Marvels of Material Master Data Solved with SAP Business Objects

Slides:



Advertisements
Similar presentations
INTRODUCTION Agenda BUSINESS CHALLENGES FEATURES OF RAPID MARTS SOLUTION OVERVIEW DWH USING SAP RAPID MARTS BENEFITS TO BUSINESS USERS.
Advertisements

MIGRATION MIGR-09. How to Run Your Next Implementation... Don't Let It Run You! Patricia Johnson Senior Systems Consultant Strategic Systems Group, Inc.
ICIS-NPDES Plugin Design Preview Webinar ICIS-NPDES Full Batch OpenNode2 Plugin Project Presented by Bill Rensmith Windsor Solutions, Inc. 3/15/2012.
Business Information Warehouse Business Information Warehouse.
AXC01 DIXF: The Microsoft Dynamics AX Data Import and Export Framework
Module 8 Importing and Exporting Data. Module Overview Transferring Data To/From SQL Server Importing & Exporting Table Data Inserting Data in Bulk.
Introduction to Workflow. Slide 2 Overview What is workflow? What is business process management? Common workflow and process problems The functional.
Multi-Mode Survey Management An Approach to Addressing its Challenges
SAP Overview SAP Solutions. 2 Agenda for the overview Introduction to the SAP R/3 system SAP system’s functionality SAP implemenation methodology mySAP.com.
University of Southern California Introduction to Enterprise Wide Information Systems Configuring SAP Instructor: Richard W. Vawter.
Rapid data migration to SAP ERP Proposal Framework.
1 ERP  What are Enterprise Resource Planning (ERP) Systems? Incredibly large, extensive software packages used to manage a firm’s business processes.
1 Meeting the Reporting Challenges at International Paper.
Integration of Applications MIS3502: Application Integration and Evaluation Paul Weinberg Adapted from material by Arnold Kurtz, David.
M ERP (Enterprise Resources Planning) M ERP (Enterprise Resources Planning) Session 8 - ERP Modules Ir. Ekananta Manalif, MM, MKom (D2664)
 SAP AG 2000 FAQ.ppt / 1 FAQ LSMW Frequently Asked Questions concerning LSMW.
Ashoka Indonesia Implementation Kick-off August 2014
Tech Indira IT Solutions Pvt Ltd
Introduction to SAP R/3.
University of Southern California Enterprise Wide Information Systems The Procurement Process Instructor: Richard W. Vawter.
What is the QlikView Connector?
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
1 Components of A Successful Data Warehouse Chris Wheaton, Co-Founder, Client Advocate.
000000_1 Confidential and proprietary information of Ingram Micro Inc. — Do not distribute or duplicate without Ingram Micro's express written permission.
January 2007 (v1.0) The Rushmore Group, LLC1 SAP Overview The Rushmore Group, LLC.
 ETL: Extract Transformation and Load  Term is used to describe data migration or data conversion process  ETL may be part of the business process repeated.
UNWBW1 – Business Information Warehouse NetWeaver Support Consultant Training Data Loading.
Agenda 02/21/2013 Discuss exercise Answer questions in task #1 Put up your sample databases for tasks #2 and #3 Define ETL in more depth by the activities.
IS 466 ADVANCED TOPICS IN INFORMATION SYSTEMS LECTURER : NOUF ALMUJALLY 3 – 10 – 2011 College Of Computer Science and Information, Information Systems.
