March 02, 2009LHCb Muon Commissioning meeting 1 First week of chambers test Alessandro Cardini, Davide Pinci, Fernando Rodrigues, Maria Luisa Porto, Rafael.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Triple-GEM detector operation for high-rate particle triggering W. Bonivento, G. Bencivenni, A. Cardini, C. Deplano, P. de Simone, F. Murtas, D. Pinci,
Service Board Production Test Rafael Nobrega LHCb Roma1.
T1 status and plans INFN Genova November 2014 Collaboration Meeting.
New Chambers for M23R12 for the Muon Upgrade Alessandro Cardini INFN Cagliari.
Pavia 25/11/2003Davide Piccolo INFN Napoli Status of assembling and Chamber results at HT Pavia 25/11/2003 Davide Piccolo.
02-Mar-09A. Cardini / CERN & INFN1 Muon Detector Status (week 9: Feb 23 rd  Feb 27 th ) Present: Ale, Thomas, Nikolai, Oleg, Sasha, Maria Luisa, Perluigi,
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
Chamber Background Friday Lights on 10:39 Long DMA has a leak… ignore the first few points.. An update is in the next slide..
MUON piquet report 18/9 -24/ Nikolai Bondar.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
.Compare bipolar and ON-OFF line codes in terms of spectrum efficiency, transperancy, error detection and timing.
G.Bencivenni LNF/INFNMuon Meeting 21-October-2002 Status Report on triple-GEM detector M.Alfonsi 1, G. Bencivenni 1, W. Bonivento 2,A.Cardini 2,C. Deplano.
Chamber parameters that we can modify and that affect the rising time Number of ionisation clusters produced in the drift gap: Poisson Distribution Probability.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
1 Status of the Test System of the MWPC for the LHCb Muon System Andre’ Massafferri (Universita’ Tor Vergata – INFN sezione II - Roma) V. Bocci, R. Nobrega.
Debugging of M2-M5 G. Passaleva. 11/02/2009 Muon System mini review G. Passaleva 2 outline Short summary of Muon readout channel organization Connectivity.
Muon commissioning status and plans G.P. C. De Plano.
Front-end boards tests G. Auriemma, D. Fidanza G. Pirozzi( $ ) & C. Satriano ( $ ) Present address: European Patent Office, Branch at The Hague, Patentlaan.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Dressing Test for the LHCb Muon MWP Chambers LECC 2006 Valencia Speaker: Rafael Antunes Nobrega (INFN Roma1) INFN Roma1: V. Bocci, R. Nobrega INFN Roma2:
Building 16, 17, 153, 162, 173 (256) Safety - Renovation CH DENARIE CERN PH/DT MARCH 2011.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Preliminary results of a detailed study on the discharge probability for a triple-GEM detector at PSI G. Bencivenni, A. Cardini, P. de Simone, F. Murtas.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 1/19 Outer Tracker Module Production at NIKHEF Produced 60 modules  Production Progress.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
Tony WeidbergOpto WG April '081 SCT Links Long Term Monitoring Summary quality installed links Techniques for monitoring long term performance –Data links.
Gas Quality Checks Maria Luisa Porto Oriented by: Burkhard Schmidt 23/02/2009.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
Review POSTING Refer to link: Note%20-%20Posting.html Note%20-%20Posting.html.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
Run2 Muon System Experts and other thoughts Alessandro Cardini INFN Cagliari.
1 M2-M5 Efficiency and Timing checks on 7TeV beam data Alessia, Roberta R.Santacesaria, April 23 rd, Muon Operation
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
M1 Central Part Cable Routing R3 FAR R2 CLOSE R2 FAR + GEM A3 B From chain GEM R2 CLOSE R2 FAR A1 20 A1 A1 A2 A CHAIN Access Front Dané.
Muon System Update: Next Steps Alessandro Cardini INFN Cagliari.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
Chamber electronics test bench Valerio Bocci Rafael Nobrega, Davide Pinci (INFN sez. Roma) Giovanni Carboni,Andre Massaferri,Roberto Messi, Emanuele Santovetti.
Update on the M1 schedule Muon Meeting March 23, 2009 Burkhard Schmidt.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
1 9 December 2002A.P.Kashchuk (LNF/INFN), Frascati) New approach to CPC design.
Piquet report (07/Aug/ /Aug/2012) D. Pinci.
27 December 2006 LHCb Status Report (A.Vorobyov) 1 LHCb.
1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa.
On Chamber Front End electronics Test Valerio Bocci Rafael Nobrega, Davide Pinci (INFN sez. Roma) Giovanni Carboni,Andre Massaferri,Roberto Messi, Emanuele.
Status of the Muon detector Alessandro Cardini CERN & INFN Cagliari Thanks do Davide, Rafael, Maurizio, Oleg, for part of the material included here.
Noise results from SR1 combined SCT barrel tests Summary of some initial results Alan Barr, UCL Pepe Bernabeu, Valencia.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
D. De Gruttola SALE-01: issues with HV supply fixed SALE-01: issues with HV supply fixed QA weekly meeting 26/04/2016.
Silvia Costantini RPC General Meeting CMS week 15 June 2010.
TOTEM Collaboration Meeting June 2007
MODULE QUALIFICATION STATUS AT LIVERPOOL
Preparation for CERN test beam
G. Carboni for the Muon Group
DT Infrastructure: LV, HV, Gas
Maki KUROSAWA VTX Group 2014 Feb 20
VELO Software Status Some highlights of recent work
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Meaning of Slope for Equations, Graphs, and Tables
a + 2 = 6 What does this represent? 2 a
VELO Software Update TELL1 Algorithms Error analysis
Verify chip performance
Presentation transcript:

March 02, 2009LHCb Muon Commissioning meeting 1 First week of chambers test Alessandro Cardini, Davide Pinci, Fernando Rodrigues, Maria Luisa Porto, Rafael Nobrega,

2 Threshold Scan Analysis Procedure for M1R4 chambers: 1)Verify the chamber with a threshold equal to 0.0 fC - we do this to found dead channels. 2)Verify the chamber with a threshold equal to 3.0 fC – search for noisy channels. 3)If a channel continued to be RED (noise > 100 Hz) if we change the threshold to 4.0 fC. We check the channel with the NOISE PLOT.

3 Good with 3fC: M1A.26C.R4.5A M1A.24C.R4.5A M1A.22C.R4.5A M1A.20C.R4.5A M1A.18C.R4.5A M1A.16C.R4.1A M1A.14C.R4.1A M1A.10C.R4.1A M1A.06C.R4.1A M1A.04C.R4.1A M1A.02C.R4.1A M1A.30A.R4.3A M1A.28A.R4.3A M1A.26A.R4.3A Good with 4fC: M1A.28C.R4.5A Dead Channels M1A.12C.R4.1A Noise Channels Communication error: M1A.30C.R4.5A M1A.08C.R4.1A Side A

4 Good with 3fC: M1C.26D.R4.5C M1C.24D.R4.5C M1C.22D.R4.5C M1C.20D.R4.5C M1C.18D.R4.5C M1C.16D.R4.__ M1C.12D.R4.__ M1C.10D.R4.__ M1C.08D.R4.__ M1C.06D.R4.__ M1C.04D.R4.__ M1C.02D.R4.__ Good with 4fC:Dead ChannelsNoise Channels Communication error: M1C.30D.R4.5C M1C.28D.R4.5C M1C.14D.R4.__ Side C Still to be connected to the LV supply: M1C.30B.R4.__ M1C.28B.R4.__

5 Install (on Friday): 18 chambers (side A), 17 chambers (side C), 1 chamber M1R3 Good: 27 chambers ok after threshold scan Chambers with dead channels: 01 chamber with two problematic channels Communication problem: 05 chambers Still to be connected to the LV supply: 02 chambers Summary of the first week of chambers test

6 Extra slides

7 A different procedure needs to be done for M1R3 chambers. Suggestion: The analysis plots, could be divided in two or the window needs to be bigger. Impossible to see if there are a dead channel

8 Suggestion for M1R3

9 BAD PROBABLY PAD CONNECTION GOOD Examples: