You have responded very positively to the earlier comments and have narrowed down the scope of the research to a more manageable size. The topic is now.

Slides:



Advertisements
Similar presentations
The Use of Online Methodology to Inform Public Policy Planning: A Case Study from San Francisco See Mobility, Access, and Pricing Study Final Report, Chapter.
Advertisements

Section Four Urban problems. Urban problems of Hong Kong Traffic congestion.
Report Writing.
Unit 7a Travel Arrangements
Hong Kong-Zhuhai-Macau Bridge
D2 Roadway Discussion Sound Transit Board September 22, 2011.
Transportation Systems Highway Transportation Characteristics.
Travel and Transport By Sophie and Annabelle. What are the problems of transport? Some of the problems that we have with transport now is that... 1.Lots.
Strategic Environmental Assessment “Back to the Future” By Dr Anne F Kerr 18 June 2005.
MGSC CITY PROJECT – TRANSPORT MEGAN LUCY BRIDGET MORTON EMMA FERGUSON 9B.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
MTF Rail Development Forum
Commerce Project Transportation. Structure of Transportation BackHome.
Hong Kong International Airport Hong Kong International Airport is situated 37.4 km from Central District of Hong Kong. It is easily accessible by road,
Central-Wan Chai Reclamation
Investigating Traffic in Glasgow
Mini-Workshop Writing a Persuasive Essay Assignment Choose an Issue Identify Your Thesis and Call for Action Consider Purpose and Audience Support Your.
©2015 Paul Read 5.7 Writing Problem and Solution Essays in Part Two /sizes/z/in/photostream/
Kenia Garcia Monica Molina UC MERCED CAT TRACKS. SURVEY QUESTION 1.
Recent Developments in UK Travel and Tourism BTEC National Travel and Tourism.
HSL Helsinki Region Transport Local Rail Projects in Finland Arttu Kuukankorpi Head of Route Network and Timetable Planning Group.
1 Requirements for Long-distance Bus Terminals in Germany Prof. Dr. Andreas Saxinger Michaela Nachtsheim.
Urban functions. Q1.give reasons for the land uses that you assigned to each area  Most of the land uses are the residential land use and are clustered.
Sustainable planning for Hong Kong Harbour District 23 February 2004.
Business Logistics 420 Public Transportation Lecture 18: Demand Forecasting.
Transit Service Detours during Confederation Line Construction Transit Commission December 9, 2013.
Arriva in Southend Kevin Hawkins Commercial Director.
{ The writing process Welcome. In the prewriting stage the follow must be considered:   factual information pertaining to topic   clear definition.
TRANSPORT The Cambridge Futures response to the Draft Structure Plan Dr Tony Hargreaves, Cambridge Futures.
Prague Integrated Transport (PID).  Prague - area 496 km 2 population 1.2 mil. distance of the city boundary from the centre is 10 km to the north, 18.
The Transport Revolution Jeremiah Ho, Liu Mengxi, Low Jin Siang 1.
Question 2 Compare your results with other groups. Is there any significant difference? If yes, suggest reasons.
How far do you agree that reclamation is the most effective way to increase the supply of land in Hong Kong? (Case: Central and Wan Chai Waterfront) Sabrina.
1. Variety of modes (types) of transport (public and private) 2. Density of transport networks more nodes and.
Q1. How far is it from ( ) to ( )? A1. It’s about ( ) metres / kilometres. Q2. How long does it take to go from ( ) to ( ) by MTR? A2. It takes about.
April 2 nd,  What steps should you take when dissecting a writing prompt?  Why?  How do they help you organize a paper?
BELMONT TRANSPORT PACKAGE A49 – B4349 (Relief Road Southern Section) Meeting 14 June 2013.
How to Satisfy Reviewer B and Other Thoughts on the Publication Process: Reviewers’ Perspectives Don Roy Past Editor, Marketing Management Journal.
Go West Policy Old Chinese Proverb: If you build it, they will come.
Existing Railway and Highway Network Tai O Lantau Island Hong Kong Island New Airport at Chek Lap Kok Sha Tin Tsuen Wan New Territories Tuen Mun.
Turn Penalties Based on Junction Delays Imported from SATURN Need for Strategic & Detailed Model Need for Strategic & Detailed Model Traditional Methodology.
Route and Network Planning
IPART’s review of CityRail’s regulatory framework – stakeholder roundtable 31 July 2008.
The Rise and Fall of Theme Parks in Hong Kong. From the surveys.
Choosing method of travel The method of travel chosen will depend on the following: the reason for the trip who is going on the trip (level of responsibility)
Form 3 History Mini- research ~Interactive Game~ Topic: Kai Tak Airport.
DRAFT – FOR DISCUSSION ONLY Student Reassignment Survey Nash-Rocky Mount Public Schools October 1 – November 1, 2012.
Sustainable development??
Fostering Mobility in a Compact City – Hong Kong’s Experience Professor Anthony B.L. Cheung Secretary for Transport and Housing Hong Kong, China.
高二牛津(下) Module 7 Improving our lives Unit 4 Public transport.
The Six Major Infrastructure in Kowloon How To Maintain A Sustainable City?
By Jordan Zabroski. The Transportation Revolution was a period of time where steam power, railroads, canals, roads, and bridges emerged as new forms of.
Baby, don't you worry so / this ain't the time to suffer /and baby, i'm in a hurry to... we're just in a hurry / to be happy / we are doing fine /since.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
Gerald Jennings President Leeds Chamber of Commerce 18 th February 2016 HS2 Leeds The right place for the station in Leeds.
1 Appeals Workshop Consultation, February 2015 Consultation website:
1 Update on Transit in West Kelowna District of West Kelowna - November 12, 2013 Matthew Boyd – Senior Transit Planner Steve Harvard – Senior Regional.
Nottingham Workplace Parking Levy Sue Flack Director for Planning and Transport.
RAIL TRANSPORT. 1.1 BACKGROUND OF RAIL TRANSPORT.
Northern Transforming Rail Travel in the North Matthew Worman Stakeholder Manager 11 th April 2016.
Industry Briefing 25 May 2016.
N° 1 Possible co-operation between rail and buses in the area of Telematics Applications for Passengers Presented by European Railway Agency (ERA) th.
Transportation Master Plan Update Warden’s Forum May 7, 2015.
Agenda – Morning Session
Evaluation and Re-Design Haifa and Yafa Streets.
REGIONAL RAPID RAIL All us are here in this room because we don’t just love Auckland, but because we believe in Auckland and it’s potential to be greater.
Hong Kong-Zhuhai-Macau Bridge
Delivering the North East Chelmsford Growth Ambition
NORMS AND STANDARDS FOR PUBLIC TRANSPORT IN GAUTENG PROVINCE
GCP Transport Update Meeting for: M11 J11 Park & Ride Engagement Group
Presentation transcript:

