Perform baseline certification tests  Perform PDB type sled testing, ORSP, NHTSA,?? –Pressure map seat back –Add accelerometers and angle rate sensors to spine –New a volunteer to use their sled –Analysis data and develop follow on sled test plan ► August 2011 –Humanetics Europe  Perform addition sled tests, David H EEVC tests for sled tests  PDB would like another group to volunteer to perform tests  Can Chrysler run side by side Biorids they have Humanetics will see if they can loam a dummy for Sled tests?

Possible Sled Test Help ► OSRP-Agnes and Jack will check ► VRTC-Bruce, may have time the end of July ► EEVC –David H will be point of contact for Europe Sled testing ► Chrysler-Brian may be able to test two dummies in seats (Humanetics needs to check to see if we can provide a dummy) ► BAST? ► OSU seat?

Humanetics Germany Task List ► Arm testing –Can not find what is creating the random neck force issue –Has tried, many set up changes but not able to reproduce the random neck load –Half arm with camera –Large probe testing with half arms installed ► Certification testing –Overlays to compare with Huron tests ► Instrumentation currently on dummies –Connector issues, pig tails??? –VW Lemo F connectors (Need to send wiring for both dummies to Huron) –D Lemo 1B types (May need different insert in crimp tool) ► Shipping –Dummies (Need to get ok from owners or PDB) –Seats (PDB will ship)

Humanetics Huron task list ► Perform certification tests first ► Complete review of the dummies ► Make pigtails, Connector work ► Fixtures –Adaptor to move dummy forward –Create a seat back similar to PDB seat with load cells, Biosid load cells from Germany are available to use, will send with dummies ► Create Sled Testing Matrix

Meeting ► NHTSA, ORSP, PBD Sled testing meeting week later during the week of June 20

OSRP and NHTSA Sled testing ► Seats –mounting, –Belts –Can we pressure map seat back? –NHTSA has a car seat to use, can they also run the PDB seat? –PDB Seating procedure for the dummy is required ► BioRIDs –Huron will test and review dummies before sled testing –Use clothing & shoes provided from PDB ► Additional Instrumentation Requested –Accelerometers at standard location –Every where possible, accelerometers and gyros –Spine set up tilt sensors, Head, T1, T4, T8, etc…., use RDI mount, mounted on accel cube ► Sled pulse – Run both pulses (SRA 16, ANNEX 9) (NHTSA Pulse?) ► Test Matrix – How many tests (3 of each Type) – Do we change jackets between the dummies – Change dummies between seats – Change heads between dummies – Change teflon back plates between dummies