7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

Slides:



Advertisements
Similar presentations
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
Advertisements

HMA Warranties Seminar for CALTRANS Lee Gallivan FHWA Indiana Division April 3 rd, 2003.
QUALITY ASSURANCE FOR CONTRACTED MAINTENANCE IN ONTARIO, CANADA
TRAFFIC MANAGEMENT Tender and Construction Phase
ASPHALT PRICE ADJUSTMENT PRICE ESCALATION IN THE 21 ST CENTURY.
USE OF POLYURETHANE GROUT FOR CONCRETE PAVEMENT SLAB STABILIZATION Indiana County District 10-0 Lessons Learned 1.
Alternate Bidding: The West Virginia Experience 2011Virginia Concrete Conference March 3, 2011 Richmond, VA Bob Long Executive Director ACPA Mid-Atlantic.
CALTRANS EXPERIENCE WITH WARRANTIES. WHY WARRANTY The Right Strategy at the Right Time Shift Responsibility of Quality Control to Contractor State Responsibility.
Pavements. Concrete –Rigid pavement Used where strength is an issue Runways, interstates and major roads –Continuous reinforcing Must have a good base.
Full-Depth Reclamation Using a Cement Slurry Spreader Attached to a Ready Mixed Concrete Truck W. Spencer Guthrie, Ph.D., Associate Professor Charles A.
Tolerances and Price Impacts Presented by:- Er. Bhagawan Shrestha.
ALLEGAN COUNTY PRIMARY ROAD MILLAGE AREA 2 JANUARY 21, 2014.
 Narrow roadway, with no shoulders  Poor pavement condition  AADT 405/150 – Low Traffic Volume  Ideal candidate for P.I.P.
The Future is Thin: Surface Mix Experience and Performance in the City of Ottawa Steve Goodman, M.Eng., P.Eng. Senior Pavement Engineer, City of Ottawa.
Pavement Design Terms and Concepts
mydocs-presentations-2011PAPAMWF-EricaRevisions
NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,
 Embankment Construction – LOTs  What is the maximum length of a LOT? Mainline pavement lanes, turn lanes, ramps, parking lots, concrete box.
Chapter 5 Patching and Edge Repair
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
VALUE ADDED FEATURES Who’s Excited??? 2015 Construction Academy Larry Ritchie July 28 th, 2015.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
Bridge Engineering Section Bridge Rehabilitation.
FUEL AND ASPHALT COST ADJUSTMENT PROVISIONS. Use of Cost Adjustment Provisions FHWA Technical Advisory Dec 10, 1980 –“Price volatility of construction.
Roadway Preservation Intranet Page. Location: Intranet/Roadway-Preservation.aspx.
Mn/DOT AUDIT COUNTY HIGHWAY ACCOUNTANTS SINGLE AUDIT DISCUSSION.
Working Successfully With Property Managers: An Interactive Engagement
 Have an approved mix design before paving.  The department has eliminated the use of PG -22 Asphaltic Material and replaced it with PG -28.  Tack.
Session #3 Asphalt 103- Materials: Basics of RAP, Usage and Specifications.
Estimating PS&E – Plans, specifications and estimate 1.
MICHIGAN EXPERIENCE WITH WARRANTY WORK. Warranty Program History Why Warranties ? Warranty Specifications Experience & Lessons Learned.
Procedures in Modern Road Construction I. Development of Ancient Roads 1. Great civilizations throughout history enhanced road building. 2. Cross-section.
I N S T R U M E N T E S T R U C T U R A L E I N R O M A N I A Infrastructure Development in Romania Workshop.
HBP Warranties – The Cost Benefit Evaluation Begins By: Jay Goldbaum, P.E. Colorado Department of Transportation Pavement Management and Design Program.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
REVISED May 2009STATE MATERIALS OFFICE Goals in this Session To understand:  The Sampling & Testing process  The Project Certification process  The.
2003 Warranty Presentations Caltrans WARRANTED HMA PAVEMENTS PAVEMENTS.
Plan Scales (see DOT 1B-3) 22”x34” paper for final designs (preliminary usually ½ size, 11”x17”) 1. Plan view: a) Rural a) 1:1000 plan scale (or 1”=100’)
Cost Estimation Strategies for Keeping Track of the Vastness Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specifications-Show how project.
Stacy Hagenbucher.  Process Improvements  Clarification  Trends  Finals Tracking  Trends  Why Missing Dates  Additional Resource  Issues on sites.
STH 21 Adams County Project # Project Specifics Project Specifics Asphaltic Pavement Milling Asphaltic Pavement Milling Pulverizing Shoulders.
ROAD CONSTRUCTION COSTS Key Concepts. Types of Main Road Works Routine Maintenance Works are day-to-day running repairs, e.g. Potholes, depressions, crack.
WEDGEWOOD COVE HOA STREET PAVING/RESURFACING PROJECT.
90% PLAN APPROVAL. Presentation Outline  Board Direction  90% Plan Modifications  Cost Estimates  Project Timeline  Recommendation.
Table Discussions 2015 SE Meeting. Scenario #1-Project Completion A $1 million bridge replacement project has a completion date of August 1 th. This date.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
Expanded Shave and Pave Program Roads and Parks Maintenance Department Development & Infrastructure Division October 23, 2012.
Essex County Transportation Services Department Essex County Highways 2016 Construction Program Peter Bziuk P. Eng. Manager Design and Construction Services.
Full Depth Reclamation
John Donahue, P.E. Missouri DOT 5 th Annual Building Green with Concrete Workshop June 21, 2012.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
PROJECT SELECTION RIGHT TOOLS, RIGHT TIME, RIGHT PROJECT Presented by Joe Ririe, PE PAVEMENT ENGINEERING INC. September 9, 2015.
Quantity Calculations Module 3. Quantity Calculations  Specifications  Post Bid Quantity Calculations  Production Quantity Calculations –Checking Yield.
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
Presenters: Sumon Roy1 and Badrul Ahsan1
Pavement condition index calculation
PS&E – Plans, specifications and estimate
PAVEMENTS CEE 320 Steve Muench.
Pavement Preservation
New Specifications for 2017
Document Development for Metro Project: Performance-based Procurement Asphalt Overlay for Programmed Maintenance 17/01/2019.
Pavement Structural Analysis
Pavement Structural Analysis
Prime Factors for Successful Preservation Treatments
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
Presentation transcript:

7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario

Thunder Bay North Bay Sudbury Windsor KingstonToronto Ottawa Hamilton London Nebraska Texas Ontario

Topography

Downsview

QEW/Redhill Creek Expressway

Southern Rural Highway (Hwy 6)

Northern Freeway (Hwy 69)

Northern Highway (2-Lane)

LT Warranty Concept

Why 7-Year Pavement Warranties? Move toward performance specifications Reduce contract administration, pay items, inspection and testing costs Encourage innovation Reduce overall project and lifecycle costs “7” years provides confidence that the year service life will be achieved

Project Selection 2 lane and 4 lane rural highways with less than 5,000 AADT/design lane Uniform pavement performance without extensive problematic soils/swamp conditions left untreated Normally less than 100 km from a permanent HMA plant

Categories of Warranty Projects Two Categories –Rehabilitation –Reconstruction

Pavement “Rehabilitation” Treatment of some or all the existing materials from the top to the bottom of the existing bituminous layers Includes: –Partial or full depth asphalt removal with resurfacing –Cold in-place recycling with asphalt resurfacing

Pavement “Reconstruction” Treatment of all existing bituminous layers and a minimum of 150 mm of the underlying granular material Includes: –removal of all bituminous layers and some or all of the granular material and replacement with new or recycled materials –full depth in-place reclamation to a minimum depth of 150 mm into the granular, with or without milling or stabilization, with asphalt resurfacing

MTO Design Responsibilities The usual ground survey and geotechnical field data is collected MTO designs: –the alignment and final cross-section of the hwy –special treatments to widen the roadway subgrade or stabilise shoulders and embankments –ditches, culverts, frost heave treatments –any other non-pavement work included in the project

Principles of Pavement Warranty Projects The contractor is responsible for the pavement design, materials and workmanship The warranty is on pavement performance for a fixed period of 7 years Minimal material requirements are specified. Standard specifications are not specified MTO’s pavement design is for internal use only The Contractor’s design is reviewed for compliance

Principles cont’d One “Pavement with Warranty” lump sum item includes all costs within pavement design envelope Info provided to Bidders: traffic level for design, surveys, soil borings, pavement cores, X–sections if applicable, past contracts if available Soils and pavement data is not guaranteed to be sufficient Field investigation by bidders allowed, preferably with no snow in ditches, during minimum 6 week advertising period

LT Warranties – Estimating Cost

Warranty - Estimating Template Refer to Notes page for additional definitions Designer to provide values in blue cells Contract Number2009-xxxx Highway419 Length of Contract (kms)10 Date Prepared January 12, 2009

$65, Sub Total - Design/Engineering $ 0.00 Additional Requirements Expenses which contractor is responsible for under the Special Provision for the Tender Item - Pavement with Warranty. $35,000.00Default value of $35,000Pavement Design Report Allowable expenses for additional Geotechnical Investigation either before or after award. $30,000.00$3, Enter per kilometre value ($3,000 or $5,000) based on pavement condition - Geotechnical Investigation Design/Engineering (Contractor)

$18, Sub Total - Quality Control Insert estimated number of working days in Cell F22 $18,000.00$ Additional QC Allowable expenses for additional Quality Control to ensure completed work complies with pavement design. Rate/day Working Days Additional Staff Additional Quality Control - (Design Consultant employed by Contractor)