You have responded very positively to the earlier comments and have narrowed down the scope of the research to a more manageable size. The topic is now more meaningful and debatable. Let’s start with three basic characteristics of a good research (significant, non-trivial, researchable). For significance, the chosen topic is definitely important because most people take MTR or other public transport almost everyday. For a research to be non-trivial, we have to demonstrate to others that there are debatable (not known beforehand) questions that without doing the research, we do not know the answers. You have to argue more explicitly why this is a non-trivial research topic. For example, most people would think MTR is convenient, but there must be a lot of situations (connections between points) that buses /mini-buses provide more direct and convenient services. Try to give more similar arguments so that before we start the research, we have no way to decide whether MTR is really more convenient than other public transport means. For this particular research, the most difficult part is to design a methodology so that you can give a “Fair” comparison and hence a conclusion as to whether MTR is really convenient and less expensive. Let’s assume representatives from MTR, buses, mini-buses are attending your presentations, will they agree with your method and your conclusion. You have given a detailed account of the history of the development of MTR in Hong Kong, but that is not very related to the research question “convenience and inexpensiveness”. Try to provide some linkage between the historical development and your research question. You have used only one route (Hang Hau to Mei Foo). Could you propose, say 20 popular routes, compare and suggest whether people would find the MTR (against mini-bus, buses, etc.) more convenient and inexpensive? For convenience, you might like to use more indicators (e.g., dependability, comfort, travelling time, walking time to the station) (get these important criteria through interview). Find from interviews how people would weigh the relative importance of convenience and cost (and other relevant factors). Find out when people will prefer one means (e.g., MTR) over the others.

By: Chan Kai Tong 3S(2),Chan Tsz Ho, Chow Ka Lok 3J(8), Chung Chi Ngo 3S(12),Kwong Huen Kwan 3Y(13), Ip Claudio Alan 3Y(40)

1. Is MTR the cheapest in long and short distance of all transport? 2. Is MTR the fastest transport? 3. Is a good transport should be same as MTR?

During the 1960s, the government of Hong Kong saw a need to accommodate increasing road traffic as Hong Kong's economy continued to grow strongly. British transportation consultants Freeman, Fox, Wilbur Smith & Associates were appointed to study the transportation system of Hong Kong. The study was based on the projection of the population of Hong Kong for 1986, estimated at 6,868,000. On , the consultants submitted to the government the Hong Kong Mass Transport Study, which recommended the construction of a 40-mile rail rapid-transit system in Hong Kong.