Pervasive Integration Platform for Salesforce. Company Overview Founded in 1994 with 205+ employees NASDAQ: PVSW, $43M in 2008 revenue 10,000+ Worldwide.
What is Oracle Hyperion Planning  Centralized, web- based Budgeting and Planning application  Combines Operational and Financial measures to improve.
MyFloridaMarketPlace CRB Meeting
University of Wisconsin System HRS Project Update to ITC November 19, 2010.
2 Copyright © Oracle Corporation, All rights reserved. Defining Data Warehouse Concepts and Terminology.
OWB Implementation Testimonial Presented by David Cordas Data Architecture Team Lead LUCRUM, Incorporated 312 Plum Street, Suite 1110 Cincinnati, OH
High Level Strategy Dependencies Milestones Roles and Responsibilities Iterative Approach Multiple Legacy / Targets Scope Several different migration methods.
ETL Extract. Design Logical before Physical Have a plan Identify Data source candidates Analyze source systems with data- profiling tools Receive walk-through.
普 华 永 道 Phase 1: Project Preparation Phase 1: Project Preparation Phase Overview Phase Overview.
Rapid data migration to cloud solutions from SAP
Enterprise Resource Planning Dr. Djamal Ziani. ERP Business Functions And SAP System CHAPTER 2.
I Copyright © 2007, Oracle. All rights reserved. Module i: Siebel 8.0 Essentials Training Siebel 8.0 Essentials.
For the Chicago Chapter BOUG Meeting – August 20, 2010
Wily Overview, Configuration and Usage Rick Kriehn Harley-Davidson, Inc Technical Analyst – Basis October 1, 2010
 SAP AG April Accelerating Data Migration: LSM Workbench Legacy System Migration Workbench
IBM Global Services © 2005 IBM Corporation SAP Legacy System Migration Workbench| March-2005 ALE (Application Link Enabling)
Oracle’s EPM System and Strategy
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
2 Copyright © 2006, Oracle. All rights reserved. Defining Data Warehouse Concepts and Terminology.
SAP BODS Online Training and Placement in USA Online | classroom| Corporate Training | certifications | placements| support CONTACT US: MAGNIFIC TRAINING.
Contact us: Call: , , Mail: Visit:
Critical Business Challenge 702 Adams Street · Carmel · IN · · Phone · Fax · GyanSys team helped migrate.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Bill Murdoch and Ralf Brecht Bayer Business Services 2010 Information Lifecycle Management Page 1 SAP NetWeaver Information Lifecycle Management and SAP.
Qlikview Connector for use with SAP Netweaver(R) Adrian Bereanu Enterprise Architecture, SAP Technologies.
Introduction The Intercompany Integration Solution for SAP Business One Version 2.0 for SAP Business One 9.1 Welcome to the introduction of the Intercompany.
SAP Overview.
OUR JOURNEY FROM EXCEL TO QLIK
Overview of MDM Site Hub
Content & the Supply Chain
ARCH-1: Application Architecture made Simple
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
IT and Development support services
Customer Acquisition Initiative
Sara Hagopian Solution Architect
Reportnet 3.0 Database Feasibility Study – Approach
Sample Assessment & Governance Results
Speaker’s Name, SAP Month 00, 2017
Integrated Statistical Production System WITH GSBPM
Presentation transcript:

Marvels of Material Master Data Solved with SAP Business Objects Carla Cook Suncor (C Cubed Information Services Inc) Bill Towsley Suncor Peter Aynsley-Hartwell Utopia Inc.

What We Will Cover Suncor Overview The Data Migration Project The Tools & Approach The Reality and The Results Key points to Take Home Questions

Suncor Energy Suncor Energy is the largest Canadian Oil and Gas company 300,000 plus bbls/day synthetic crude oil 4 refineries totaling 450,000 bbls/day 1,500 plus retail and wholesale outlets 350 different lubricant and specialty fluid products Implemented SAP enterprise-wide in 2006 Owner of Petro-Canada (SAP since 1993)

Data Migration Project

Overall Scope Integrate former Petro-Canada processes and data into Suncor SAP Legacy Systems Source: PeopleSoft SAP ECC 6.0 SAP CRM Target: SAP MDM SAP SRM

Overall Scope SAP Modules FI/CO, MM, SD, PM,PS, HRM, CRM, SRM 80 Objects requiring ETL (Extract Transform Load) 30 Objects managed with SBO Data Services Total timeframe of 13 months with 3 staged releases Systems Integration – Deloitte Data Migration – Suncor/SAP/Utopia SAP Support - IBM Slide 6

Project Timelines and SBO Data Services Landscape The Data Migration Project Project Timelines and SBO Data Services Landscape Slide 7

2010 2011 2012 Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct R3 Integration Testing M&D Lubes R3 go-live (8/2) I&O Montréal Edmonton/Burrard (non-distribution) BUILD (2/11) Deploy QA1 R3 ITC1 (3/18) R3 ITC2 R3 UAT (6/3) I&O go-live (10/3) QA2 (4/15) (7/1) S1 S2 S3 Montréal go-live (10/31) FRICEW Build – FUT Readiness 100% Development (1/28) (6/3) QA3 Priority 3 (12/15) S1 S2 S3 Edmonton go-live (1/30) (2/11) Functional Unit Testing Para. Perf. (7/1) Data Conversion Build / Cleansing Data Cleansing 2nd Data Trial – All Objects (~12/17) ITC Prep. (3/25) BPP Updates/Creation Change, Training & Communication Training Devel. Complete (1/28) Release System Freeze Security Build Security Testing (increasing scope) Legacy PC to Suncor BW Migration To Be Data Model SPIM Gate-4 Master Queries WB/Query Ration./Dispo. LPC User WB/Query Build/Test R2B PSSP Build (Sustain.) R2B PSSP Testing (Sustain.) R2B PSSP Deploy (Sustain.) HR Build R3/R4 FUT Prep. HR FUT HR PR1 HR PR2 HR PR3 2 CCD’s & 70% Development (1/21) R2B HR GL Prep 100% Config & Development (2/28) 8 Key Milestone / Interim Milestone/ Deliverable Completion Dates Phase Completion Milestone Dates

Landscape - SBO Data flows in the Suncor Landscape DEV SAP Q DR4 Client 305 LPC Prod Copy IQ2 Extract data to be moved Load converted data Extract Configuration Oracle DB/Server 500GB SAP Q SR4 LPC Prod IPR Extract data to be moved Load converted & de-duplicated data Extract Configuration Oracle DB/Server 500GB Suncor Prod PR1 to de-duplicate QA SAP Q SR4 Final Build LPC Prod IPR Extract data to be moved Load converted & de-duplicated data Extract Configuration Oracle DB/Server 500GB Suncor Prod PR1 to de-duplicate PROD Slide 9

Data Migration Challenges The Data Migration Project Data Migration Challenges Slide 10

Data Migration Challenges Extracting from a live production system Difficult to do cleansing, de-duplication at source Loading live into production landscape Need to move millions of records in a short time without disrupting existing system Complex data mapping Source and target not nearly the same configuration

Data Migration Challenges Moving target Short time frame means developing while continuing to refine data mapping spec Agile ETL required Needed to be able to ETL, validate, refine, repeat De-duplication Data cleansing after extract Slide 12

Technology Approach and Methodology Organization The Data Migration Project Tools and Approach Technology Approach and Methodology Organization Slide 13

Technology SAP Business Objects Data Services SAP NetWeaver MDM SAP Legacy System Migration Workbench SAP Standard IDOCs (Intermediary DOCument) Custom ABAP programs

Technology The SAP Business Objects Data Services

Approach and Methodology Utilised SAP Best Practices for Data Quality SAP’s Enterprise Information Management (EIM) Best Practices provides a repeatable process to deliver consistent, sustainable results. Implementation of business rules provides automation of key processes for the data migration process. Integrate quality checks into all data touch points for on-going data governance. Data Quality for all data: Customer, Supplier, Product, and beyond. Manages the process throughout the entire ETL event.