Construction Value - (Based on Region's Original Pavement Design Report) Item CodeItem DescriptionUnitQuantity Revised Quantity* Estimator s Unit Price Extension Earth ExcavationM $11.24$332, Hot Mix Misc.M $14.18$40, Superpave 9.5T $244.98$17, Superpave 12.5T $102.77$1,302, Superpave 19.0T $80.63$3,750, Tack CoatM $0.29$62, Granular AT $18.68$1,422, Granular B, Type IIIT $15.17$560, Full depth reclamation with expanded asphalt stabilization M $1.80$146, Rout and SealM $7.50$10, Removal of Asphalt Paving (Full Depth)M $6.60$29, Removal of Asphalt from Concrete (Bridges) M $14.00$6, Removal of Asphalt (Partial Depth)M $2.20$175, *Overrun factor on Quantities5%This value used to calculate "Revised Quantity" column Sub Total - Items $7,285, **Inflation Factor3% If Applicable - Value not required if estimate is finalized near Tender Opening Date $218, Sub Total - Construction Value $7,503,886.90

Contractor Initiated Improvements on Design (Additional quantity added by contractor ) Comments / Reference Item Unit QuantityAdj. Quant. Unit Price Extension These costs are to cover an additional 50 mm lift of binder and 100 mm of Granular 'A' that the contractor may include during initial construction phase to insure that pavement structure will not crack over the 7 year warranty period SuperPave 12.5 T 6,037$107.00$645, Tack Coat M2 M2 68,333$0.29 $19, Granular A T 11,892$12.71 $151, $816,922.99

$156, Sub Total - Rout and Seal Insert Regional Estimate if available in cell H85. $ LS Regional Estimate (to be used instead of calculation if available) Estimated Region's Estimated Value $24, $20, LSTraffic Control* $132,314.40$8.16$ mRegional Historical Repair Quantity *Traffic Control = Number of days x $3,000/day + $5,000 for signs and barrels Extension Inflated Unit Price Base Unit Price QuantityUnitsDescription of Item & Notes 5Number of days to complete work 4Year the work will be done => Values only required if using "Calculated Value" Values used to calculate Inflated Unit Price 5%Inflation per Year => Calculated Value Warranty Repair - Rout and Seal: (Use only one - Calculated or Region's Estimated Value.)

$490, Sub Total Mill and Pave $40, LS Traffic Control $1,840.00$ m Pavement Marking $2,401.20$0.35 6,900 m2m2 Tack Coat $443,966.40$ ,800 t Superpave 12.5 $2,000.00$2.00 1,000 t Reclaim Asphalt Pavement - partial depth 50 mm 7 Year the work will be done 5%Inflation per year Selective Resurfacing - Year 7 Comments / Reference Warranty Repair - Mill & Pave

$60, Sub Total - Warranty Work $25, Road side inspection, re-testing of QA testing to confirm results. Also includes as-built drawings and final verification. Final Inspection Reasonable expenses contractor may incur over warranty period $35, Assume $5,000 per year for road side inspection and QC testing. Warranty Administration Administration During Warranty Period

$375, Sub Total - Unknowns and Risk Acceptable allowance for unforeseen expenses that contractor may incur and/or Acceptable Premium for new tendering concept. Note: % is only applied to warranty items 5% Enter value up to 5% of warranty work Unknowns and Contractor Risk

$8,178,395.65TOTAL VALUE FOR TENDER ITEM $375, Unknowns or Risk $60, Administration $0.00 Mill & Pave $156, Rout & Seal $7,503, Contract Work $18, Additional QC Total Value of Tender Item for Pavement with Warranty shall be entered in Regional's HiCo Estimate prior to submission to CRO. (Attach Spreadsheet to the Tender Item - "Pavement with Warranty" in HiCo.) $65, Design Costs Summary: Tender Item - Pavement with Warranty

Contracts to Date

Contract EstimateLow BidEstimate to Low Bid %Treatment 1 $11,013, $ 14,907, %Full Depth Pulverizing 2 $12,793, $ 12,354, %Cold In Place 3 $ 4,846, $ 6,551, %Full Depth Pulverizing 4 $ 3,058, $ 2,611, %Rem Asphalt, Add Gran, Pave 5 $ 4,731, $ 4,969, %In Place FD Recl 6 $ 7,415, $ 6,953, % Pulverize existing asphalt to 115mm 7 $ 8,765, $ 11,420, %In Place FD Recl 8 $ 5,529, $ 7,919, % Cold In Place Recl w/Expanded Asp Average Estimate to Low Bid % =-8.1%

ContractLow Bid Estimate to Low Bid %2nd Bidder3rd Bidder No. of Bidders 1 $14,907, % $19,715, $12,354, % $12,538, $12,562, $ 6,551, % $ 6,657, $ 7,738, $ 2,611, % $ 2,639, $ 3,463, $ 4,969, % $ 7,514, $ 9,378, $ 6,953, % $ 7,890, $ 8,104, $11,420, % $15,497, $19,496, $ 7,919, % $ 8,443, $10,916,