The study suggested that four rail lines be developed in six stages, with a completion date set between December 1973 and December Detailed positions of lines and stations were presented in the study. These four lines were Kwun Tong Line, Tsuen Wan Line, Island Line, and Shatin Line. The study was submitted to the Legislative Council on The consultants received new data of 1966 by-census in A short supplementary report was submitted on and amended in June The by-census indicated that the projected 1986 population was reduced to 5,647,000, a reduction from a previous estimate by more than 1 million.

The dramatic reduction in projection affected town planning. The population distribution was largely different from the original study. The 1986 populations of Castle Peak New Town, Sha Tin New Town, and, to a lesser extent, Tsuen Wan New Town, were not as high as expected, and the plan of a new town in Tseung Kwan O was abandoned. In this updated scenario, the consultants diminished the scale of the recommended system. The supplementary report stated that the originally suggested four tracks between Admiralty station and Mong Kok station should be reduced to two, and only the Island Line, Tsuen Wan Line, and Kwun Tong Line should be constructed in the system. The other lines would be placed in the list of extensions. This report led to the final study in In 1970, a system with four lines was laid out and planned as part of the British consultants' new report, Hong Kong Mass Transit: Further Studies.

The four lines were to be the Kwun Tong Line, Tsuen Wan Line, Island Line, and East Kowloon Line. However, the lines that were eventually constructed were somewhat different compared to the lines that were originally proposed by the Hong Kong Mass Transport Study. In 1972, the Hong Kong government authorised construction of the Initial System, a 20-kilometre system that roughly translates to the Kwun Tong Line of today. Negotiations with four major construction consortia started in 1973.

The government's intention was to tender the entire project, based on the British design, as a single tender at a fixed price. A consortium from Japan signed an agreement to construct the system in early 1974, but in December of the same year, it pulled out of the agreement for reasons stemming from fears of the Arab oil crisis.

The network is becoming wider and wider. These can earn a lot of money for the company but the most important is can help the people for going everywhere safety, quickly and easily. Also, can be improve the community quality of a cosmopolitan city in Asia. (1979 to 1980) Kwun Tong Line In early 1975, a government agency known as the Mass Transport Provisional Authority was established to take charge of the project. It announced that the Initial System would be reduced to 15.6– kilometers. (1980s) Tsuen Wan Line The project added a 10.5-kilometre section to the MTR system, from Prince Edward to Tsuen Wan. The line started service on with a total cost of construction and constructed a new international airport at Chek Lap Kok on Lantau Island to replace the overcrowded Kai Tak International Airport Network

(2000s) Tseung Kwan O Line The Quarry Bay Congestion Relief Works involved extending the Hong Kong Island end of the Kwun Tong Line from Quarry Bay to North Point via a 4.2– kilometer tunnel. The project was initiated due to overcrowding at Quarry Bay and persistent passenger complaints about the 5-minute walk from the Island Line platforms to the Kwun Tong Line platform. Construction began in September 1997 and was completed in September Disneyland Resort Line The Disneyland Resort Line, previously known as Penny's Bay Rail Link, provides service to the Hong Kong Disneyland Resort. It is a 3.5–kilometer single-track railway that runs between Sunny Bay station and Disneyland Resort station; The Disneyland Resort station itself is designed to blend in with the Hong Kong Disneyland to create a resort ambience. The line currently operates fully-automated Interchange Works Two major works were undertaken to facilitate interchange between MTR and KCR East Rail. The modification of Kowloon Tong station started in June A new pedestrian link to East Rail Kowloon Tong station southern concourse and a new entrance were completed in June 2003 to cope with the increase in interchange passenger flow.

Facilities Known as the trains, the oldest model of MTR since its operation, the facilities which inside the train were too poor in the past. Everyone maybe don’t know I would say so. Here are some points to discuss with: . By the logical sense, there were no air-conditioner pass away. Absolutely, there also hadn’t air-condition supply. It was hard during the people sweating that are smelly. . The interior’s compartments of an MTR were not enough sitting seat for passengers who would tired and not satisfied if no place for them to sit. . In the past that almost no handle of the MTR. People were easily fell down while the train was braking suddenly. This was a fault of the constructions.

MTRBus PlaceFrom Hang Hau to Mei Foo Price of adult (octopus) $8.0$9.2 Price of child (octopus) $3.6$4.1 Time (min)4170

The price of adult of MTR and the bus are $8 and $9.2. The price of child of MTR and the bus are $3.6 and $4.1. The time of traveling of MTR and the bus are 41 and 70 minutes.

By the result, we can make these conclusions: the price of adult of MTR is cheaper than the bus. so the price of child of MTR is also cheap then the bus. so traveling by MTR is fast than the bus Summarize the above points, we can sure that traveling by MTR is better than the bus