Approach and Methodology Legacy Data Environment Data Staging and Test Environment Loading LSMW Files IDocs Pre-Built load routines for SAP Objects Target Environment Dashboards and Business Reporting Performance Analysis Staging Area SAP Configuration Extraction SAP Flat Files/ Excel Data Services Platform Cleanse Name Parsing Address Parsing & Correction Material/Product Parsing Matching Validate & Load Transform Business Validation Rules Automatic SAP Config Validation Data into SAP structure Extract & Profile Databases Applications Reconciliation XML Transparency, Communication and Governance,

Approach and Methodology

Organization - Data Mgmt Operational Structure

Organization ETL Team SBO MDM Business Function DM Focal (lead) 30 Objects 6 on-shore 4 off-shore 3 on-shore 3 off-shore 30 on-shore 5 on-shore (split between 30 objects) Slide 20

The Reality and The Results The Data Migration Project The Reality and The Results Why ETL? How we utilized the tools Benefits What would we do differently? Slide 21

Sample Data Objects – why ETL Volume (Source) Complexity Data Quality Transformation Rules (Target) Pricing Conditions 1,000,000 High Complex Vendor 95,000 Medium Low 15,000 Product – Light Oils 339 339 x 1500 plants 508,500

How we utilized the tools A look under the hood at the Material Master ETL Slide 23

Materials: Data Flow & Implementation Steps SBO Tasks MDM Tasks 3 Import Materials into MDM via XML PI PC DATA (SAP - IPR) Sequential updates 5 2 MATNR comes back MDM 1 Dedupe / Match / Validate LEIH – LEIH HIBE – Z005, Z007, Z013, Z016 RHIB/FHIB – Z006 ? - Z008 Z015 – Service masters ? - Z017? SAP IR4 XML Data SBO LEIH Z005 Z006 Z007 Z008 Z013 Z015 Z016 Z017 Implement scenarios below. 4 XML files on MATMAS05 format > 1000 records each file 6 X-ref XREF Scenario #1 (update) LPC Material exists in Suncor. We will need to extend the Suncor Material with the PC plant NOTES: * Neither SBO or MDM are pulling in Suncor Materials * MDM will have no data to begin Scenario #2 (Create) LPC Material does not exist in Suncor Material to be created and duplicate MATNRs to be added to record Slide 24

Slide 25

Slide 26

Slide 27

The Benefits - Compare Release 1 with Release 3 Release 1 (July 2010) ETL using ABAP and SAP MDM Extract from source, transform in-flight load to MDM Mapping changes required ETL re-process(14 hrs for Materials) Release 3 (July 2011) Utilizing SAP Business Objects Data Services and the SAP Data Migration Framework Mapping changes require only a re-run of specific SBO jobs (minutes not hours)

The Benefits - Utilized SAP Technology Connect directly to SAP for extraction by OBJECT Utilizes the data model table structures and relationships IDOCS for Loading Using standard IDOC identified inappropriate screen customizations transported into the target system

The Benefits - Utilized SAP Technology Pre-Validation of Check Values before loading No requirement for trial loads to test the data Automatically adjusts for configuration changes Data in a common staging area Easy to update and repeat if rules/requirements changed Cross object validation easy eg PO ->Vendor -> Material -> PIR Slide 31

What would we do differently? Follow best practices more stringently Use the end-to-end process rather than break out to “existing” custom ABAP and LSMW Not allow acceptance testing to be disconnected from data loads Test scenarios need to use loaded data and be flexible Understand the target configuration e.g. Custom user-exits on forms not supported by BAPIs

Key Points to Take Home What worked for Suncor Slide 33

What worked for Suncor Establishing a strong data management team Using standard processes and tools wherever possible Using a robust ETL tool that met our key requirements of: Flexibility Agility Repeatability

Peter Aynsley-Hartwell (C Cubed Information Services) Bill Towsley Suncor Energy btowsley@suncor.com Peter Aynsley-Hartwell Utopia Inc peter@utopiainc.com Carla Cook Suncor Energy (C Cubed Information Services) carla.cook@ccubedis.com Q&A

March 27 – 30, 2011 Hyatt Regency Huntington Beach Resort and Spa Huntington Beach, California

SAP Data Migration Framework Subhead (Arial 40 Bold) Text (Arial 40 Regular) Demoted Text (Arial 34 Regular)

Slide 38

The Reality and The Results Slide 39

The Reality and The Results Slide 40

The Reality and The Results Slide 41